CH-53K_CNI PERFORMANCE SPECIFICATION_DRAFT_11-25-24.docx

DOCX document 745 KB Posted

Attached to
CH-53K Communication, Navigation, and Instrumentation Part Task Trainer (CNI PTT) Sources Sought Notice
Solicitation number
N6134025R0022
Issued by

About this file

This is a Performance Specification document for a CH-53K Communication, Navigation and Instrumentation (CNI) maintenance trainer (Device 11B112) for the United States Marine Corps, to be located at the Center for Naval Aviation Technical Training Marine Unit facilities at MCAS New River, Jacksonville, North Carolina.

The specification defines requirements for a full-size maintenance task trainer that replicates the CH-53K nose, cockpit, and forward cabin section to Station 282, including instrument panels, consoles, avionics bays, flight controls, displays and other systems. The trainer must support maintenance training tasks including system functional testing, fault isolation, troubleshooting, and component replacement across 49 different aircraft systems ranging from flight controls to communications equipment. Key requirements include an instructor operator station for fault insertion/control, high-fidelity physical components matching the actual aircraft, replicated wiring and interfaces, and the ability to simulate normal operations and fault conditions according to aircraft technical manuals. The trainer must operate in an unclassified mode and meet various environmental, safety, cybersecurity and maintainability requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUIPRF 230007B
22 Nov 2024

PRF 230007B

22 November 2024

SUPERSEDING

PRF 230007A
CAGE 89297
14 March 2024

PERFORMANCE SPECIFICATION

FOR

UNITED STATES MARINE CORPS

CH-53K Communication, Navigation and Instrumentation (CNI) Maintenance Trainer

NAVAL AIR WARFARE CENTER

TRAINING SYSTEMS DIVISION

12211 SCIENCE DRIVE

ORLANDO, FL 32826

APPROVED BY: _________________________________ DATE:

Jenny Barriger (PMA-205, Level II IPTL) H-53 Training Systems of designee

APPROVED BY: _________________________________ DATE:

Lynn Rau (APME designee) APEO (E) or designee

APPROVED BY: _________________________________ DATE:

Chad Guillet (PSM designee) APEO (L) or designee

APPROVED BY: _________________________________ DATE:

Ryan Schmidt (APMT&E designee)

Distribution Statement D: Distribution authorized to Department of Defense and U.S. DoD contractors only; Controlled Technical Information (CTI); 8 November 2019. Other requests for this document must be referred to Program Executive Officer Air (PEO(A)), PMA-261, 47123 Buse Rd., Building 2272 RM 155, Patuxent River, MD 20670.

Controlled by: Department of Navy Controlled by: NAWCTSD CUI Category: CTI Distribution/Dissemination Control: FEDCON

CUI

POC: Cattien.T.Nguyen.civ@us.navy.mil

CUI

REVISIONS

Revision
Affected Paragraph(s)
Changes
Initial Release
All
PRF 230007 baseline for CNI Device 11B112

A

2.2.1
Removed MIL-DTD-461G and MIL-STD-464D
2.2.2
Removed 47 CFR 15 and 47 CFR 15.109
2.3
Removed BS EN 55035:2017+A11:2020, IEC 61000-4-2:2008, and UNE EN 55032:2016/A1:2021
3.1.1.a, b
Changed station 242 to station 282.
3.3.1.a
Changed "provide for operational modes ranging from Unclassified up to and including SECRET NOFORN classification", to "provide for unclassified operational modes",
3.4.1.1
Deleted electromagnetic compatibility requirements
3.4.1.1.1
Deleted intra system EMC requirements
3.4.1.2
Deleted electromagnetic interference requirements
3.4.1.3
Changed electrostatic discharge requirements to “The trainer shall assure that all electrical and electronic system devices are not damaged by EST during handling, testing, maintenance, and operation.
3.4.2
Changed from “…requirements for both direct and indirect effects of lightning as defined in IAW MIL-STD-464D” to “…requirements for indirect effects of lightning”
3.4.3
Removed MIL-STD-464D reference; added minimum bonding resistance requirement; added bonding of trainer removable panels requirement.
3.4.3.1.a
Changed from “…from the facility earth ground to the first equipment closure, from the first equipment enclosure to subsequent equipment enclosure(s) and equipment enclosure to system structure…effect of all faying…” to “…from the equipment enclosure to system structure…effect of the faying…”
3.4.3.1.c
Changed from “…or less across…the equipment and equipment enclosure(s), such…” to “…or less resistance across…the equipment, such…”
3.8.1
Fixed the numbering to start with a. Previously started with f
3.8.2.c
Deleted MIL-STD-461G
3.8.2.d
Deleted MIL-STD-464D
4.3.4.1.1
Deleted EMC verification
4.3.4.1.1.1
Deleted intra-system EMC verification requirements
4.3.4.1.2
Deleted EMI verification requirements.
4.3.4.1.3.a
Deleted “as defined inANSI/ESDA/JEDEC JS-001-207 (Human Body Model (HBM) EST)”
4.3.4.1.3.b
Deleted “by applying MIL-STD-461G: CS118, Personnel Borne Electrostatic Discharge procedure:
4.3.4.2
Updated lightning verification language
4.3.4.3
Updated bonding verification language

