About this file

This Request for Proposals (RFP) is issued by Chatham County, North Carolina, seeking qualified security camera and network cabling firms to design, furnish, install, configure, test, document, and support a replacement video-surveillance solution for the Chatham County Justice Center and exterior video surveillance coverage at the Chatham County Historic Courthouse. The project includes replacement of existing security cameras and legacy coaxial cabling, installation of additional cameras to address coverage gaps, and exterior camera installation at the Historic Courthouse. The RFP was released November 13, 2026, with a mandatory pre-bid site visit scheduled for December 1, 2026, at 10:30 a.m. at the Justice Center (40 E. Street, Pittsboro, NC 27312) and the Historic Courthouse (9 Hillsboro St., Pittsboro, NC 27312). The deadline for submitting questions is December 3, 2026, by 5:00 p.m. EST, with responses posted by December 7, 2026. Project proposals are due December 11, 2026, by 5:00 p.m. EST. The successful respondent must complete the project within eight months of award. Submission requires a minimum of three hard copies and one electronic PDF copy delivered to Michele Peluso, Chatham County Procurement Manager.

The payment for this project will be a negotiated total cost for the entire scope of work as determined by final project deliverables. The county will negotiate scope details with respondents, including all aspects of system implementation. Respondents must demonstrate substantial experience in IP video-surveillance systems, structured cabling installation, video-management systems, and work in occupied public buildings and historic structures. Insurance requirements include Workers' Compensation with $500,000 employer's liability coverage, Commercial General Liability with minimum limits of $100,000 per person and $500,000 per occurrence bodily injury, and Automobile Liability with $250,000 combined single limit. The proposal must include a one-year minimum manufacturer warranty on all cameras, cabling components, hardware, and installation workmanship, plus a minimum 24-month post-installation support option. The county reserves the right to reject any and all proposals and will not accept proposals by fax or email. All prices quoted must remain firm for 90 days following the bid deadline.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

(FY27)

1 | P a g e

Information Technology (IT)

Request for Proposals (RFP)

Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

Chatham County, North Carolina

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

2 | P a g e

Section 1 – Advertisement

Chatham County, North Carolina Request for Proposals (RFP)

Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

Chatham County IT is requesting project proposals from qualified security camera and cabling firms to replace security cameras and the cabling that connects them for public safety and surveillance in the Chatham County Justice Center and the exterior of the Historic Courthouse, per the specifications detailed in this document. The desired project specifications are outlined in Section 4 of this document.

A pre-bid site visit will be held at the Chatham County Justice Center on Tuesday, December 1, 2026, at 10:30 am to review existing conditions and to address any questions vendors may have about the desired project specifications. Attendance at the site visit is a mandatory prerequisite to submit a project proposal. The physical address of the Chatham County Justice Center is 40 E. Street, Pittsboro, NC, 27312. We will walk to the Historic Courthouse located at 9 Hillsboro St., Pittsboro, NC 27312, after touring the Justice Center.

Submittals must be received per the detailed submittal instructions in Section 2 of this document, with a minimum of three (3) hard copies and one (1) electronic media copy sent to:

Michele Peluso, Chatham County Procurement Manager Chatham County Finance Office

12 East Street Pittsboro, NC 27312 (Physical Delivery) PO Box 608 Pittsboro, NC 27312 (Postal Delivery)

All questions relating to this RFP must be received by Thursday, December 3, 2026, by 5:00 PM EST. If questions are submitted, an addendum with responses will be posted by Monday, December 7, 2026, at

5:00 PM EST.

Submitted questions must be in writing and addressed to: Michele Peluso, Chatham County Finance Office PO Box 608 Pittsboro, NC 27312; or faxed to 919-542-4261; or emailed to:

purchasing@chathamcountync.gov

This solicitation and others can be located on the Chatham County Current Bids and Proposals webpage

Chatham County is an Equal Opportunity Employer and does not discriminate on the basis of sex, marital status, race, color, creed, national origin, sexual orientation, gender identity, age or disability.

Released: November 13, 2026 file://fs1.chathamcountync.gov/Finance/Purchasing/Bids/Bids%202027/RFP%20Justic%20Center%20&%20Historic%20Courthouse%20Security%20Camera/purchasing@chathamcountync.gov https://www.chathamcountync.gov/government/departments-programs-a-h/finance/bid-proposal-opportunities

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

3 | P a g e

Section 2 – Submittal Instructions & Guidelines

2.1 Schedule

RFP Process RFP Deadline RFP Issued 11/13/26 Pre-Bid Site Visit 12/1/26 at 10:30 AM EST Deadline for Questions 12/3/26 by 5:00 PM EST Response to Questions Posted 12/7/26 by 5:00 PM EST Deadline for Project Proposals 12/11/26 by 5:00 PM EST

