Chapel Sound System Upgrade PWS.pdf

PDF 57 KB Posted

Attached to
Luke AFB Chapel Sound System Upgrade Federal contract opportunity
Solicitation number
FA488725Q0032
Issued by
Department of the Air Force Air Education and Training Command

About this file

This Performance Work Statement (PWS) details an audio-visual system upgrade for the Luke Air Force Base Community Chapel located in Arizona. The project involves comprehensive replacement of the existing audio-visual infrastructure, specifically targeting outdated wiring and equipment. Key technical requirements include installing a new rack system in the backstage area, updating the wireless microphone system with 8 handheld units, 1 headset, and 1 lapel microphone, adding pulpit and overhead choir/band microphones, implementing Bluetooth capabilities, installing a digital processor, creating a touch panel for audio control, and integrating an HDMI de-embedder for audio extraction from video sources.

The contractor will be responsible for complete system installation, including mounting, programming, tuning, wiring, and personnel training. The project is intended to serve the 56th Fighter Wing Chaplain Corps and support military members (Active Duty, Guard, and Reserve) and their families during various chapel events such as worship services, memorials, weddings, and baptismal ceremonies. Additional contract requirements include coordinating installation to minimize service disruptions, obtaining written approval for any deviations from the work statement, and providing quarterly system monitoring for potential adjustments or resets. The installation is scheduled for 4 June 2025, with specific emphasis on minimizing operational interruptions for the chapel's activities.

View the file

Other files for this federal contract opportunity

Other files attached to Luke AFB Chapel Sound System Upgrade, newest first.
File Type Posted
799 FLR PLN - Sheet - A-103 - Rooms.pdf PDF
799 FLR PLN - Sheet - A-102 - Dimensions.pdf PDF
RFQ Chapel Sound System Upgrade- FA488725Q0032.pdf PDF
WD 2015-5469 Rev 27.pdf PDF
Anti-Terrorism Pamphlet.pdf PDF
Luke AFB Environmental Guide for Contractors October 2024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

CHAPEL AUDIO VISUAL SYSTEM

LUKE AFB, ARIZONA

4 JUNE 2025

INSTALLATION AND LOCATION

Luke Air Force Base (AFB), Arizona. Luke Community Chapel facility, building 799

USER

56th Fighter Wing Chaplain Corps. All military members (AD, Guard, Reserve) and their Families as needed for worship services, memorials, weddings, baptismal, etc.

SUMMARY OF SERVICES

Upgrade existing Audio Visual system to eliminate current issues due to old wiring and outdated equipment.

DESCRIPTION

Contractor shall provide all labor, equipment and materials to perform the following tasks to complete this performance work statement.

- Removal of equipment in front of house (FOH) rack and make video side better.

- Pull out wiring from FOH to stage and utilize cable path for new cables.

- Install Rack in backstage area.

- Rack will consist of amplifier(s), input panel for mic inputs, and ancillary components.

- Update wireless microphone system to today's standards. Requested 8 hand helds, 1 headset, and 1 lapel.

- Pulpit mic and 2 overhead choir/band mics.

- Bluetooth at FOH.

- Digital processor and input/output devices to handle all sources mentioned above.

- Touch panel at FOH to control audio levels and mutes of sources that will be simple for anyone to utilize the audio system.

- Add HDMI de-embedder for audio from video.

- Speaker system that can handle the space for spoken word with choir and band.

- Installation, mounting, programming, tuning, wiring, and training of system once complete.

- Quarterly monitoring of system for any adjustment or resets needed.

SCHEDULE

Installation should be properly coordinated through the Chaplain Corps Leadership to minimize worship service disruptions.

DEVIATION FROM SERVICES

The contractor shall not depart from nor perform work outside of this Performance Work

Statement and criteria on which it is based without written direction of the Contracting Officer.

If the contractor performs such work without written approval, it does so at its own risk.

Any changes to this Performance Work Statement will be coordinated with Luke AFB Chaplain Corps leadership.

OTHER REQUIREMENTS

SUBCONTRACTORS: The contractor shall not enter any subcontracts that are not identified in its original proposal without prior written approval of the CO.

RELEASE OF DATA: All data, reports, and materials relative to this Performance Work

Statement are the property of the Government and will not be released by the Contractor without written approval of the CO.

RESPONSIBILITY FOR FIELD WORK: The Contractor shall be responsible for all damages to persons and property that occur as a result of the Contractor’s fault or negligence in connection with field work, and shall save and hold the Government free from all claims and suits arising from such damage.

File details come from the government source that posted it. Updated .