Revision A Changes Accepted

Michael Miller USMC APMSE

B
2.2.2
Deleted reference to DFARS 252.227-7014.
3.b
Removed “…available 30 days prior to CDR…”.
3.c
Replaced “…available 30 days prior to Critical Design Review (CDR)” with “…with IETM lockdown to occur NLT 30 days prior to PDR and provided to seller”.
3.1.1.e
Changed from “…available 30 days prior to CDR…” to “…available 30 days prior to PDR…”.
3.1.1.h then throughout the document
Changed from “…A1-CH53K-IETM-MMO-000 available 30 days prior to CDR…” to “…A1-CH53K-IETM-MMO-000 available 30 days prior to PDR…”
3.1.3.36.c
Deleted from statement “contain the components, subcomponents and hardware to”
3.1.3.42.e
Deleted “TGB/IGB Chip Detector System. Added “Tail Pylon Fold System”.
3.1.4
Modified section language to clarify the number Operational Hours (standard workday) and the number of Continuous Powered Hours (continuous operability) that will satisfy the Operational Availability and Reliability requirement for the trainer.
3.3.1
Removed “b. include device architecture designed for quick and easy transition between classified and unclassified operational modes, and”
3.3.2
Removed “with a Classified overlay”.
3.5.5.3.c
Added language “software interface” to the sentence.
3.6.3
Language clarification to include harness and cable containment means that will not cause cable insulation damage.
3.7.3.3.5
Accessibility language was modified to clarify means to access internal components and parts, complete required testing and perform routine servicing and maintenance.
3.7.6.g
Reworded statement to clarify requirement to relocate the training device without the need of special support equipment.
3.7.6.h
Deleted reference to back-up generator.
3.8.2.b
Language change MIL-HDBK-454C can be used as guidance.
3.8.2.e
Deleted reference manual.
3.8.8.1.a
Clarification added to the required warning label on electrical & electronic units enclosure that contain more than one source of electrical power.
4.2.c
Incremental Configuration Audit – Deleted!
4.2.d
Change from Final Physical Configuration Audit to Drawing Configuration Audit.
CUIPRF 230007B
22 Nov 2024