2.2 Requirements for Project Proposals

Project proposals must include a minimum of three (3) hard copies and one (1) electronic PDF version of the proposal (excluding any materials that are non-electronic) in a sealed envelope/package, clearly marked on the outside with the following: “Chatham County Justice Center and Historic Courthouse Security Camera Replacement and Ethernet Rewiring”. To be considered, project proposals must be received by 5:00 PM EST on December 11, 2026, to the following address:

Michele Peluso, Chatham County Procurement Manager Chatham County Finance Office

12 East Street Pittsboro, NC 27312 (Physical Delivery) PO Box 608 Pittsboro, NC 27312 (Postal Delivery)

The electronic PDF version of the proposal (excluding non-electronic materials) must be submitted by the deadline above to: purchasing@chathamcountync.gov or may be included in the proposal packet on digital media.

A pre-bid site visit will be held at the Chatham County Justice Center on Tuesday, December 1, 2026, at 10:30 AM to review existing conditions and to address any questions vendors may have about the desired project specifications. Attendance at the site visit is a mandatory prerequisite to submit a project proposal. The physical address of the Chatham County Justice Center is 40 E. Street, Pittsboro, NC, 27312. We will walk to the Historic Courthouse located at 9 Hillsboro St., Pittsboro, NC 27312, after touring the Justice Center.

1. Responses received after the assigned time will not be accepted.

2. Vendors responding to this RFP may withdraw their bids any time prior to the deadline on

December 11, 2026, but the withdrawal must be submitted in writing and signed by the proposing vendor.

3. All inquiries, questions, and corrections relating to this request should be in writing and submitted to Michele Peluso at the following email address:

• purchasing@chathamcountync.gov

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

4 | P a g e

4. If a responding vendor finds discrepancies or omissions from the specifications or should require additional clarification of any part, a written request for interpretation shall be submitted to Michele Peluso.

5. Any interpretation of, or changes made to the request will be made by written addendum to each known proposed vendor, posted on the County bid opportunity website, and shall become part of the request for any contract awarded. The County will not be responsible for the accuracy of any other oral explanations, interpretations, or representations. All inquiries must be made no later than December 3, 2026, by 5:00 PM EST to purchasing@chathamcountync.gov or by fax to (919)-542-4261. No RFP inquiry telephone calls please.

6. It shall be the responsibility of each proposing organization or individual to verify that every addendum has been received prior to submitting qualifications.

7. The submission of material shall be deemed a representation and certification that the proposing vendor:

• Has carefully read and fully understands the information provided by Chatham County in this

RFP

• Is financially solvent and has the capability to successfully undertake and complete the responsibilities and obligations of the material submitted.

• Represents that all the information contained in the submitted material is true and correct.

• Did not in any way collude or conspire with any other parties, directly or indirectly, regarding the amount, terms, or conditions of this request.

• Acknowledges that Chatham County has the right to make any inquiry it deems appropriate to substantiate or supplement information provided by proposing vendors and hereby grants Chatham County permission to make these inquiries and acknowledges that any submittal cannot be modified after its submission for any reason.

8. Late submittals will not be accepted under any circumstance and will not be opened or reviewed. We will not accept project proposals by fax or e-mail. The sender must allow ample delivery time for the selected shipment or transmission methods.

9. Unless otherwise specified in this document, all words shall have a common meaning unless the context in which they are used clearly requires a different meaning. Words in the singular number include the plural, and in the plural include the singular.

10. Include the Vendor Form (Attachment A) with your submission.

2.3 Questions

Questions are to be submitted by 5:00 PM EST on December 3, 2026, to Michele Peluso, Chatham County Finance Procurement Officer, at purchasing@chathamcountync.gov. An addendum with all questions and answers will be posted to the County’s website by 5:00 PM EST on December 7, 2026, if questions are submitted.

2.4 Communication

Respondents may not have communication of any type with Chatham County personnel or boards upon issuance of this RFP outside of the guidelines provided for communication within the RFP.

2.5 Intent to Submit

mailto:purchasing@chathamcountync.gov https://www.chathamcountync.gov/government/bid-proposal-opportunities

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

5 | P a g e

All respondents who intend to submit an RFP response should e-mail purchasing@chathamcountync.gov.

2.6 Cost of Response Preparation

All costs, including travel and expenses, incurred in the preparation of a response to this RFP will be borne solely by the respondent.

