Chiller Add#1

555 KB Posted

Attached to
Camden Chiller 1 Replacement
Solicitation number
CCGA2311
Issued by
Cherokee County, Georgia

About this file

This is a mechanical design drawing set for the Camden Center Chiller #1 Replacement Project at College of Coastal Georgia in Kingsland, Georgia. The drawing package, prepared by NBP Engineers, Inc., contains detailed HVAC specifications and large-scale mechanical room layouts for two mechanical rooms (205 and 237) showing both demolition and new work requirements. The project number is CCGA-2311, with the bid set dated November 14, 2022, and Addendum No. 1 issued December 2, 2022.

The drawings specify equipment removal and replacement including existing cooling coils requiring steam cleaning with mild detergent to minimize fin compaction, new variable frequency drives (VFDs) to serve supply air fans, new 54-inch by 54-inch exhaust air dampers with actuators, and new 72-inch by 12-inch minimum outdoor air dampers and 72-inch by 60-inch maximum outdoor air dampers. The work requires maintaining existing sequences with new actuators, setting minimum outdoor air damper positions at 6,200 cubic feet per minute, and retaining specified existing equipment including exhaust air fans, shutters, apparatus casings, insulation, and return air dampers. The drawing references multiple supporting documents and cross-references other project files, indicating a comprehensive design package for the chiller replacement and associated HVAC system modifications.

Text of this file

PROJECT CONSULTANTS

INDEX OF

DRAWINGS

TITLESHEET NO.

316 CORPORATE PARKWAY MACON, GEORGIA

NBP ENGINEERS, INC.

CONSULTANTS

M302

M301

M001 ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC

LARGE SCALE - MECHANICAL ROOM - DEMOLITION - HVAC

LARGE SCALE - MECHANICAL ROOM - NEW WORK - HVAC

Kingsland, Georgia

M002 DETAILS - HVAC

BID SET 11.14.22

College of Coastal Georgia Camden Center Chiller #1 Replacement

Project No.: CCGA-2311

M303 LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - HVAC

1 ADDENDUM NO. 1 12.02.22

No. REVISIONS/SUBMISSIONS DATE

SEAL

SCALE:

FILE PATH:

P:\22129\22129m303.dgn

DATE PLOTTED

DGN FILE

02-DEC-2022

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\22129\22129m303.dgn

AS SHOWN

11.14.22

22129

WSH

LTF

WSH

K in g s la n d

G e o rg ia

NBP Engineers, Inc. COA#PEF000774

COA Expiration: 6.30.2024

B

ID

S E

T

C a m d e n C e n te r

C h il le r

R e p la c e m e n t

C o ll e g e o f C o a s ta l G e o rg ia

P ro je c t

N o

C

C G

A -2

Binary Binary

Binary

Binary

Binary Binary

BinaryBinary

Binary

Binary

Binary

Binary Binary

Binary Binary

Binary

Binary

Binary Binary

BinaryBinary

Binary

Binary

Binary

Binary Binary

SAF-1

SAF-2

VFD-IB

VFD-2B

VFD-2A

w/BELLMOUTH

44/18 DN.

DRAIN

FLOOR

(TYP)

DOOR

CASING

WH

COMP.

LAB AIR

PUMP

LAB VACUUM

PLG. PIPES

CC1-1&2

FILTERS 1-1

HW UP&DN

LADDER

4" CHR DN

PREFABRICATED APPARATUS CASING

CONC. CURB

4" CHS DN

C H

R CC2-1&2

FILTERS 2-1

LADDER

4" CHR UP

C H R

RA PLENUM

RA PLENUM

CONC. CURB

SD

OA PLENUM

R. PIPE DN

ACP-S1

SD

w/GRATING & FD

96"x42" RAO

ACP-S2

SD

SD

CONC. CURB

OAL

6'-0"x8'-0"

OAL

6'-0"x8'-0"

OA PLENUM

4" CHS UP

EAF-2

EAF-1 SHUTTER TO REMAIN

EXISTING 54"x54"

AIR FAN TO REMAIN

EXISTING EAF-1 EXHAUST (RELIEF)

EXISTING

EXISTING INSULATION

(OA PLENUM)

APPARATUS CASING

FIELD FABRICATED

EXISTING

OAL

6'-0"x8'-0"

EXISTING

OAL

6'-0"x8'-0"

EXISTING

INSULATION

EXISTING

APPARATUS CASING

PREFABRICATED

EXISTING

RAD w/SCD TO REMAIN

EXISTING 15'-0"x2'-0"

APPARATUS CASING

EXISTING PREFABRICATED

w/BELLMOUTH

42/18 DN

EXISTING

HW UP&DN

EXISTING

CONC. CURB

EXISTING

EXISTING

TO REMAIN

w/GRATING & FD

72"x42" RAO

EXISTING

(TYP)

CASING DOOR

EXISTING

CASING

APPARATUS

PREFABRICATED

EXISTING

INSULATION

EXISTING

TO REMAINRAD w/SCD

EXISTING 15'-0"x2'-0"

EXISTING

6" DEEP INERTIA BASE

TO FIT FAN

EXISTING

TO REMAIN

SHUTTER TO REMAIN

EXISTING 54"x54"

EXISTING INSULATION

(OA PLENUM)

APPARATUS CASING

FIELD FABRICATED

EXISTING

EXISTING

TO REMAIN

SAF-1

CURB

CONC.