iii

CUI

Table of Contents

SectionTitlePage
1.SCOPE1
1.1System Identification1
1.2System Overview1
1.3Document Overview1
2.APPLICABLE DOCUMENTS1
2.1General1
2.2Government Documents1
2.2.1Specifications, Standards, and Handbooks1
2.2.2Other Government Documents, Drawings, and Publications2
2.3Non-Government Publications3
2.4Order of Precedence4
3.REQUIREMENTS4
3.1Subsystem Functional Requirements4
3.1.1Training Tasks and Objectives4
3.1.1.1Trainer Tasks and Objectives Precedence5
3.1.3Training System or Subsystem Functional Requirements5
3.1.3.1Integrated Vehicle Health Management System (IVHMS) Integrated Built-In-Test (IBIT)6
3.1.3.2Environmental Control System (ECS) IBIT7
3.1.3.3Flight Control System (FCS) IBIT8
3.1.3.4Communication (Comm) 1 AN/ARC-210(V) System IBIT8
3.1.3.5Comm 2 AN/ARC-210(V) System IBIT9
3.1.3.6Multifunctional Information Distribution System (MIDS) IBIT10
3.1.3.7Satellite Communications (SATCOM) System IBIT11
3.1.3.8Inter-Communication System (ICS) IBIT11
3.1.3.9Alternating Current (AC) Power System IBIT12
3.1.3.10Direct Current (DC) Power System IBIT13
3.1.3.11Fire Detection System IBIT14
3.1.3.12Fire Extinguishing System IBIT14
3.1.3.13Pressure Refueling and Defueling System IBIT15
3.1.3.14Fuel Dump System IBIT16
3.1.3.15Fuel Quantity Gauging System IBIT16
3.1.3.16First Stage Hydraulic System IBIT17
3.1.3.17Standby Instrument System (SIS) IBIT18
3.1.3.18Avionics Management System (AMS) IBIT18
3.1.3.19Master Warning System IBIT19
3.1.3.20Landing Gear Control System IBIT20
3.1.3.21Instrument Panel Lighting System IBIT21
3.1.3.22Controllable Searchlight System IBIT22
3.1.3.23Emergency Egress Lighting System (EELS) IBIT22
3.1.3.24No. 1 Air Data System (ADS) IBIT23
3.1.3.25No. 2 ADS IBIT24
3.1.3.26No. 3 ADS IBIT25
3.1.3.27No. 1 Radar Altimeter System IBIT25
3.1.3.28No. 2 Radar Altimeter System IBIT26
3.1.3.29Very High Frequency (VHF) Omnidirectional, Instrument Landing System (ILS) and Marker Beacon System IBIT27
3.1.3.30No. 1 Embedded Global Positioning and Inertial Navigation System IBIT28
3.1.3.31No. 2 Embedded Global Positioning and Inertial Navigation System IBIT29
3.1.3.32Interface Blanker Unit (IBU) System IBIT29
3.1.3.33No. 1 Utility Management System (UMS) IBIT30
3.1.3.34No. 2 UMS IBIT31
3.1.3.35Auxiliary Power Unit (APU) System IBIT31
3.1.3.36Overhead Door and Cargo Ramp System IBIT32
3.1.3.37Main Rotor Blade (MRB) Fold System IBIT33
3.1.3.38Rotor Brake System (RBS) IBIT34
3.1.3.39Main Gearbox (MGB) Chip Detector System IBIT35
3.1.3.40Nose Gearbox (NGB) Chip Detector System IBIT35
3.1.3.41Tail Gearbox (TGB) and Intermediate Gearbox (IGB) Chip Detector System IBIT36
3.1.3.42Tail Pylon Fold System IBIT37
3.1.3.43Engine System IBIT38
3.1.3.44Forward Looking Infrared (FLIR) System IBIT38
3.1.3.45Identification Friend or Foe (IFF) System IBIT39
3.1.3.46Countermeasures Dispenser System IBIT40
3.1.3.47Radar Signal Detecting Set AN/APR-39C(V)2 System IBIT40
3.1.3.48Directional Infrared Countermeasures (DIRCM) AN/AAQ-24(V) System IBIT41
3.1.3.49Laser Detecting Set AN/AVR-2B(V) System IBIT42
3.1.4Testing Operational Availability and Reliability43
3.2Environmental, Safety, and Operational Health (ESOH) Requirements43
3.2.1Structural Safety43
3.2.2Emergency Equipment Power Disconnect43
3.2.3Temperature Sensing Alarms43
3.3Security and Privacy Requirements43
3.3.1Classification43
3.3.2Cybersecurity44
3.3.2.1Processing of National Security Information44
3.3.2.2Cybersecurity Requirements for Operating Systems (OSs) and Software44
3.3.2.3Cybersecurity Configuration Criteria44
3.3.2.4Hardware and Account Management45
3.3.2.5Cybersecurity and Software Management System45
3.3.2.6Virus Protection45
3.3.2.7Boundary Defense Mechanisms and Network Devices46
3.3.2.8Audit Logging46
3.3.2.9Image Management System47
3.3.2.10Encryption47
3.4System Environment Requirements47
3.4.1Electromagnetic Environmental Effects (E3)47
3.4.1.1DELETED47
3.4.1.1.1DELETED47
3.4.1.2DELETED47
3.4.1.3Electrostatic Discharge (ESD)47
3.4.2Lightning47
3.4.3Bonding47
3.4.3.1DC Bonding Levels48
3.5Computer Resource Requirements48
3.5.1Computational Systems48
3.5.1.1Scalable Architecture48
3.5.1.1.1Standard Hardware Interfaces48
3.5.1.1.2Open Hardware Architecture48
3.5.2Computational Hardware Components and Peripherals48
3.5.2.1Internal Computer Networks48
3.5.3Computational Subsystems48
3.5.3.1Centralized Keyboard Video Monitor (KVM) Position48
3.5.3.2Host Computational System (HCS)49
3.5.3.3Instructor Operator Station49
3.5.3.4Software Support Environment (SSE)49
3.5.3.5SSE Interface Requirements49
3.5.3.5.1Software Configuration Management49
3.5.3.5.2DVCS clients50
3.5.4Peripherals50
3.5.4.1Drive Trays50
3.5.4.2Displays50
3.5.5Open Software Architecture50
3.5.5.1Commercial and Non-Developmental Item Software50
3.5.5.2Noncommercial Software50
3.5.5.3Software Stability and Reliability50
3.5.5.4Diagnostic Software51
3.5.6DORT Program51
3.5.7Spare Computational Resource Requirements51
3.5.7.1Physically Separated Networks51
3.5.7.1.1Network Spare51
3.5.7.2I/O Interface52
3.5.7.2.1I/O Subsystem Spare Capacity52
3.6Design and Construction Constraints52
3.6.1Cleaning52
3.6.2Threaded Fasteners52
3.6.3Wiring52
3.6.3.1Shielding52
3.6.4Metals52
3.6.5Wood Products52
3.6.6Radioactive Material53
3.6.7Processes53
3.6.7.1Painting, and Preparation for Painting53
3.6.7.2Nonskid Surfaces53
3.6.7.3Corrosion Prevention53
3.6.8Flammable Materials53
3.6.9Fungus-inert Materials53
3.6.10Hazardous Materials53
3.6.10.1Use of Hazardous Materials53
3.6.10.2Marking of Hazardous Materials54
3.6.10.3Precautions54
3.7Logistics-related Requirements54
3.7.1Environmental Conditions54
3.7.2Materials and Processes54
3.7.2.1Parts54
3.7.2.1.1Custom Designed Microelectronic Devices54
3.7.2.1.2Power Supplies54
3.7.2.2Materials54
3.7.3Maintenance55
3.7.3.1Maintenance Concept55
3.7.3.1.1Maintenance Clearance55
3.7.3.1.2On-Equipment, Organizational Maintenance55
3.7.3.1.3Off-Equipment, Intermediate Level Maintenance55
3.7.3.1.4Depot Level Maintenance56
3.7.3.2Service-life Items56
3.7.3.3Qualitative Maintainability Requirements56
3.7.3.3.1Special Tools56
3.7.3.3.2Lamps56
3.7.3.3.3Blown Fuse Indicator Lights56
3.7.3.3.4Utility Receptacles56
3.7.3.3.5Accessibility57
3.7.3.3.6Cable Slack57
3.7.3.3.7Parts57
3.7.3.3.7.1Interchangeability57
3.7.3.3.8Assemblies57
3.7.3.3.9Covers, Panels, and Doors58
3.7.3.3.10Handles58
3.7.3.3.11Modular Assemblies58
3.7.3.4Circuit Cards58
3.7.3.4.1Circuit Card Connectors59
3.7.3.4.2Circuit Card Connectors, Power and Ground59
3.7.3.4.3Wiring Board Extender Cards59
3.7.4Reliability59
3.7.5Maintainability59
3.7.6Facilities, Facility Interfaces, and Facility Equipment59
3.7.6.1Training Device Maintenance Access59
3.7.6.2Safety60
3.7.6.3Cables60
3.7.6.4Equipment Cooling60
3.7.6.5Life Safety60
3.7.6.6Fire Protection60
3.7.6.7Protective Devices60
3.7.6.7.1Voltage Transients60
3.7.6.7.2Phase Rotation60
3.7.6.7.3Frequency Transients60
3.7.6.7.4Power Interruption61
3.7.6.8Training Device Power Requirements61
3.7.6.8.1Power Distribution61
3.7.6.8.2Phase Balance61
3.7.6.8.3Operational Electrical Interlock61
3.7.6.9Uninterruptible Power Supply (UPS) System61
3.7.6.9.1UPS Standard61
3.7.6.9.2Backup Power61
3.7.6.9.3Compatibility61
3.7.6.9.4Damage Prevention61
3.7.6.9.5Surge Suppression61
3.7.6.9.6Notification62
3.7.6.9.7Output62
3.7.6.9.8Distortion62
3.7.6.9.9Backup Power62
3.7.6.9.10Integration62
3.7.6.9.11Automation62
3.7.6.9.12Protection62
3.7.6.9.13Interface62
3.7.6.9.14Configurability62
3.7.6.9.15Reporting62
3.7.6.9.16Self-test62
3.7.6.9.17Test Results63
3.7.6.9.18Event Log63
3.7.6.9.19User Viewable63
3.7.6.9.20Historical Data Reporting63
3.7.6.9.21Operating Limits63
3.7.6.9.22Run Time63
3.7.6.9.23Battery Replacement63
3.7.6.9.24Capacity63
3.8Product Marking63
3.8.1Training Device Nameplate63
3.8.2Marking of Units, Assemblies, Subassemblies, and Parts64
3.8.2.1Units Marking65
3.8.2.2Plug-in Assemblies Marking65
3.8.2.3Fuse Holders Marking65
3.8.2.4Controls and Indicating Device Marking66
3.8.2.5Sockets Marking66
3.8.2.6Printed Wiring Boards Marking66
3.8.2.7Terminals, Terminal Blocks, and Strips Marking66
3.8.2.8ESD Marking67
3.8.2.8.1ESD Sensitive Assemblies Marking67
3.8.2.8.2ESD Sensitive Equipment Marking67
3.8.2.8.3External Equipment Terminals Marking68
3.8.2.9Fluid and Gaseous Lines Marking68
3.8.3Reference Designators Marking68
3.8.4Cable and Wire Markings69
3.8.5Cable Marking Method69
3.8.5.1Cable Marking Information69
3.8.5.1.1“W” and “P” Cable Designations69
3.8.5.1.2To-from Designators70
3.8.5.1.3Assembly/Part Number Marking71
3.8.6Commercial Items, and Non-Developmental Items Marking71
3.8.6.1Commercial Items, and Non-Developmental Items Identification, Nameplates, and Labels71
3.8.7Warning Marking for Simulated and Modified Equipment71
3.8.7.1Training Device-use-only Identification Marking71
3.8.8Safety Markings71
3.8.8.1Equipment Energized from Multiple Power Sources Marking72
4.VERIFICATION72
4.1Verification Methods72
4.2Verifications Events73
4.3Inspections and Verifications73
4.3.1Training System or Subsystem Functional Verification73
4.3.1.1Training Task and Objectives Verification73
4.3.1.2IOS Verification73
4.3.1.3Subsystem Function Verification74
4.3.1.4Testing Operational Availability and Reliability Verification74
4.3.1.4.1Assessment duration74
4.3.1.4.2Failure Criteria74
4.3.1.4.3Testing Operational Availability and Reliability Verification Conditions74
4.3.1.4.3.1Environmental Conditions during Testing Operational Availability and Reliability Verification74
4.3.2Environmental, Safety, and Operational Health (ESOH) Verification74
4.3.2.1Emergency Equipment Power Disconnect Verification74
4.3.2.2Temperature Sensing Alarm Verification75
4.3.3Security and Privacy Verification75
4.3.3.1Classification Verification75
4.3.3.2Cybersecurity Verification75
4.3.4System Environment Verification75
4.3.4.1E3 Verification75
4.3.4.1.1DELETED75
4.3.4.1.1.1DELETED75
4.3.4.1.2DELETED75
4.3.4.1.3ESD Verification75
4.3.4.2Lightning Verification75
4.3.4.3Bonding Verification76
4.3.5Ancillary Items Verification76
4.3.5.1Structural Verification76
4.3.5.2Electrical Verification76
4.3.5.2.1Grounding and Grounding Systems Verification76
4.3.5.3Thermal Survey76
4.3.6Computer Resource Verification76
4.3.6.1DORT Verification76
4.3.6.2Spare Resource Measurement Verifications76
4.3.6.2.1Spare CPU Capacity Verification77
4.3.6.2.2Spare Memory Verification77
4.3.6.2.3Spare Storage Verification77
4.3.6.2.4Network Spare Verification77
4.3.6.2.5I/O Interface Variation78
4.3.7Nonfunctional Verification78
5.PACKAGING78
5.1Packaging78
6.NOTES78
6.1Definitions78
6.1.1Contractor Logistics Support Concept78
6.1.2Control Drawing79
6.1.3Cybersecurity-Enabled OSs79
6.1.4Depot Level Maintenance79
6.1.5Design Basis Aircraft79
6.1.6Failure Definitions and Criteria79
6.1.6.1Chargeable Failures79
6.1.6.2Non-chargeable Failures80
6.1.6.3Non-relevant Failures80
6.1.6.4Relevant Failures80
6.1.7High Fidelity81
6.1.8Interchangeable Item81
6.1.9Intermediate Level Maintenance81
6.1.10Operational Hours81
6.1.11Scheduled Maintenance81
6.1.12Service-life Item82
6.1.13Unscheduled On-Site Maintenance82
6.1.14User Interface82
6.1.15Verification Methods82
6.1.15.1Analysis82
6.1.15.2Demonstration82
6.1.15.3Examination82
6.1.15.4Test82
6.1.16Worst-Case Scenario(s)82
6.2Acronyms and Abbreviations83
6.3Changes from Previous Issue85
CUIPRF 230007B
22 Nov 2024
CUIPRF 230007B
22 Nov 2024