2.7 Insurance

During the term of the contract, the Contractor, at its sole cost and expense, shall provide commercial insurance of such type and with such terms and limits as may be reasonably associated with the contract. As a minimum, the Contractor shall provide and maintain the following coverage and limits:

a) Worker’s Compensation - The Contractor shall provide and maintain Workers’ Compensation Insurance as required by the laws of North Carolina, as well as employer’s liability coverage with minimum limits of $500,000, covering all of Contractor’s employees who are engaged in any work under the contract. If any work is sublet, the Contractor shall require the subcontractor to provide the same coverage for any of his employees engaged in any work under the contract. (Non-applicable-individual.)

b) Commercial General Liability - General Liability Coverage on a Comprehensive Broad Form on an occurrence basis in the minimum amount of $100,000 bodily injury per person, $500,000 bodily injury per occurrence and $100,000 property damage, and 1,000,000 in errors and omissions and negligent performance. (Defense costs shall be in excess of the limit of liability.)

c) Automobile - Automobile Liability Insurance, to include liability coverage, covering all owned, hired, and non-owned vehicles used in performance of the contract. The minimum combined single limit shall be $250,000.00 bodily injury and $100,000 property damage.

The County shall be named as an additional insured on both the professional liability and comprehensive general liability coverage. Contractor shall furnish copies of all such policies and all renewals, terminations, and alterations to the County on a current basis.

2.8 Equal Opportunity

The non-discrimination clause contained in Section 202 (Federal) Executive Order 11246, as amended by Executive Order 11375, relative to Equal Employment Opportunity for all persons without regard to race, color, religion, sex or national origin, and the implementing rules and regulations prescribed by the Secretary of Labor, are incorporated herein.

The Respondent agrees not to discriminate against any employees or applicant for employment because of physical or mental handicap in regard to any position for which the employees or applicant is qualified.

Pursuant to GS 143-48, Chatham County encourages small contractors, minority contractors, physically handicapped contractors, and women contractors to submit proposals in response to this RFP.

mailto:purchasing@chathamcountync.gov

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

6 | P a g e

2.9 Right to Reject

Chatham County reserves the right to reject any and all submittals or any part thereof and to select the most responsive firm that is deemed in the best interest of Chatham County.

Section 3 – Scope of Work

Chatham County is soliciting proposals from qualified security surveillance and structured-cabling firms to design, furnish, install, configure, test, document, and support a replacement video-surveillance solution for the Chatham County Justice Center and exterior video surveillance coverage at the Chatham County Historic Courthouse.

The project includes replacement of existing Justice Center security cameras and associated legacy camera cabling, installation of additional cameras where necessary to address identified coverage gaps, and installation or replacement of exterior cameras at the Historic Courthouse. The successful Respondent shall provide a complete, operational, and integrated solution, including all labor, equipment, materials, mounting hardware, pathway components, network cabling, terminations, patching, labeling, configuration, testing, training, closeout documentation, and warranty support necessary for successful deployment.

The Justice Center scope includes interior and exterior cameras, replacement of existing coaxial camera cabling with Ethernet-based structured cabling where specified or determined necessary during design, and connectivity of each camera to the County-designated video surveillance environment. The Historic Courthouse scope is limited to exterior camera coverage and must be performed in a manner that protects the historic character, exterior finishes, and architectural features of the building.

The Respondent shall perform a site assessment and submit a proposed camera-placement and cabling design for County review before installation. The proposed design shall account for required coverage areas, lighting conditions, camera mounting heights, physical obstructions, fields of view, retention and storage requirements, network capacity, cybersecurity, maintenance access, and the operational needs of law-enforcement, court, and County personnel.

The selected Respondent shall coordinate all work with Chatham County IT and other County-designated stakeholders. Work must be scheduled and performed to minimize disruption to court operations, public access, County offices, building occupants, and security operations.

Each Vendor must have the financial ability to undertake the work and assume the liability. Each selected Vendor will be required to furnish proof of sufficient Professional Liability Insurance coverage as determined by Chatham County in section 2.7 of this document. Each Vendor must have an accounting system to identify costs chargeable to the project.

The payment for the Justice Center Camera Replacement with Cabling Replacement, along with Historic Courthouse Exterior Camera Replacement project, will be a negotiated total cost for the entire project as determined by the negotiated final project deliverables outlined in Section 4 of this document.

Chatham County will negotiate the scope of work in detail with respondents of this RFP, including all facets related to a successful project implementation of this type.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

7 | P a g e

Vendors are cautioned that this RFP is a request for proposals only. Therefore, Chatham County reserves the unqualified right to reject all project proposals when such rejection is deemed to be in the best interest of Chatham County, NC.

Section 4 – Project Specifications, Standards, & Deliverables

4.1 Project Expectations

The requirements in this section establish the County’s minimum technical, installation, testing, documentation, and support expectations. Respondents shall provide a detailed proposed solution that meets or exceeds these requirements and shall clearly identify any exceptions, assumptions, optional components, or recommended alternatives.

The Respondent is responsible for validating existing conditions during the mandatory pre-bid site visit.

The County expects the Respondent to identify conditions that may affect installation, including existing cable pathways, inaccessible ceilings or wall spaces, electrical requirements, mounting limitations, asbestos or lead-paint considerations where applicable, historic-preservation limitations, network closet capacity, and operational constraints.

