Change Order Notice V.25.1 8.28.24~23.pdf

PDF 1 MB Posted

Attached to
AML Change Order Notice No 1 Hanson Professional Services
Solicitation number
26-422DNR-MINES-B-49860
Issued by
Peoria County, Peoria City, Illinois

About this file

The provided document appears to be a placeholder PDF with a standard Adobe Reader loading or error message. The file contains generic text about potential PDF viewing issues and instructions for downloading Adobe Reader for Windows, Mac, or Linux platforms. There are no specific contract, bid, or project details present in this document. The text includes standard trademark disclaimers for Microsoft, Apple, and Linux operating systems.

No substantive contract, procurement, or project information can be extracted from this file. The document seems to be a technical loading screen or error message typically seen when a PDF fails to render correctly or is not fully uploaded.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: DNR - Natural Resources
ProcurementTitle: AML Change Order Notice No 1 Hanson Professional Services
BBREFNO.: 26-422DNR-MINES-B-49860
thedetails: This change order will add $45,395.74 to the current contract of $697,388.59 for a new total of $742,784.33 on P-71934. Procure the engineering design services to complete the Abandoned Mine Reclamation at the Peoria City/Peoria County Landfill. The site, abandoned by Midland Coal Company - Edwards, contains a roadway and lake. The roadway is the dam for the lake. The dam is experiencing active sloughing and settlement on the downstream side of the dam. The dam is classified as Class 2, Intermediate size. IDNR needs to procure Hanson Professional Services to complete the construction plans and specifications for the dam modification project.