Table of Contents

Section Title Page xiv

CUI

xiii

CUI

Tables

Table No.TitlePage
TABLE I IVHMS failed components7
TABLE II ECS failed components8
TABLE III FCS failed components9
TABLE IV Comm 1 AN/ARC-210(V) System failed components9
TABLE V Comm 2 AN/ARC-210(V) System failed components10
TABLE VI MIDS failed components11
TABLE VII SATCOM System failed components12
TABLE VIII ICS failed components12
TABLE IX AC Power System failed components13
TABLE X DC Power System failed components14
TABLE XI Fire Detection System failed components15
TABLE XII Fire Extinguishing System failed components15
TABLE XIII Pressure Refueling and Defueling System failed components16
TABLE XIV Fuel Dump System failed components17
TABLE XV Fuel Quantity Gauging System failed components17
TABLE XVI First Stage Hydraulic System failed components18
TABLE XVII SIS failed components19
TABLE XVIII AMS failed components19
TABLE XIX Master Warning System failed components20
TABLE XX Landing Gear Control System failed components21
TABLE XXI Instrument Panel Lighting System failed components22
TABLE XXII Controllable Searchlight System failed components23
TABLE XXIII EELS failed components23
TABLE XXIV No. 1 ADS failed components24
TABLE XXV No. 2 ADS failed components25
TABLE XXVI No. 3 ADS failed components26
TABLE XXVII No. 1 Radar Altimeter System failed components26
TABLE XXVIII No. 2 Radar Altimeter System failed components27
TABLE XXIX VHF Omnidirectional, ILS and Marker Beacon System failed components28
TABLE XXX No. 1 Embedded Global Positioning and Inertial Navigation System failed components29
TABLE XXXI No. 2 Embedded Global Positioning and Inertial Navigation System failed components30
TABLE XXXII IBU System failed components30
TABLE XXXIII No. 1 UMS failed components31
TABLE XXXIV No. 2 UMS failed components32
TABLE XXXV APU System failed components33
TABLE XXXVI Overhead Door and Cargo Ramp System failed components34
TABLE XXXVII MRB Fold System failed components34
TABLE XXXVIII RBS failed components35
TABLE XXXIX MGB Chip Detector System failed components36
TABLE XL NGB Chip Detector System failed components37
TABLE XLI TGB/IGB Chip Detector System failed components37
TABLE XLII Tail Pylon Fold System failed components38
TABLE XLIII Engine System failed components39
TABLE XLIV FLIR System failed components40
TABLE XLV IFF System failed components40
TABLE XLVI Countermeasures Dispenser System failed components41
TABLE XLVII Radar Signal Detecting Set AN/APR-39C(V)2 System failed components42
TABLE XLVIII DIRCM AN/AAQ-24(V) System failed components43
TABLE XLIX Laser Detecting Set AN/AVR-2B(V) System failed components44
TABLE L Government facilities interfaces61
CUIPRF 230007B
22 Nov 2024