The final scope, camera locations, cable routes, equipment quantities, and implementation schedule will be finalized with the selected Respondent after County review of the proposed design.

4.2 Existing Conditions

The Justice Center’s existing security-camera system and much of its associated camera cabling are original to the building and are due for replacement. Existing camera coverage includes interior and exterior areas; however, the County anticipates that additional or repositioned cameras may be necessary to eliminate coverage gaps and provide more complete visibility of public areas, building approaches, circulation areas, entrances and exits, and surrounding grounds.

Existing Justice Center cameras may be connected using legacy coaxial cabling and related infrastructure. The County intends to transition the applicable camera connections to Ethernet-based network cabling and Power over Ethernet (PoE), subject to the final approved design. Respondents shall assess the existing cabling, pathways, closets, racks, patch panels, electrical availability, grounding, and network connectivity as part of their site review.

The Historic Courthouse requires exterior video coverage of its four exterior doors, the surrounding courthouse grounds, the traffic circle, and sidewalks across the street where technically feasible and legally appropriate. Respondents shall evaluate lighting, distance, viewing angles, line-of-sight obstructions, vehicle and pedestrian traffic, and nighttime conditions when recommending cameras and camera placement.

The County will provide reasonable access to applicable facilities and technical stakeholders during the project. Respondents shall identify any information, access, permits, utility locates, shutdown windows, or County coordination needed to complete the work.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

8 | P a g e

4.3 Camera System Requirements

The proposed solution shall include commercial-grade IP security cameras and all required accessories, licenses, mounting hardware, network components, and software necessary to provide a fully functioning surveillance system.

At a minimum, the proposed camera solution shall:

• Use current-generation IP cameras suitable for indoor or outdoor use based on the installation location.

• Send video to County-owned storage, not stored offsite or in cloud storage.

• Provide image quality sufficient to support identification and investigation activities in the intended coverage area.

• Support low-light or infrared operation where required for nighttime coverage.

• Include wide dynamic range or equivalent capability for entrances, exterior areas, and other locations with significant lighting variation.

• Provide weather-resistant, vandal-resistant camera housings and mounting hardware for exterior or high-risk locations, as appropriate.

• Use PoE or PoE+ where supported by the selected camera design and required power load.

• Include fixed, varifocal, panoramic, PTZ, multi-sensor, or other camera types only where justified by the approved camera-placement design and operational need.

• Permit authorized County personnel to view live and recorded video through the County-approved video management system.

• Support secure, role-based user access and audit logging, if supported by the selected video management system.

• Synchronize camera time with the County-approved network time source or designated time service.

• Support current, vendor-supported firmware and software versions at the time of final acceptance.

• Be fully licensed for all cameras included in the proposal, with no undisclosed recurring licensing requirements.

Camera and Video Stream Requirements The proposed camera system shall meet the following minimum performance requirements:

• Frame rate: Each camera shall deliver video at no less than 15 frames per second (fps) at the specified resolution.

• Resolution: Each camera shall provide a native video resolution of at least 3840 × 2160 pixels (4K

UHD).

• Compression: Each camera and the proposed recording system shall support H.265 video compression.

These requirements shall be met simultaneously, with H.265 compression enabled, during live viewing and recording on all cameras. The proposed cabling, network infrastructure, and recording system shall support this performance across the complete system.

Respondents shall provide a camera schedule that identifies, for each proposed camera:

• Location and coverage area.

• Camera manufacturer, model, and form factor.

• Resolution, lens type, viewing angle, and low-light or infrared capability.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

9 | P a g e

• Mounting method and approximate mounting height.

• Environmental and vandal-resistance rating, where applicable.

• Power method and estimated PoE requirement.

• Required video management system license and any related recurring subscription or support requirement.

Respondents shall describe how their proposed camera placements address the County’s coverage objectives while avoiding unnecessary recording of areas not relevant to County security operations.

4.4 Video Management, Recording, and Integration

The Respondent shall identify the proposed video management system, recorder, storage platform, licensing model, and all server, appliance, or cloud components required for operation. If the County has an existing video management system or recording environment that it intends to retain, the Respondent shall describe compatibility, integration requirements, licensing impacts, and any limitations.

The proposed solution shall include:

• Live viewing and recorded-video playback for authorized County personnel.

• Search and export functions that allow authorized users to retrieve video by camera, date, time, and event criteria.

• Export options that preserve evidentiary integrity and include an appropriate video player or verification method when required.

• Health monitoring or alerting for camera offline status, storage issues, recording failures, or other significant system faults.

• Clearly documented video-retention assumptions, storage calculations, bandwidth estimates, and recording settings.

