Change Order Notice V.25.1 8.28.24~3.pdf
PDF 1 MB Posted
- Attached to
- Change Order - NCS Person (Science)
- Solicitation number
- 25-586SBE-CHFED-B-48367
- Issued by
- Illinois
About this file
Based on the provided document, this appears to be a placeholder PDF displaying a technical error message about Adobe Reader. The document does not contain any substantive information about a state or local contract opportunity. The page shows instructions for troubleshooting PDF viewing issues, including links to download Adobe Reader and trademark information for Windows, Mac, and Linux. Without additional context or pages, no meaningful summary of a contract opportunity can be generated.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: SBE - State Board of Education |
| ProcurementTitle: SBE: Illinois Science Assessment |
| BBREFNO.: 25-586SBE-CHFED-B-48367 |
| thedetails: The Illinois State Board of Education seeks a change order to remove Mini Matters as a subcontractor from our contract with NCS Pearson. Mini Matters provides American Sign Language (ASL) Video Production, ASL Interpreting, Third-Party ASL Review Mini Matters will be replaced with Blue20. Blue20 will provide American Sign Language (ASL) video production services, interpreting services, and third party ASL review for the contract. |
Additionally we will be adding ACS Ventures, LLC as a subcontractor. ACS Ventures will be providing peer review support-facilitation of standard meetings.
This change order will also update the pricing structure of the contract with NCS Pearson. The original pricing structure did not contemplate a change in the student grades tested. Due to the procurement of a high school assessment that currently contains a science component that is required to provide a college-reportable score, which is a statutory requirement of our high school assessment, we do not anticipate a high volume of testing to occur at grade 11 during FY25. Nevertheless, we are making the test available for any school that wishes to administer it, and we are preserving all current development the grade 11 assessment development, which is wholly owned by Illinois, in order to protect our past investments and to provide future flexibility if we need to provide a grade 11 science assessment outside of the science component that is contained in our current high school assessment. The current pricing structure does not account for those portions of the assessment costs that are incurred regardless of student volume thereby leaving no means by which we can continue to compensate the vendor for any work related to the grade 11 assessment. A revised pricing structure to include a set proportion of the contract value as fixed cost, and a proportion of the contract value as reconciled costs with a reduced per unit cost would allow the flexibility to account for all of the fixed costs associated with all grades of the assessment while continuing to reconcile against only those tests that are taken and scored. This pricing structure would allow us to preserve the necessary fixed costs while allowing us to continue testing any volume of our grade 11 students in any given year at a reduced per unit cost. The not to exceed amount of the contract will remain the same.
| CheckBox1: 1 |
| CheckBox2: 1 |
File details come from the government source that posted it. Updated .