Table of Contents

Figures

Figure. No.TitlePage
FIGURE 1.Sample Training Device Nameplate64
FIGURE 2.Unit Identification Plate65
FIGURE 3.Electrostatic Discharge Symbols67
FIGURE 4.Electrostatic Discharge Caution Label68
FIGURE 5.Example of Cable Markings70
FIGURE 6.Trainer Use Only Identification71
FIGURE 7.Multiple Power Source Label72
CUIPRF 230007B
22 Nov 2024

Performance Specification for CH-53K CNI Training Device

SCOPE

This specification establishes the functional, performance, and verification requirements for a new United States Marine Corps (USMC) CH-53K Communication, Navigation and Instrumentation (CNI) maintenance trainer that will be at the Center for Naval Aviation Technical Training Marine Unit (CNATT MARU) facilities building AS235 located at Marine Corps Air Station (MCAS) New River, Jacksonville, North Carolina.

System Identification The CH-53K CNI is designated as Device 11B112. The CNI will be used as a full-size training device to aid in the development of maintenance skills and support first-level maintenance training of the CH-53K cockpit and avionics areas to maintenance personnel as described herein, see section 3.1 and subsequent paragraphs.

System Overview The primary use of the CNI training device will be to train cockpit and avionics system familiarization, component identification, the performance of function tests and all variations of Built-In Tests, fault isolation and remove and installs of selected Weapons Repairable/Replaceable Assemblies or Line Replaceable Assemblies.

Document Overview For purposes of this specification, the terms CNI, device, trainer, training system, and training device are equivalent. The terms “shall”, “will”, and “objective” are used with specific intent throughout this document. All requirements are threshold requirements except those specified as objective. The threshold requirements represent the minimum acceptable value necessary to satisfy the training need. The use of “shall” denotes a threshold. Requirements defined using “shall” are considered to be binding and require formal verification. Requirements defined using “will” express intent, are not binding, and therefore do not require formal verification. The term “objective” expresses capabilities beyond the threshold requirement. Objectives present an opportunity to exceed the threshold requirement if a cost effective implementation is achievable.

APPLICABLE DOCUMENTS

General The documents listed in this section are cited in sections 3, 4, and 5 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet the specified requirements of documents cited in sections 3, 4, and 5 of this specification, whether or not they are listed.

Government Documents Specifications, Standards, and Handbooks The following specifications, standards, and handbooks of the exact revision listed below form a part of this specification to the extent specified herein.

Department of Defense Standards

MIL-STD-130N
-
Identification and Marking of U.S. Military Property.

(Copies of these documents are available online at https://quicksearch.dla.mil or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094)

Department of Defense Handbooks

MIL-HDBK-454C
-
General Guidelines For Electronic Equipment

(Copies of these documents are available online at https://quicksearch.dla.mil or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094)

Other Government Documents, Drawings, and Publications The following Government documents, drawings, and publications of the exact revision level shown form a part of this document to the extent specified herein.

Code of Federal Regulations

21 CFR 1040
-
Performance Standards for Light-Emitting Products
29 CFR 1910
-
Occupational Safety and Health Standards

(Copies of this document are downloadable from http://www.ecfr.gov)

DOD Security/Cybersecurity Documents

CNSSI 1253
-
Committee on National Security Systems Instruction - Security Categorization and Control Selection for National Security Systems, dated 27 March 2014
DoDI 8500.01
-
Cybersecurity, Incorporating Change1, effective 07 October 2019
DoDI 8510.01
-
Risk Management Framework for DoD Systems Risk Management Framework Incorporating Change 1, effective 24 19 May July 202216
NIST SP 800-53 Revision 5
-
Security and Privacy Controls for Information Systems and Organizations, dated September 2020 (Updates as of December10, 2020)
NIST SP 800-131A Revision 2
-
Transitioning the Use of Cryptographic Algorithms and Key Lengths, dated March 2019
NIST SP 800-147B
-
BIOS Protection Guidelines for Servers, dated August 2014
ISO/IEC 11889-1:2015
-
Information Technology – Trusted Platform Module Library – Part 1: Architecture, Second Edition, dated 15 December 2015 (Corrected 01 April 2016)

ISO/IEC 11889-2:2015

Information Technology – Trusted Platform Module Library – Part 2: Structures, Second Edition, dated 15 December 2015

ISO/IEC 11889-3:2015

Information Technology – Trusted Platform Module Library – Part 3: Commands, Second Edition, dated 15 December 2015

ISO/IEC 11889-4:2015
-
Information Technology – Trusted Platform Module Library – Part 4: Commands, Second Edition, dated 15 December 2015
FIPS 140-3
-
Security Requirements for Cryptographic Modules, dated 22 March 2019
DoDI 8551.01
-
Ports, Protocols, and Services Management (PPSM), Incorporating Change 1, effective 27 July 2017)