• Integration capability with the County’s door-access or door-lock system where technically feasible and approved by the County. The Respondent shall describe proposed integration methods, required third-party licenses, and any limitations.

• Secure remote access only through County-approved methods and subject to County security requirements.

The proposal shall clearly state whether each component is included in the base price, optional, or excluded.

4.5 Structured Cabling and Network Requirements

The Justice Center cabling portion of this project shall replace applicable legacy coaxial camera cabling with standards-based Ethernet structured cabling. The Respondent shall furnish and install all cable, pathways, terminations, patch panels, patch cords, faceplates, surface raceway, conduit, sleeves, firestopping, grounding and bonding components, labeling materials, and other accessories necessary for a complete installation.

Unless otherwise approved by the County in writing, camera cabling shall meet the following minimum requirements:

• New horizontal copper cabling shall be Category 6 or better, plenum-rated where required by code or installation environment.

• Each IP camera shall have a dedicated, continuous cable run from the camera location to the designated telecommunications room, intermediate distribution point, or approved network-aggregation location.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

10 | P a g e

• Cable runs shall comply with applicable structured-cabling standards, electrical codes, fire codes, and manufacturer installation requirements.

• Cabling shall be installed in a neat, protected, serviceable manner and shall not create trip hazards, impede building operations, or detract from the appearance of public or historic areas.

• Cable penetrations shall be properly sleeved, sealed, and fire-stopped using code-compliant materials.

• Exterior cabling shall be appropriately rated and protected from weather, ultraviolet exposure, physical damage, and moisture intrusion.

• Cable pathways shall maintain appropriate separation from electrical and other sources of electromagnetic interference.

• All cable runs, patch panels, ports, outlets, and camera endpoints shall be permanently labeled using a logical, consistent labeling scheme approved by the County.

• Existing cabling that is abandoned as part of this project shall be removed where reasonably accessible, or otherwise properly secured, labeled as abandoned, and documented.

• All cabling shall be tested and certified to the applicable Category 6 or higher performance standard. The Respondent shall provide electronic certification-test results as part of project closeout.

• Provide and install fiber-optic cabling from the second and third floors to the first floor, including all required terminations, connections, labeling, and testing.

• Provide and install Ethernet switches as part of the project and terminate and connect all camera network cabling to the appropriate switches.

The Respondent shall identify any cable runs that exceed copper Ethernet distance limitations or present unusual pathway constraints. For such locations, the Respondent shall propose suitable alternatives, such as fiber-optic cabling, intermediate network equipment, or other approved methods.

Any active network equipment proposed outside a County telecommunications room must be protected in an appropriate enclosure and include required power, surge protection, environmental protection, and maintenance access.

4.6 Installation Requirements

The Respondent shall provide all labor and materials required to complete the installation in a professional, secure, and workmanlike manner.

Installation requirements include:

• Coordinate all work schedules, access requirements, and disruption windows with Chatham County.

• Protect occupied areas, furnishings, and building finishes during installation.

• Maintain safe work areas and comply with all applicable OSHA, building, electrical, fire, and safety requirements.

• Use mounting methods appropriate to the building material and camera weight, including secure attachment to structural elements where required.

• Avoid mounting cameras where vibration, glare, obstruction, or exposure to tampering would materially impair video quality or system reliability.

• Restore walls, ceilings, penetrations, finishes, landscaping, and other affected surfaces to a condition equal to or better than their pre-installation condition.

• Provide surge protection, grounding, and bonding appropriate to exterior cameras, exposed cabling, network equipment, and power sources.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

11 | P a g e

• Coordinate with County IT before connecting cameras, switches, recorders, or other equipment to the County network.

• Use County-approved IP addressing, VLAN, switching, authentication, and remote-access practices where applicable.

• Ensure that default passwords are changed, unnecessary services are disabled, and all installed equipment is secured before final acceptance.

4.7 Historic Courthouse Requirements

Because the Chatham County Historic Courthouse is listed on the National Register of Historic Places, all exterior camera and associated cabling work must preserve the building’s historic character and minimize visual impact.

The Respondent shall:

• Conduct a site-specific assessment of proposed camera locations, mounting methods, cable pathways, and equipment enclosures.

• Use the least invasive practical installation method.

• Avoid unnecessary penetrations into historic masonry, stonework, woodwork, decorative elements, and other character-defining features.

• Conceal cabling and mounting hardware to the greatest extent practical without compromising system reliability, maintenance access, safety, or code compliance.

• Use camera finishes, housings, and mounting hardware that minimize visual contrast with the installation surface where practical.

• Obtain County approval of all proposed exterior camera locations, mounting details, visible pathway components, and penetrations before beginning work.

• Coordinate with County-designated facilities, historic-preservation, and project representatives as required.

• Document all final camera locations, mounting methods, cable routes, and building penetrations.