SAF-2

VFD-IB

VFD-IA

VFD-2B

VFD-2A

w/BELLMOUTH

44/18 DN.

DRAIN

FLOOR

(TYP)

DOOR

CASING

WH

COMP.

LAB AIR

PUMP

LAB VACUUM

LARGE SCALE - MECHANICAL ROOM 205 - DEMOLITION - HVAC

SCALE:

= 1'-0

4 0 2 4 8

LARGE SCALE - MECHANICAL ROOM 237 - DEMOLITION - HVAC

SCALE:

= 1'-0

4 0 2 4 8

PLG. PIPES

EXISTING TO REMAIN

DEMOLITION

NEW WORK

POINT OF CONNECTION

LINE LEGEND

CC1-1&2

FILTERS 1-1

HW UP&DN

LADDER

4" CHR DN

PREFABRICATED APPARATUS CASING

CONC. CURB

4" CHS DN

C H

R CC2-1&2

FILTERS 2-1

LADDER

4" CHR UP

C H R

M303

NEW WORK - HVAC

DEMOLITION &

MECHANICAL ROOMS -

LARGE SCALE -

SCALE:

= 1'-0

4 0 2 4 8

SCALE:

= 1'-0

4 0 2 4 8

LARGE SCALE - MECHANICAL ROOM 205 - NEW WORK - HVAC LARGE SCALE - MECHANICAL ROOM 237 - NEW WORK - HVAC 1

1 ADDENDUM NO. 1 12.02.22

RA PLENUM

RA PLENUM

CONC. CURB

SD

OA PLENUM

R. PIPE DN

ACP-S1

SD

w/GRATING & FD

96"x42" RAO

ACP-S2

SD

SD

CONC. CURB

OAL

6'-0"x8'-0"

OAL

6'-0"x8'-0"

OA PLENUM

4" CHS UP

EAF-2

EAF-1

DAMPER

54"x54" EXHAUST AIR

REMOVE EXISTING

SHUTTER TO REMAIN

EXISTING 54"x54"

AIR FAN TO REMAIN

EXISTING EAF-1 EXHAUST (RELIEF)

EXISTING

REMOVE

EXISTING

EXISTING INSULATION

(OA PLENUM)

APPARATUS CASING

FIELD FABRICATED

EXISTING

OAL

6'-0"x8'-0"

EXISTING

OAL

6'-0"x8'-0"

EXISTING

INSULATION

EXISTING

APPARATUS CASING

PREFABRICATED

EXISTING

6'-0"x5'-0" MAX. OAD

SET @ 6,200|

6'-0"x1'-0" MIN. OAD;

REMOVE

RAD w/SCD TO REMAIN

EXISTING 15'-0"x2'-0"

NOTES:(THIS SHEET ONLY)

COMPACTION IN COIL FINS.

CLEANING ON LEAVING AIR SIDE OF COIL TO MINIMIZE CHANCE OF

STEAM CLEAN EXISTING COOLING COIL W/MILD DETERGENT. START

PROVIDE NEW VFD TO SERVE SAF-1.

EXISTING SEQUENCE.

PROVIDE NEW 54"x54" EXHAUST AIR DAMPER & ACTUATOR. MAINTAIN

APPARATUS CASING

EXISTING PREFABRICATED

w/BELLMOUTH

42/18 DN

EXISTING

HW UP&DN

EXISTING

CONC. CURB

EXISTING

EXISTING

TO REMAIN

w/GRATING & FD

72"x42" RAO

EXISTING

(TYP)

CASING DOOR

EXISTING

CASING

APPARATUS

PREFABRICATED

EXISTING

INSULATION

EXISTING

TO REMAINRAD w/SCD

EXISTING 15'-0"x2'-0"

EXISTING

6" DEEP INERTIA BASE

TO FIT FAN

EXISTING

TO REMAIN

6'-0"x5'-0" MAX. OAD

SET @ 6,200|

6'-0"x1'-0" MIN. OAD;

REMOVE EXISTING

AIR DAMPER

54"x54" EXHAUST

REMOVE EXISTING

SHUTTER TO REMAIN

EXISTING 54"x54"

EXISTING INSULATION

(OA PLENUM)

APPARATUS CASING

FIELD FABRICATED

EXISTING

EXISTING

TO REMAIN

SEQUENCES.

WITH NEW ACTUATORS. SET MIN. AT 6,200 AND MAINTAIN EXISTING

PROVIDE NEW 72"x12" MIN. OAD AND NEW 72"x60" MAX. OAD

22129aCov
22129m303
References
tb, 22129tb.dgn
afp1, 22129a2.dgn
afp2, 22129a2.dgn
af3, 22129a2.dgn
afp4, 22129a2.dgn
existing, 22129m303.dgn

Other files

File Type Posted
Add #1 Main Campus CEP CT#2 —
Bid Invite —
Project manual —
Drawings —
Addendum 1 —
Bid Results —
Award Information —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .