Change Order Notice B-43612~2.pdf

PDF 2 MB Posted

Attached to
CHANGE ORDER NOTICE - Pearson contract change order
Solicitation number
24-691ISAC-COLAC-B-43612
Issued by
Illinois

About this file

This document is a Change Order Notice from the Chief Procurement Office for General Services regarding a change order to extend ISAC's (Illinois Student Assistance Commission) contract with Pearson for teacher test prep services. The current contract was originally procured as a sole source with a term of January 9, 2024 through June 30, 2024, aligning with the expiration of the Illinois State Board of Education's contract with Pearson for the Illinois Licensure Testing System. This change order will extend the Pearson contract with ISAC by 9 months, from June 30, 2024 to March 30, 2025, to allow ISAC to complete a new procurement for a multi-year contract for the teacher test prep services to match ISBE's current contract through FY2034. If a new contract is entered into as a result of an RFP, this change order would be cancelled. Failure to extend this contract would result in ISAC being unable to meet the requirements of a legislatively mandated program, the Illinois Prepare for Future Program, by not providing the required test preparation services.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Change Order Notice Chief Procurement Office for General Services Change Order Notice V.23.2 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.

This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.

Detailed explanation for this change order:

11.0.0.20130303.1.892433.887364

CurrentPage:
PageCount:
DropDownList1: ISC - IL Student Assistance Commission
ProcurementTitle: CHANGE ORDER NOTICE - Pearson contract change order
BBREFNO.: 24-691ISAC-COLAC-B-43612
thedetails: This is a change order to extend ISAC's contract for teacher test prep services with Pearson; Bidbuy ref # 24-691ISAC-COLAC-P-61068. The time extension needed is 9 months. The current contract expiration date is 6/30/2024 and the extension will make the new expiration date 3/30/2025.

When ISAC's original contract with Pearson was procured as a Sole Source, it was executed for a term of 1/9/2024 through 6/30/2024 (term being less than 6 months). The reasoning for the short initial term was because at the time, Illinois State Board of Education's (ISBE) contract with Pearson for the Illinois Licensure Testing System (ILTS) tests, which are administered exclusively on behalf of ISBE by Pearson, was set to expire on 6/30/2024. Therefore, ISAC set the Pearson contract to align with the expiration date as it was unknown whether there would be a vendor change upon expiration of ISBE's contract.

The change in time of 9 months will allow ISAC to complete a procurement for a multi-year contract for the teacher test prep services to match ISBE's current contract through FY2034. If a new contract is entered into as a result of an RFP conducted during the 9 month timespan, this CO/extension would be canceled.

If this contract is not extended, ISAC would fail to meet the requirements of a legislatively mandated program, Illinois Prepare for Future Program, by not providing the test preparation services.