No installation activity that changes the building exterior, creates a visible penetration, or requires alteration of historic material may begin until the County has approved the proposed installation approach.

4.8 Testing, Acceptance, and Documentation

The Respondent shall complete functional, performance, and acceptance testing before requesting final acceptance. Testing shall be performed in coordination with Chatham County IT and County-designated operational stakeholders.

At a minimum, the Respondent shall test and demonstrate:

• Live-video viewing from each installed camera.

• Recording and playback from each installed camera.

• Correct camera naming, location identification, time synchronization, and video-management-system configuration.

• Required camera views, field of view, focus, image quality, and nighttime performance.

• PTZ movement, presets, and control functionality for any PTZ cameras.

• Camera connectivity, PoE operation, switch-port status, and network performance.

• Video export and playback capability.

• System alerts or health-monitoring functions, where included.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

12 | P a g e

• Door-access or door-lock integration functions, where included.

• Successful completion of cable certification testing for all new copper cable runs.

• Proper labeling of cameras, cabling, patch panels, ports, racks, and related equipment.

Prior to final acceptance, the Respondent shall correct deficiencies identified during testing at no additional cost to the County.

The Respondent shall provide the following project-closeout documentation in both electronic and editable formats, where applicable:

• Final camera schedule and camera-location map.

• Floor plans or site plans showing camera locations, viewing direction, cable routes, telecommunications rooms, and network-connection points.

• Cable identification schedule and electronic cable-certification test results.

• Network equipment, patch-panel, switch-port, and power-use documentation.

• Equipment inventory including manufacturer, model, serial number, warranty information, firmware version, and assigned location.

• Video-management-system configuration documentation, administrator procedures, and license inventory.

• Manufacturer data sheets, installation manuals, warranties, and maintenance instructions.

• Record drawings showing approved deviations from the original design.

• A list of open issues, if any, and the schedule for resolution.

4.9 Training, Warranty, and Support

The Respondent shall provide training for County-designated IT, security, facilities, and operational personnel. Training shall include routine operation, live view, playback, export, camera health monitoring, basic troubleshooting, user administration as applicable, and escalation procedures for support requests.

The proposal shall include:

• A minimum one-year manufacturer warranty on cameras, cabling components, hardware, and installation workmanship, unless the Respondent proposes a longer warranty.

• A description of warranty coverage, exclusions, response times, replacement procedures, and escalation contacts.

• A minimum 24-month post-installation support option, separately identified in the proposal if not included in the base project cost.

• A description of available preventative maintenance, firmware-update, health-monitoring, repair, and replacement services.

• Identification of any recurring costs, including software subscriptions, camera licenses, cloud storage, support agreements, and manufacturer maintenance contracts.

Section 5 – Qualifications Package & Experience

5.1 Qualifications & Experience

Prospective Respondents should demonstrate substantial experience in the design, installation, testing, documentation, and support of IP video-surveillance systems and structured-cabling installations for public-sector, justice, law-enforcement, courthouse, government, or similarly complex occupied facilities.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

13 | P a g e

Respondents shall demonstrate competency in the following areas:

• Design and installation of enterprise IP camera systems, including interior, exterior, low-light, and wide-area surveillance applications.

• Structured copper and fiber-optic cabling installation, testing, certification, labeling, pathway management, firestopping, grounding, and documentation.

• Video-management systems, video recording and retention design, bandwidth planning, user administration, and secure system configuration.

• Integration of video surveillance systems with access-control, door-lock, or related physical-security systems.

• Installation in occupied public buildings with minimal disruption to business, court, public-safety, and public-access operations.

• Experience working in historic buildings or in environments requiring careful preservation of historic finishes and architectural features.

• Development of camera-placement plans, coverage assessments, record drawings, cable-test documentation, and closeout packages.

• Provision of responsive local or regional maintenance, warranty, and post-installation support.

5.2 Project Proposals

Please include the following information as part of your Project Proposal:

• A cover letter that identifies a contact person and all contact information.

• Company Information – Provide your company’s full legal name, primary office location, and years of experience.

• Describe your team’s approach to successfully delivering the project deliverables described in the RFP (ex. project run book or play book)

• Brief description of the firm’s experience in providing camera surveillance services for public entities. Submit demonstrated experience for comparable projects you have participated with in the past. The description of the firm’s experience should include projects undertaken in the past three (3) years.

• Evidence that insurance policies are maintained by the firm as stated in the RFP.

• Resume(s) of primary contact professionals.

5.3 Availability

The successful Respondent should be available to commence the project within a timeframe that would allow for completion of the project within 8 months of project award. Vendors responding to this RFP should be aware of procurement delays that could possibly result in an inability to meet this project timeline and provide these proactively with your project proposal.

