Change Order Notice Logicoy Data Collections.pdf
PDF 1 MB Posted
- Solicitation number
- 27-444DHS-444OC-B-54837
- Issued by
- Illinois
About this file
This is a Change Order Notice issued by the Chief Procurement Office for General Services regarding modifications to a data collection contract with the Department of Human Services (DHS). The original solicitation (BBREFNO: 27-444DHS-444OC-B-54837) was for data collection services, maintenance, and availability services related to the Illinois Prescription Monitoring Program (ILPMP). The change order was necessitated by Illinois Public Act 104-0535 (House Bill 4834), which amended the Illinois Controlled Substances Act and requires the Prescription Information Library (PIL) to delete all Testosterone records from the database and implement collection policies to prevent future storage, viewing, or display of such records through the ILPMP. The modification is considered germane to the original contract as it fundamentally alters the data collection requirements and storage protocols, with the legislative change deemed unforeseeable at the time of contract procurement.
The change order increases the contract cost by more than $25,000, triggering the posting requirement on the Bulletin/BidBuy for 14 days as mandated by procurement regulations. The additional cost is required to revise collection requirements and protect previously collected data in compliance with the new statutory obligations. The change order satisfies the criteria under Section 33E-9 of the Criminal Code, as the circumstances necessitating the modification were not reasonably foreseeable at contract execution, and the modifications are directly related to the original contract scope.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: DHS - Human Services |
| ProcurementTitle: Sheltered Mrkt PMP Data Collection IFB |
| BBREFNO.: 27-444DHS-444OC-B-54837 |
| thedetails: The original solicitation was for data collection services, maintenance and availability services as it relates to the Illinois Prescription Monitoring Program. Illinois Public Act 104-0535 (enacted via House Bill 4834), which amended the Illinois Controlled Substances Act (specifically adding/amending sections such as 720 ILCS 570/316 and 720 ILCS 570/316.2). The new statute has been enacted recently which states the Prescription Information Library (PIL) must delete all Testosterone records from our database as well as maintain collection policies to ensure future records are not stored, viewed, or displayed through the ILPMP. The additional cost is necessary to revise the collection requirements and protect perviously collected data. The additional work is germane to the original contract as the whole of it is a modification of the data collected and how it is stored; and the legislative change was unforeseeable at the time the contract was procured. |