Change Order Notice B-48741 Stateville NRC Cable.pdf

PDF 1 MB Posted

Attached to
CHANGE ORDER NOTICE - Cable/Satellite TV Services Amendment- IBF Stateville
Solicitation number
26-426DOC-STATE-B-48741
Issued by
Illinois

About this file

The provided PDF appears to be a default Adobe Reader page displaying a loading message, indicating that the actual document content has not loaded correctly. Without the substantive document content, I cannot provide a meaningful summary of a state and local contract opportunity. To proceed, a properly loaded PDF with the actual contract or change order details would be needed.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: DOC - Corrections
ProcurementTitle: CHANGE ORDER NOTICE - Cable/Satellite TV Services Amendment- IBF Stateville
BBREFNO.: 26-426DOC-STATE-B-48741
thedetails: Stateville Correctional Center will amend its Cable/Satellite TV Service contract to reduce drops down to 0 for Stateville proper and increase drops from 8 to 192 for Northern Reception Center (NRC) Minimum Security Unit for years 3-5. NRC increase in drop cost will not apply until drops are installed and programmed. The overall contract value will decrease.
CheckBox1: 0
CheckBox2: 1