Section 6 – Selection Criteria / Evaluation

As part of the Vendor selection process, Chatham County will consider the following:

• Specialized or appropriate staff expertise

• Overall cost-benefit of the project

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

14 | P a g e

• Ability to perform services in a timely manner

• Previous experience with this type of work

• Demonstrated experience with proposed equipment

• Support capabilities in Chatham County, NC

• Experience working in Historic Buildings

• Transparency, quality, and thoroughness of the proposal

• Quality and completeness of the proposed camera-coverage design.

• Suitability, interoperability, and lifecycle supportability of proposed camera, video-management, recording, and network components.

• Quality of the proposed Ethernet cabling design, pathway approach, testing methodology, labeling, and closeout documentation.

• Demonstrated ability to protect the historic character of the Historic Courthouse.

• Experience with comparable justice, courthouse, public-safety, local-government, or high-availability surveillance installations.

• Security of the proposed IP-camera and video-management architecture.

• Training, warranty, local support capability, response commitments, and clarity of recurring-cost disclosures.

• Completeness of the implementation plan and ability to minimize disruption to court and County operations.

The above listing does not indicate the order of importance. The selection committee shall establish a priority ranking for the final list of criteria for the project.

Section 7 –County Requirements

7.1 E-Verify

Effective September 4, 2013, North Carolina local government units are prohibited from entering into certain contracts unless the contractor and the contractor’s subcontractors, if any, comply with the requirements of N.C. Gen. Stats. §64-26(a). Prior to providing any services hereunder, Contractor and Contractor’s subcontractors, if any, are subject to the provisions of N.C. Gen. Stats.

§64-26(a). Contractor agrees to fully comply with such statute and require Contractor’s subcontractors, if any, to fully comply with such statute.

7.2 Iran Divestment Act

Effective October 1, 2015, North Carolina local government units are prohibited from entering into certain contracts unless the contractor and the contractor’s subcontractors, if any, comply with the requirements of §143C-6A-5. Contractor agrees to fully comply with such statute and require Contractors subcontractors, if any, to fully comply with such statute.

7.3 Additional County Conditions

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

15 | P a g e

• All proposing firms or individuals shall comply with all conditions, requirements, and specifications contained herein, with any departure constituting sufficient cause for rejection of the proposals. However, Chatham County reserves the right to change the conditions, requirements, and specifications as it deems necessary.

• The proposal must be signed by a duly authorized official of the proposing organization or individual submitting the proposal.

• No proposal will be accepted from any person or organization that is in arrears for any obligation to Chatham County, or that otherwise may be deemed irresponsible or unresponsive by County staff, the Chatham County Board of Commissioners, or the Chatham County Economic Development Corporation.

• Chatham County is not obligated to enter into any contract as a result of the RFP.

• All prices quoted must be firm for a period of 90 (ninety) days following the bid deadline.

• Chatham County reserves the right to reject any and all proposals or any part thereof and to select the most responsive proposal that is deemed in the best interest of Chatham County.

• Only one proposal will be awarded as the result of the RFP.

• Chatham County may approve or disapprove the use of specific proposed subcontractors in any proposal.

• Chatham County reserves the right to enter into an agreement with another proposing vendor in the event that the originally selected vendor fails to execute a contract with the County or defaults on their contract.

• All proposals shall be prepared in a comprehensive manner as to content, but we do not require specific types of binders or promotional material for submissions.

Promotional material will not be considered part of the proposal and will not affect the review of proposals.

• Chatham County reserves the right to negotiate with any, none, or all of the proposing vendors.

• All costs, including travel and expenses, incurred in the preparation of this proposal will be borne solely by the proposing company.

• The County will not return proposal materials to those submitting proposals.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

16 | P a g e

• No agreements with any selected vendor shall be binding until a contract is approved, signed, and executed by the authorized County Official and authorized representatives of the vendor.

Chatham County is an Equal Opportunity Employer and does not discriminate on the basis of sex, marital status, race, color, creed, national origin, sexual orientation, gender identity, age or disability.

Chatham County Justice Center and Historic Courthouse Security Camera and Network Cabling Modernization

17 | P a g e

Attachment A – Include with RFP submittal

0 0 0 0 0.010.010.010.010.010.010.010.020.020.020.020.020.020.030.03 mi Date: 7/8/2026 Time: 8:49 AM

Service Layer Credits:

World Hillshade: Sources:

Esri, Vantor, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, UV902

UV87

UV87 O

ld

G ra ha m

R d

Alston Chapel Rd

Moncure Pittsboro Rd

£¤15-501

£¤15-501 §̈¦64§̈¦64

Pittsboro

R o b eson

C reek

Ha ve n C re ek

H ill

C reek

Robeso nCreek

Hill C re ek

R ob e son

C re ek

R obeso n

Cree k

Turk ey Creek

Justice Center Basement

Printers & Copiers

Door Readers

Device Type

Door Reader Door Reader

Security Cameras

Camera Camera

Wireless Access Points

IT Closets

Fire Extinguishers

Details

Units

Office

Bathroom

Storage

Mechanical

Stairwell

Other

Work Area

Lobby

Information Technology

Other

Levels

Facilities

Existing Fiber Lines

Buried

World_Hillsha

Chatham County GIS shall not be held liable for any errors in these data. This includes errors of omission, commission, errors concerning the content of the data, and relative and positional accuracy of the data. These data cannot be construed to be a legal document. Primary sources from which these data were compiled must be consulted for verification of information contained in these data. Any resale of this data is strictly prohibited in accordance with North Carolina General Statute 132-10.

