Change Order Notice P-89808~1.pdf
PDF 1 MB Posted
- Solicitation number
- 27-448DOIT-TELEC-B-53320
- Issued by
- Dekalb County, Illinois
About this file
This is a Change Order Notice for the Illinois Department of Innovation and Technology (DoIT) related to an amendment to the Metro Ethernet Contract (P-89808) with Comcast. The change order removes site DOT-R502 Clinton, located at 6121 State Highway 54 in Clinton, Illinois from the existing contract. The modification is necessary because Comcast cannot fulfill service delivery to this location without incurring build-out costs that were not included in the original contract quote and therefore were not part of the executed agreement.
The removal of this site represents a material change to the original contract scope, as the service provider determined that the infrastructure requirements for this particular location exceed what was originally anticipated. By removing DOT-R502 Clinton from the contract, DoIT and Comcast have resolved the discrepancy between the quoted pricing and the actual costs required to provide Metro Ethernet service to that location.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: DoIT - Innovation and Tech |
| ProcurementTitle: Metro Ethernet Service - Comcast |
| BBREFNO.: P-89808 |
| thedetails: Removing site DOT-R502 Clinton, Comcast is unable to provide service to the site located at 6121 State Hwy 54, Clinton, IL 61727 without a build out cost that was not originally quoted, thus not part of the executed contract. |
| CheckBox1: 1 |
| CheckBox2: 1 |