(Copies of the above documents are downloadable from https://www.esd.whs.mil/directives/issuances/, https://csrc.nist.gov/publications, https://www.dcsa.mil/portals/91/documents/ctp/nao/CNSSI_No1253.pdf, https://standards.iso.org/ittf/PubliclyAvailableStandards/index.html)

DoD Unified Facilities Criteria (UFC)

UFC 3-600-1
-
Fire Protection Engineering for Facilities, with Change 6

(Copies of the above documents are downloadable from https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc)

Naval Air Systems Command (NAVAIR) Documents

A1-CH53K-IETM-MMO-000
-
Organizational Maintenance Navy Model CH-53K.
NAVAIR 01-1A-505-1
-
Volume 1 Aircraft Electric and Electronic Wiring

(Copies of the above documents will be delivered as Government-furnished information)

Office of the Law Revision Counsel United States Code

Title 17 USC § 401
-
Notice of copyright: Visually perceptible copies

(Copies of this document are downloadable from http://uscode.house.gov/)

United States (US) Army Corp of Engineers – Engineer Manuals

EM-385-1-1
-
Safety and Health Requirements

(Copies of these documents are downloadable from https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/)

Non-Government Publications American National Standards Institute (ANSI)/National Electrical Manufacturers Association (NEMA)

ANSI/NEMA Z535.1-2022
-
Safety Colors
ANSI/NEMA Z535.2-2011 (R2017)
-
Environmental and Facility Safety Signs
ANSI/NEMA Z535.3-2022
-
Criteria for Safety Symbols
ANSI/NEMA Z535.4-2011 (R2017)
-
Product Safety Signs and Labels
ANSI/NEMA Z535.5-2022
-
Safety Tags and Barricade Tapes (for Temporary Hazards)

(Copies of these documents are available from www.ansi.org)

American Society of Mechanical Engineers (ASME)

ASME Y14.44 2008 (R2014)
-
Reference Designations for Electrical and Electronics Parts and Equipment

(Copies of this document are available from http://www.asme.org)

JEDEC Solid State Technology Association

JESD471 (R2009)
-
Symbol and Label for Electrostatic Sensitive Devices
JS-001-2017
-
Joint JEDEC/ESDA Standard for Electrostatic Discharge Sensitivity Test – Human Body Model (HBM) – Component Level

(Copies of this document are available from http://www.jedec.org)

National Fire Protection Association (NFPA)

NFPA 70
-
National Electrical Code, 2023 Edition
NFPA 72
-
National Fire Alarm and Signaling Code, 2022 Edition
NFPA 90A
-
Standard for the Installation of Air-Conditioning and Ventilating Systems
NFPA 101
-
Life Safety Code, 2021 Edition
NFPA 110
-
Standard for Emergency and Standby Power Systems, 2022 Edition
NFPA 704
-
Standard System for the Identification of the Hazards of Materials for Emergency Response, 2022 Edition
NFPA 2001
-
Standard on Clean Agent Fire Extinguishing Systems, 2022 Edition

(Copies of the above documents are downloadable from http://www.nfpa.org and are available from are available from NFPA 1 Batterymarch Park Quincy, Massachusetts USA 02169-7471)

Order of Precedence Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this specification and the references cited herein, the text of this specification takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

REQUIREMENTS

The CNI device functional and performance characteristics shall be in accordance with (IAW) the following subordinate paragraphs, based on procedures/tasks identified in the latest version of CH-53K Interactive Electronic Technical Manual (IETM) (A1-CH53K-IETM-MMO-000), and aligned to the latest aircraft Bureau Number (BUNO) # XXXXXX with IETM lockdown to occur NLT 30 days prior to PDR and provided to seller.

Subsystem Functional Requirements Training Tasks and Objectives The trainer shall

1. be a stand-alone, full-size, high fidelity (see 6.1.7) maintenance task trainer replicating the CH-53K nose, cockpit, and forward cabin section to Station 282 on the System Demonstration Test Article (SDTA) 6 airframe (provided as GFE located at NAS Patuxent River, MD) including but not limited to the overhead and instrument panels, consoles, avionics bays and shelves, flight controls, Multifunctional Displays (MFDs) and Control Display Units (CDUs);

only include CH-53K cockpit through forward Station 282;

have the components necessary to accomplish the maintenance procedures listed in 3.1.3;

have embedded simulated or stimulated functionality, with a separate instructor operator station (IOS) for fault insertion/isolation/correction;

represent the latest version CH-53K aircraft BUNO represented by CH-53K design basis aircraft (DBA) (see 6.1.5) available 30 days prior to PDR;

be comprised of components, panels and avionics replicating the form and fit as the CH-53K DBA (see 6.1.5);

present the trainees with realistic operational checkout, troubleshooting situations, and component replacement tasks; and function IAW latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, demonstrating the operation, testing, fault identification and isolation, adjustment, diagnostics, and replacement of the aircraft systems and components.

Trainer Tasks and Objectives Precedence The training system shall not require wire repair except as explicitly stated in the tables within subsections of 3.1.3. The tables within the subsections of 3.1.3 correspond with A1-CH53K-IETM-MMO-000 available 30 days prior to PDR.

1.1.1 IOS Subsystem

The IOS shall

1. identify the designated training scenario with reference to applicable maintenance task in the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, including Fault Code, Fault Condition, and failed component if applicable;

have controls to monitor and display system status;

have instructor controls to initiate, and stop training events;

assign functional test and insert fault training scenarios;

manually insert and reset system fault conditions; and monitor and fault trainer system circuit breakers;

b. have controls to turn on and off electrical power to support tasks in the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

c. perform Diagnostic analysis of the trainer (Daily Operational Readiness Test (DORT)); and have controls to insert up to three, unrelated tasks (not cascading faults), simultaneously.

