Change Order Notice V.25.1 10.11.2024~1.pdf

PDF 1 MB Posted

Attached to
Change Order Notice RR-18-9015 Document and Process Control Management Services.
Solicitation number
25-557THA-ENGCO-B-45097
Issued by
Illinois

About this file

This appears to be a PDF placeholder or loading screen, not an actual contract document. The image shows a standard Adobe Reader message indicating that the PDF document cannot be displayed properly and suggesting the user upgrade their PDF viewer software. It includes links to download Adobe Reader for Windows, Mac, or Linux operating systems and provides a support link. The bottom contains trademark notices for Windows, Mac, and Linux.

No actual contract details, specifications, or bid information can be analyzed as this is just a technical placeholder message rather than the intended document contents.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: THA - Toll Highway Authority
ProcurementTitle: RR-18-9015 Document and Process Control Management Services.
BBREFNO.: 25-557THA-ENGCO-B-45097
thedetails: The Illinois State Toll Highway Authority is giving notice to supplement contract RR-18-9015 with Bush Infotech Group, Inc. DBA Kristine Fallon Associates, Inc. RR-18-9015 with Bush Infotech Group, Inc. DBA Kristine Fallon Associates, Inc. in the amount of $1,376,984.94 with no additional procurement expenditures needed. Additional work is needed that was not anticipated in the current contract. The additional work is germane to the original project and within the project scope. This contract provides engineering consultant services required for document and process control management services for the Tollway, specifically with respect to the management and administration of the Tollway's Web-Based Project Management Information System (currently, Trimble Unity Connect). Management of the flow of information (electronic & hard copies) into and out of the Engineering Department is critical to Tollway operations as well as completion and delivery of the Move Illinois program.

The existing contract is being amended and extended to provide continuity and continuation of services. A different method for procurement is not recommended because the current consultant team is providing ongoing Engineering consulting and support services for the administration and management of a Web Based Program Management Information System (WBPMIS) used for managing the Move Illinois program. An RFP has been published to competitively solicit these services and this supplement is critical in ensuring their services are still available, without interruption, while the RFP is being executed and a selection is made for a possible replacement consulting team. The supplement includes 5,058 hours at an average rate of $47.97 and extends the contract for a period of six (6) months to continue to provide services while the RFP for replacement services is completed and executed.

CheckBox1: 1
CheckBox2: 1

File details come from the government source that posted it. Updated .