Change Order McKesson Amendment~1.pdf
PDF 1 MB Posted
- Attached to
- CHANGE ORDER NOTICE McKesson
- Solicitation number
- 25-482DPH-OFCDI-B-48123
- Issued by
- Illinois
About this file
The document appears to be a system-generated placeholder page indicating an issue with PDF rendering, displaying a standard Adobe Reader troubleshooting message. The page provides instructions for upgrading Adobe Reader and lists trademark information for Windows, Mac, and Linux. No substantive contract, procurement, or government file details are visible in this image.
Since no actual contract or opportunity details are present, I cannot provide a meaningful summary of state and local contract opportunity specifics. The file seems to be a technical error page rather than a functional document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Change Order Notice Chief Procurement Office for General Services Change Order Notice V.25.1 Page of Notice of renegotiated contracts and change orders that increase the cost of a contract by more than $25,000 or the time of completion by a total of 180 days or more shall be posted on the Bulletin/BidBuy for 14 days.
This Change Order Notice provides detail as to why the change order is needed and, pursuant to Section 33E-9 of the Criminal Code, that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed or the change is germane to the original contract as signed. Change orders are defined by Section 1-15.12 of the Procurement Code and Section 1.2067 of the CPO-GS' Administrative Rules.
Detailed explanation for this change order:
11.0.0.20130303.1.892433.887364
| CurrentPage: |
| PageCount: |
| DropDownList1: DPH - Public Health |
| ProcurementTitle: McKesson Medical-Surgical Government Solutions LLC, HIV & WH Condom and Lube IFB |
| BBREFNO.: 25-482DPH-OFCDI-B-48123 |
| thedetails: The Illinois Department of Public Health (IDPH) currently has a contract with McKesson Medical-Surgical Government Solutions LLC for the provision of condoms and lubricant. The 10ml lubricant originally supplied by McKesson is no longer manufactured. To address this, IDPH is requesting to replace the 10ml lubricant with the same lubricant in 8ml from the same vendor, with a decrease in cost. |
This procurement is essential for IDPH's federal HIV Prevention Grant, which mandates the distribution of risk reduction materials. Specifically, this change order for lubricant aligns with Centers for Disease Control (CDC) prevention guidelines and is crucial for meeting the grant's requirements and approved scope. Failure to approve this change could result in non-compliance with the grant, potentially leading to a loss of federal funds and a significant increase in the risk of HIV and STD infection among HIV Prevention service clients due to the lack of sexual risk reduction tools.
Number of units of 10ml lubricant 702,000 Original Cost per unit of 10ml lubricant $.017 Original cost of 10ml lubricant $119,340.00 Original Contract Cost $236,970.00
Number of units of 8ml lubricant 702,000 Updated Cost per case of 8ml lubricant $0.016753 Updated Cost of 8ml of lubricant $117,606.06 Updated Contract Pricing $235,236.06
Net Savings $1,733.94
| CheckBox1: 1 |
| CheckBox2: 1 |
File details come from the government source that posted it. Updated .