Training System or Subsystem Functional Requirements The CNI shall

1. replicate system functional testing with no failure IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

replicate system functional testing with failures IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have the failures defined as a single combination of Fault Code and Fault Condition per training exercise as defined per the tables within subsections of 3.1.3;

have fault isolation and troubleshooting defined as the same;

have the failures display the associated failure indicators for that combination of Fault Code and Fault Condition on the CNI MFD;

replicate system troubleshooting and failure identification IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, with the following fidelity:

1. high fidelity (see 6.1.7) physical interface connectors;

high fidelity (see 6.1.7) physical components;

replicate component location, obstructions and accessibility IAW CH-53K DBA (see 6.1.5);

replicate component interfaces and attachments with training device IAW CH-53K DBA (see 6.1.5);

replicate component attachments to the training device IAW CH-53K DBA (see 6.1.5);

replicate wiring harnesses, routing, and interfacing IAW CH-53K DBA (see 6.1.5); and replicate continuity or voltage reading for specified fault IAW CH-53K DBA (see 6.1.5);

receive the inserted fault from the IOS IAW the tables within subsections of 3.1.3;

have the fidelity and functionality required to repair the fault by replacement of failed high fidelity (see 6.1.7) replica or actual component;

receive the command from the IOS, and to clear the inserted fault manually; and have sounds and aural cues associated to normal operation and faults within the latest version A1-CH53K-IETM-MMO-000 tasks available 30 days prior to PDR identified in this specification (e.g. inter-communication system (ICS), radios, Auxiliary Power Unit (APU), engine start, audio master caution warnings, etc.), to support training outcome IAW latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR.

Integrated Vehicle Health Management System (IVHMS) Integrated Built-In-Test (IBIT) The CNI shall

1. replicate the CH-53K IVHMS IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have an IVHMS comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the IVHMS Function Test with no failure indication IAW the latest version available A1-CH53K-IETM-MMO-000, 30 days prior to PDR, procedure 19-10-00-01A-340A-A, excluding steps 5-6;

have IOS controls to insert and remove Fault Codes and Fault Conditions (if applicable) listed in TABLE I for IVHMS functional IBIT test;

perform IVHMS IBIT with the indicated Fault Codes and Fault Conditions (if applicable) listed in TABLE I IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 19-10-00-01A-340A-A;

perform fault isolation procedures per the Fault Codes and Fault Conditions (if applicable) listed in TABLE I IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 19-10-00-01A-421A-A;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE I; and execute the IVHMS Function Test with no failure indications after the failed component has been repaired.

TABLE I IVHMS failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
No. 1 Data Concentrator Unit Junction Box
19-10-00-03
17F7C90D
31-40-03-04A-920A-A
Maintenance Data Transfer Unit
19-10-00-20
03D67647
19-10-03-01A-920A-A
No. 2 Integrated Vehicle Health Management Unit
19-10-00-97
D43609ED
19-10-02-01A-920A-A
No. 2 Data Concentrator Unit Junction Box
19-10-00-99
04D25581
31-40-04-04A-920A-A
#1 Cabin Relay Panel Relay K102
19-10-00-111
N/A
24-90-01-01C-663B-A

Environmental Control System (ECS) IBIT The CNI shall

1. replicate the CH-53K ECS IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have an ECS comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the ECS Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000, available 30 days prior to PDR, procedure 21-90-00-01A-340A-A, excluding steps 6-10;

have IOS controls to insert and remove the Fault Codes and Fault Conditions listed in TABLE II for ECS functional IBIT test;

perform ECS functional IBIT Function Test with the indicated Fault Codes and Fault Conditions listed in TABLE II IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 21-90-00-01A-340A-A;

perform fault isolation procedures per the Fault Codes and Fault Conditions listed in TABLE II IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 21-90-00-01A-421A-A, excluding Fault Codes 21-90-00-31, 21-90-00-32 and 21-90-00-37;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE II, excluding Fault Codes 21-90-00-31, 21-90-00-32 and 21-90-00-37; and execute the ECS Function Test with no failure indications after the failed component has been repaired.

TABLE II ECS failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
ECS Control Panel
21-90-00-02
9D9C79B5
31-10-05-03A-920A-A
Circuit Breaker Cabin Divert (CB1D16)
21-90-00-04
859B7387
24-91-03-01C-663B-A
ECS Control Panel
21-90-00-20
311B8E2E
31-10-05-03A-920A-A
No. 2 Engine Bleed Shut Off Valve
21-90-00-31
562DB87C
(Repair capability not required)
No. 3 Engine Pneumatic Molded Harness.
21-90-00-32
A1083DE4
(Repair capability not required)
Secondary Power System Electronic Control Unit
21-90-00-35
13BB4D2E
49-31-01-01A-920A-A
Bleed Supply Pressure Sensor
21-90-00-37
F7C38096
(Repair capability not required)

Flight Control System (FCS) IBIT

1. replicate the CH-53K FCS IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have a FCS comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the FCS Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 22-10-00-01A-340A-A, excluding steps 4.6.5 -16;

have IOS controls to insert and remove Fault Codes and Fault Conditions listed in TABLE III for FCS functional IBIT test;

perform FCS functional IBIT Function Test with the indicated Fault Codes and Fault Conditions listed in TABLE III IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 22-10-00-01A-340A-A, excluding steps 4.6.5 through 4.6.8;

fault isolation procedures per the Fault Codes and Fault Conditions listed in TABLE III IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 22-10-00-01A-421A-A;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE III; and execute the FCS Function Test with no failure indications after the failed component has been repaired.

TABLE III FCS failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
Copilot Cyclic Inceptor
22-10-00-06
787BC254
67-10-02-01A-920A-A
Copilot Collective Inceptor
22-10-00-18
1A6476BC
67-10-04-01A-920A-A
No. 2 Flight Control Computer
22-10-00-83
610CB591
22-10-02-01A-920A-A

Communication (Comm) 1 AN/ARC-210(V) System IBIT

1. replicate the CH-53K Comm 1 AN/ARC-210(V) System IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have a Comm 1 AN/ARC-210(V) System comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the Comm 1 AN/ARC-210(V) System Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-10-01-01A-340A-A, excluding step 5;

have IOS controls to insert and remove the Fault Code and Fault Condition listed in TABLE IV for Comm 1 AN/ARC-210(V) System functional IBIT test;

perform Comm 1 AN/ARC-210(V) System functional IBIT Function Test with the indicated Fault Code and Fault Condition listed in TABLE IV IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-10-01-01A-340A-A;

perform fault isolation procedures per the Fault Code and Fault Condition listed in TABLE IV IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-10-01-01A-421A-A;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE IV; and execute the Comm 1 AN/ARC-210(V) System Function Test with no failure indications after the failed component has been repaired.

