Changes to Buck Post Office SOW as of the contractor walkthrough on 9.docx

DOCX document 22 KB Posted

Attached to
Grand Gorge Post Office and Apartments
Solicitation number
2140761
Issued by
Dutchess County, New York

About this file

This document is a statement of work (SOW) addendum for the Buck Post Office renovation project, detailing modifications to the original scope of work based on a contractor walkthrough. The changes encompass six primary work items: (1) installation of a new boiler elevated a minimum of six inches from the floor with plumbing modifications and replacement of two of nine existing circulators as identified by the owner; (2) demolition of an existing back second-floor porch door with installation of a new Therma Tru prehung unit, reuse of the existing door knob, and finishing of exposed wood surfaces; (3) expansion of two door openings to 36 inches wide with installation of prehung fiberglass units and construction of a pressure-treated stoop at the side entrance; (4) arrangement of existing attic boards as walkways with installation of R30 fiberglass insulation layer over existing insulation; (5) installation of returns on new handrails in the interior hallway; and (6) wall mounting of the split air system condensing unit rather than concrete mounting.

No pricing information, payment terms, set-asides, incumbent contractor details, or funding sources are identified in this SOW addendum. The document serves as a clarification and modification tool to address issues identified during the contractor walkthrough, ensuring the scope of work aligns with actual site conditions and owner requirements.

View the file

Other files

File Type Posted
Grand Gorge Post Office - SOW (2) (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Changes to Buck Post Office SOW:

1. Work Item: Boiler. When installing the new boiler, raise it off the floor a minimum of six inches. Modify the plumbing as necessary to accommodate the new location. Replace two of the existing nine circulators, the owner will identify which two need replacement.

2. Work Item: Second floor porch on back of building. Demo the existing door, install a new Therma Tru prehung in kind unit, re use the door knob. Trim both sides, prime and paint. Scrape, prime and paint any wood on this porch that does not get covered with the new siding.

3. Work Item: Doors and side entrance hall floor. Expand both of the door openings referenced in this work item to 36” wide doors. Install prehung fiberglass units, prime and paint, re use the door knobs. Build a PT stoop for the side door.

4. Work Item: Attic insulation. Arrange the random boards in the attic to use as walkways instead of removing and discarding them. Roll out on top of the existing insulation a new layer of R30 fiberglass.

5. Work Item: Interior hallway. Install returns on the new handrails.

6. Work Item: Split Air System. The condensing unit will be wall mounted, not concrete mounted.