STATEMENT_OF_WORK-21_Feb_2017_Bldg316_Chiller.doc
DOC document 36 KB Posted
- Attached to
- Chiller and Installation Building 316
- Solicitation number
- ChillerBuilding316
About this file
Item #13 in the Statement of Work Updated
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid_RFI_W912L6-17-B-0001_Log_05-11-2017.pdf | ||
| 17-B-0001-0002_Clause_52.228-1.pdf | ||
| Pre-Bid_RFI_W912L6-17-B-0001_Log_04-27-17.pdf | ||
| Solicitation_Modification_W912L6-17-B-0001-0001.pdf | ||
| Pre-Bid_RFI_W912L6-17-B-0001_Log_04-27-17.xlsx | XLSX spreadsheet | |
| ChillerPics.pdf | ||
| Pre-Bid_RFI_W912L6-17-B-0001_Log_04-27-17.xlsx | XLSX spreadsheet | |
| Pre-Bid_RFI_W912L6-17-B-0001_Log_04-27-17.xlsx | XLSX spreadsheet | |
| Site_Visit_Sign_In.pdf | ||
| Solicitation_W912L6-17-B-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Replace Carrier Chiller Cooling System Building 316
XHZG201501230
21 February 2017
1. The contractor shall provide all labor, material, tools, equipment and transportation necessary to complete the work identified in the plans and this Statement of Work.
2. This project is to be in accordance with the MATOC Specifications.
3. Contractor shall accumulate all hazardous and universal waste items in accordance with 40 CFR 260 – 265. Contractor is responsible for the safe and proper off-site disposal of any hazardous waste (HW) and/or universal waste (UW) generated during the project, unless otherwise specified. HW will be disposed using the installation’s EPA Identification Number.
4. Contractor will coordinate with EM prior to any HW or UW disposal actions; EM will be present anytime HW or UW is removed from the installation and will sign the manifest documents as the “generator”. Contractor will provide copies of all disposal documents and manifests.
5. Contractor dumpsters and bins will not be used to dispose of regulated hazardous wastes, universal waste, or hazardous materials (i.e. paints, solvents, fluorescent tubes, etc.
6. The contractor shall apply all safety procedures required by local, state and federal regulations.
7. All work to be performed 7:00 AM to 5:30 PM Monday thru Thursday in accordance with the general conditions stated in the MATOC Specifications. If alternate work schedule is desired it must be requested in writing and approved by CE and Security 48 hours prior to the desired schedule.
8. The contractor shall coordinate all work with a representative of the CE office.
9. Prior to any work the contractor shall submit for approval by CE a minimum of four copies of technical literature for all products to be used. Provide Material Safety Data Sheets for all appropriate products.
10. Demo the existing Carrier chiller unit at east side of building.
11. Demo the existing CW pump located in mechanical room.
12. All refrigerants from existing Carrier chiller that will be removed or salvaged shall be recovered in pressure containers suitable for shipping per DOT requirements and remain property of the Contractor. Documentation of recovered or removed refrigerants from ANG will be provided to CE.
13. The replacement shall be one (1) 115 ton 460v/3ph Carrier chiller System, Model 30RAP1156D-06314 with the following options included: Non-fused disconnect, Low sound condenser fans, Dual pumps 7 ½ hp Low ambient head pressure control, Security grilles/hail guards, BACnet communications, Digital compressors, Variable speed condenser fans (Greenspeed Intelligence), i. Fluid loop expansion tank and circuit setter and Vibration isolation pads.
14. Reinstall existing controls to connect Carrier chiller cooling system to energy management controls to include; enable/disable, supply water temp, return water temp, chiller status, pumps status.
15. Reinstall piping to bypass CW pump that had been demoed to complete closed loop system and restore flow to chilled water system leaving chemical pot feeder in place functioning.
16. Provide Carrier Start-up and first year parts and labor warranty and verify operation of CW system to be working properly. Provide written report to CE.
17. Clean all debris, waste and trash from work site and dispose of properly.
18. Repair any damaged fencing, walls/concrete, building structures that was damaged during this project.
19. Refill and sod any ruts made in grounds from equipment to complete this project.
END OF STATEMENT