Change Order Notice Elixir Opus 7.1 60 Day Extension~1.pdf
PDF 1 MB Posted
- Solicitation number
- 26-448DOIT-APP44-B-48265
- Issued by
- Illinois
About this file
The provided PDF appears to be a placeholder or error document displaying a standard Adobe Reader loading message, which prevents extracting any meaningful contract or opportunity details. The file contains technical instructions about PDF viewing and Adobe Reader software, along with trademark disclaimers, but no substantive contract information. Without additional pages or content, a comprehensive summary cannot be generated.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: DoIT - Innovation and Tech |
| ProcurementTitle: SS CO Elixir Opus 7.1 License 60 Day Extension - No Cost |
| BBREFNO.: <TBD> |
| thedetails: Elixir Technologies Corporation (Elixir) is in process of sunsetting Opus 7.1 which is a set of licenses the Agency has incorporated within their infrastructure since 2012. Due to the Agency having to request special permission from Elixir Executive Leadership, the Agency has experienced delays in moving procurement forward for continued services. Due to Elixir delays in providing Opus 7.1 quote, Elixir is providing a (60) day extension (July 1, 2025, through August 31, 2025) of current licenses at No Cost to the State. The value to the State is estimated at $64,500. |
The Agency currently has a Sole Source Contract with Elixir under 24-448DOIT-INFOT-P-68127 with a term of June 25, 2024, through June 30, 2025, at price of $378,000.61.
Elixir is the sole source distributor, manufacturer, seller and provider of services including training, support and maintenance of Elixir's products. This is a proprietary product that is integrated through out IDES and DHS templates on State portals used by over 3 million citizens in the State of Illinois.
If the IES system and related components are not maintained, SNAP, TANF and Medicaid would be cut off to Illinois residents in need of these services. These main services are seen below and the function they serve.
The Supplemental Nutrition Assistance Program (SNAP) (formerly Food Stamps) helps low-income people and families buy the food they need for good health.
The Temporary Assistance for Needy Families (TANF) program provides temporary financial assistance for pregnant women and families with one or more dependent children. TANF provides financial assistance to help pay for food, shelter, utilities, and expenses other than medical.
Medicaid helps with medical costs for some people with limited income and resources.
Illinois residents obtain these benefits through the IES Workers Portal or Manage My Case Illinois portal.
Elixir handles all the correspondence for the Statewide Integrated Eligibility Systems. All eligibility approvals and denial dispositions for Medical, SNAP and Cash Programs would be stopped. These State records inform the clients of the results of their applications and redetermination. Without these documents our clients do not have any indication as to what kind or what amount of benefits they are to receive. In addition, benefits will be canceled when redetermination documents are not produced. Our Clients would overtax our Family and Community Resource Centers and All Kids offices with questions and concerns about their eligibility if these forms were not produced. Overburdening our local offices could result in the client's potential loss of benefits. All of these programs are supported by Federal funds and our correspondence is monitored by our Federal partners. The State could face monetary penalties if these forms are not produced in a timely manner.
Without this product, many of the States citizens that rely on these programs will be left out. We could lose federal funding, and an undue burden would be put on other State agencies.
| CheckBox1: 1 |
| CheckBox2: 1 |
File details come from the government source that posted it. Updated .