R

Attachment B mi Date: 7/8/2026 Time: 8:51 AM

Service Layer Credits:

World Hillshade: Sources:

Esri, Vantor, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, UV902

UV87

UV87 O

ld

G ra ha m

R d

Alston Chapel Rd

Moncure Pittsboro Rd

£¤15-501

£¤15-501 §̈¦64§̈¦64

Pittsboro

R o b eson

C reek

Ha ve n C re ek

H ill

C reek

Robeso nCreek

Hill C re ek

R ob e son

C re ek

R obeso n

Cree k

Turk ey Creek

Justice Center First Floor

Printers & Copiers

Door Readers

Device Type

Door Reader Door Reader

System Control Panel

System Control Panel

Security Cameras

Camera Camera

NVR NVR

Wireless Access Points

IT Closets

Automated External Defibrillator

Fire Extinguishers

Details

Reservations

Units

Office

Bathroom

Storage

Hallway

Mechanical

Stairwell

Conference

Chatham County GIS shall not be held liable for any errors in these data. This includes errors of omission, commission, errors concerning the content of the data, and relative and positional accuracy of the data. These data cannot be construed to be a legal document. Primary sources from which these data were compiled must be consulted for verification of information contained in these data. Any resale of this data is strictly prohibited in accordance with North Carolina General Statute 132-10.

mi Date: 7/8/2026 Time: 8:55 AM

Service Layer Credits:

World Hillshade: Sources:

Esri, Vantor, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, UV902

UV87

UV87 O

ld

G ra ha m

R d

Alston Chapel Rd

Moncure Pittsboro Rd

£¤15-501

£¤15-501 §̈¦64§̈¦64

Pittsboro

R o b eson

C reek

Ha ve n C re ek

H ill

C reek

Robeso nCreek

Hill C re ek

R ob e son

C re ek

R obeso n

Cree k

Turk ey Creek

Justice Center Second Floor

Door Readers

Device Type

Door Reader Door Reader

Security Cameras

Camera Camera

Wireless Access Points

IT Closets

Fire Extinguishers

Details

Units

Office

Bathroom

Storage

Mechanical

Stairwell

Conference Room

Other

Work Area

Lobby

Information Technology

Other

Levels

Facilities

Existing Fiber Lines

Buried

Chatham County GIS shall not be held liable for any errors in these data. This includes errors of omission, commission, errors concerning the content of the data, and relative and positional accuracy of the data. These data cannot be construed to be a legal document. Primary sources from which these data were compiled must be consulted for verification of information contained in these data. Any resale of this data is strictly prohibited in accordance with North Carolina General Statute 132-10.

mi Date: 7/8/2026 Time: 8:56 AM

Service Layer Credits:

World Hillshade: Sources:

Esri, Vantor, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, UV902

UV87

UV87 O

ld

G ra ha m

R d

Alston Chapel Rd

Moncure Pittsboro Rd

£¤15-501

£¤15-501 §̈¦64§̈¦64

Pittsboro

R o b eson

C reek

Ha ve n C re ek

H ill

C reek

Robeso nCreek

Hill C re ek

R ob e son

C re ek

R obeso n

Cree k

Turk ey Creek

Justice Center Third Floor

Door Readers

Device Type

Door Reader Door Reader

Security Cameras

Camera Camera

Wireless Access Points

IT Closets

Fire Extinguishers

Details

Units

Office

Bathroom

Storage

Mechanical

Stairwell

Conference Room

Other

Work Area

Lobby

Information Technology

Other

Levels

Facilities

Existing Fiber Lines

Buried

Chatham County GIS shall not be held liable for any errors in these data. This includes errors of omission, commission, errors concerning the content of the data, and relative and positional accuracy of the data. These data cannot be construed to be a legal document. Primary sources from which these data were compiled must be consulted for verification of information contained in these data. Any resale of this data is strictly prohibited in accordance with North Carolina General Statute 132-10.

Chatham County Justice Center and Historic Courthouse Security Camera RFP FINAL
JC Maps
JC_Basement
JC_FirstFloor
JC_SecondFloor
JC_ThirdFloor

File details come from the government source that posted it. Updated .