Change Order Notice V.25.1 8.28.24~19.pdf
PDF 1 MB Posted
- Solicitation number
- 26-422DNR-WTRRE-B-48244
- Issued by
- Illinois
About this file
The document appears to be a loading or error page for a PDF file, displaying a standard Adobe Reader message indicating that the document may not be displaying correctly. The page provides instructions for upgrading Adobe Reader and lists trademark information for Windows, Mac, and Linux operating systems. No substantive contract or government opportunity information is present in this image.
Without additional context or a properly loaded document, I cannot provide a detailed summary of a state and local contract opportunity. The file seems to be a technical placeholder or loading screen rather than an actual contract document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: DNR - Natural Resources |
| ProcurementTitle: CO #9- OWR 45A |
| BBREFNO.: 26-422DNR-WTRRE-B-48244 |
| thedetails: CO #9 will increase the contract amount by $75,901.00. The Edgar Lakes levee in Roots, Illinois was decertified by FEMA raising the Base Flood Elevation, BFE, 12.2 feet from Elevation 380.0 to Elevation 392.2. Change Order 9 provides the engineering design services for the preparation of plans, specifications and probable estimate of construction cost for raising the electrical and mechanical components above the BFE plus one foot of freeboard. |
| CheckBox1: 1 |
| CheckBox2: 1 |