Text version

B-1

PLANS AND SPECIFICATIONS

FOR THE 2023 OVERHAUL OF

48’ SURVEY VESSEL CHERNESKI

B-2

Drydock and perform repairs to Surveyboat CHERNESKI of the USACE PHILADELPHIA DISTRICT in accordance with the attached plans and specifications:

ITEM UNIT TOTAL

NUMBER ITEM

QTY

UNIT PRICE PRICE

0001 REPAIRS TO S/V CHERNESKI

1 VSSL XXXX XXXXX

0001A

0001B

0001C

0001D

0001E

0001F

0001G

0001H

0001I

0001J

0001K

0001L

0001M

0001N

0001O

0001P

0001QA

H-101 DRYDOCKING AND REPAIRS

The contractor may not start this item until he receives a Notice To Proceed for this item.

H-102 Utilities and Services

H-200 Surface Preparation & Inspection

H-201 Hull Painting & Anode Replacement

H-202 Replace Section of Rub Rail

H-203 Replace Cabin Toilet (If-Directed)

H-204 Modify Surveyor’s Station

H-205 Modify Helm Console & Install New Electronics Equipment and Monitors

H-206 Install Elec Dist Pnl & Repower Fire Pump

H-207 Clean Fuel Tanks and Replace Fuel Sys Valves

M-101 Main Engine Service

M-102 Check Engine Mounts

M-103 Replace Engine Exhaust Sys Bracing

M-201 Install Generator (If-Directed)

M-701 Inspect Shaft Seals and Bearings

M-702 Replace Propellers (If-Directed)

M-901 Misc Maintenance (If-Directed)

A. LABOR

JB

DY

JB

JB

JB

HR

B-3

0001QB

0001QC

M-901 Misc Maintenance (If Directed)

B. MATERIALS

M-901 Misc Maintenance (INSERT % RATE)

C. BURDEN CHARGES

TOTAL FOR ITEM 0001

TOTAL

It is the intent of the Philadelphia District, USACE to deliver the vessel to the Shipyard between 15 March, 2023 and 26 April, 2023. Delivery of the Vessel after Contract Award will initiate the Notice to Proceed and start the Period of Performance, which is 30 calendar days after delivery.

INSERT LOCATION OF THE SHIPYARD WHERE THE WORK WILL BE PERFORMED:

The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly overstated for other work.

(52.217-5)

Refer to Contract Section M for Evaluation and Award criteria.

PLANS AND SPECIFICATIONS