TABLE IV Comm 1 AN/ARC-210(V) System failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
No. 1 Data Concentrator Unit Junction Box
23-10-01-01
8D81E556
31-40-03-04A-920A-A

Comm 2 AN/ARC-210(V) System IBIT

1. replicate the CH-53K Comm 2 AN/ARC-210(V) System IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have a Comm 2 AN/ARC-210(V) System comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the Comm 2 AN/ARC-210(V) System Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-10-02-01A-340A-A, excluding step 5;

have IOS controls to insert and remove the Fault Code and Fault Condition listed in TABLE V for Comm 2 AN/ARC-210(V) System functional IBIT test;

perform Comm 2 AN/ARC-210(V) System functional IBIT Function Test with the indicated Fault Code and Fault Condition listed in TABLE V IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-10-02-01A-340A-A;

perform fault isolation procedures per the Fault Code and Fault Condition listed in TABLE V IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-10-02-01A-421A-A;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE V; and execute the Comm 2 AN/ARC-210(V) System Function Test with no failure indications after the failed component has been repaired.

TABLE V Comm 2 AN/ARC-210(V) System failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
No. 2 Data Concentrator Unit Junction Box
23-10-02-01
E4E3F58F
31-40-04-04A-920A-A

Multifunctional Information Distribution System (MIDS) IBIT

1. replicate the CH-53K MIDS IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have a MIDS comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the MIDS Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-11-00-01A-340A-A, excluding steps 6-7;

have IOS controls to insert and remove Fault Codes and Fault Conditions listed in TABLE VI for MIDS functional IBIT test;

perform MIDS functional IBIT Function Test with the indicated Fault Codes and Fault Conditions listed in TABLE VI IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-11-00-01A-340A-A;

perform fault isolation procedures per the Fault Codes and Fault Conditions listed in TABLE VI IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-11-00-01A-421A-A;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE VI; and execute the MIDS Function Test with no failure indications after the failed component has been repaired.

TABLE VI MIDS failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
Link 16 MIDS and TACAN Mount
23-11-00-01
1669497E
23-11-13-01A-920A-A
Circuit Breaker CB3D05
23-11-00-01
1669497E
24-91-01-01C-663B-A
Link 16 Remote Power Supply
23-11-00-02
E795478B
23-11-11-01A-920A-A
Circuit Breaker CB3D02
23-11-00-02
E795478B
24-91-01-01C-663B-A
No. 2 Data Concentrator Unit Junction Box
23-11-00-03
7C1A306F
31-40-04-04A-920A-A
Com 3 Lower Link 16 and TACAN Antenna
23-11-00-06
B196621F
23-11-04-01A-920A-A
Com 3 Lower Link 16 and TACAN Antenna High Pass Filter
23-11-00-06
B196621F
23-11-07-01A-920A-A
Link 16 MIDS and TACAN Receiver
23-11-00-06
B196621F
23-11-12-01A-920A-A

Satellite Communications (SATCOM) System IBIT

1. replicate the CH-53K SATCOM System IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have a SATCOM System comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the SATCOM System Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-15-00-01A-340A-A;

have IOS controls to insert and remove Fault Codes and Fault Conditions listed in TABLE VII for SATCOM System functional IBIT test;

perform SATCOM System functional IBIT Function Test with the indicated Fault Codes and Fault Conditions listed in TABLE VI IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-15-00-01A-340A-A;

have ability to perform fault isolation procedures per the Fault Codes and Fault Conditions listed in TABLE VI IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-15-00-01A-421A-A;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE VI; and execute the SATCOM System Function Test with no failure indications after the failed component has been repaired.

TABLE VII SATCOM System failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
Antenna Switching Unit
23-15-00-01
0C576036
23-10-04-01A-920A-A
No. 1 Data Concentrator Unit Junction Box
23-15-00-14
E9ADC747
31-40-03-04A-920A-A

Inter-Communication System (ICS) IBIT

1. replicate the CH-53K ICS IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have an ICS comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the ICS Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-50-00-01A-340A-A, excluding steps 5-11;

have IOS controls to insert and remove Fault Codes listed in TABLE VIII for ICS functional IBIT test;

perform ICS functional IBIT Function Test with the indicated Fault Codes listed in TABLE VIII IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-50-00-01A-340A-A;

perform fault isolation procedures per the Fault Codes listed in TABLE VIII IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 23-50-00-01A-421A-A;

remove and reinstall the failed components IAW the Repair IETM column listed in TABLE VIII; and execute the ICS Function Test with no failure indications after the failed component has been repaired.

TABLE VIII ICS failed components

Failed Component
Fault Code
Fault Condition
Repair IETM
Pilot Inter-Communication Control Panel
23-50-00-19
N/A
23-50-03-01A-920A-A
Pilot Cyclic
23-50-00-19
N/A
67-10-01-03A-920A-A
Resistor R2003R
23-50-00-25
N/A
91-20-00-21A-685A-A

Alternating Current (AC) Power System IBIT

1. replicate the CH-53K AC Power System IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

have an AC Power System comprised of actual and/or simulated components, with the fidelity required to facilitate system component identification and perform function tests, fault isolation procedures, removal, repairs, and installations associated with the components IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR;

contain the components, subcomponents, and hardware to execute the AC Power System Function Test with no failure indication IAW the latest version A1-CH53K-IETM-MMO-000 available 30 days prior to PDR, procedure 24-20-00-01A-340A-A, excluding steps 6-7;

have IOS controls to insert and remove Fault Codes and Fault Conditions listed in TABLE IX for AC Power System functional IBIT test;

perform AC Power System functional IBIT Function Test with the indicated Fault Codes and Fault Conditions listed in TABLE IX IAW the latest version A1-CH53K-IETM-MMO-000 available 30…