Ch 149 Library Window Replacement Bid Package DRAFT RR V3.docx

DOCX document 125 KB Posted

Attached to
Bridgewater Public Library Window Replacement
Solicitation number
BD-26-1249-B610-B610-135540
Issued by
Bristol County, Boston City, Massachusetts

About this file

This is a sealed bid invitation from the Town of Bridgewater, Massachusetts for the removal and replacement of deteriorated windows at the Bridgewater Public Library located at 15 South Street, Bridgewater, MA 02324. The project scope includes removal of 26 existing double-hung windows from the original 1972 building, three extended half-round picture windows, and one mulled picture window assembly with half-round transom, along with installation of replacement windows meeting Energy Star certification and Low-E insulated glazing standards, plus interior and exterior trim work. Bidders are required to attend a mandatory pre-bid conference and site visit on December 8, 2026 at 10:00 AM. The deadline for submitting written questions is December 11, 2026 at 4:00 PM. Sealed bids are due December 17, 2026 at 11:00 AM at the Municipal Office Building, 66 Central Square, Bridgewater, MA 02324, where they will be publicly opened and read aloud. The contract duration is 60 consecutive calendar days from the Notice to Proceed, with substantial completion required at that time and final completion thereafter. Bidders must demonstrate a minimum of three completed municipal or public-building window replacement projects within the last five years.

Each bid must be accompanied by bid security equal to 5% of the bid price in the form of a bid bond, cash, or certified check. The successful contractor must furnish a performance bond and a payment bond, each in an amount equal to 50% of the total contract price from a surety company qualified to do business in Massachusetts. Prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development apply to this project, with contractors required to file weekly certified payroll records. Contractors must maintain commercial general liability insurance with minimum limits of $1,000,000 per occurrence and $3,000,000 aggregate, automobile liability insurance of $1,000,000 combined single limit, and workers' compensation insurance as required by Massachusetts General Law Chapter 152. The contract will be awarded to the lowest responsible and eligible bidder based on qualifications and bid price. Liquidated damages of $1,000 per consecutive calendar day apply for failure to complete within the specified timeframe. All work must comply with the Massachusetts Building Code, current Stretch Energy Code requirements, OSHA regulations, and applicable accessibility standards. The contractor shall assume lead-containing materials may be present in the 1972 building and must comply with all federal and state regulations regarding hazardous materials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Bridgewater 66 Central Square Bridgewater, MA 02324

Invitation for Bid

Project Name:
Public Library Window Replacement Project
Site Visit Date & Time:
December 8, 2026 @ 10AM
Last Date for Questions:
December 11, 2026 @ 4PM
Due Date & Time for Proposals:
December 17, 2026 @ 11AM

Key Dates & Information

TABLE OF CONTENTS

Section Number

Bidding and Contract Requirements

Invitation to Bid00020
Instructions to Bidders00100
Form of General Bid00300
Agreement00500
Construction Performance Bond00610
Construction Payment Bond00620
Supplemental Conditions00800
Excerpts from Applicable State Law00850
Specifications00900

Attachment A – Wage Rates Appendices

SECTION 00020

INVITATION FOR BIDS

The Town of Bridgewater invites sealed bids for Public Library Window Replacement Project

The bid documents may be obtained electronically by emailing: Procurement Officer at procurement@bridgewaterma.org where they are publicly available as of November 25, 2026 at 8:00AM.

General Bids will be opened on December 17, 2026 at 11 a.m. at the Municipal Office Building, 66 Central Square, Bridgewater, MA 02324. Bids will immediately be opened publicly and read aloud. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price.

Pre-Bid Conference and Site Visit will be held at 15 South Street, Bridgewater, MA 02324 on December 8, 2026 at 10 AM. It is imperative that all prospective bidders have a representative in attendance.

A performance bond in an amount equal to 50 percent of the total amount of the contract price with a surety company qualified to do business in the Commonwealth of Massachusetts will be required for the faithful performance of the contract as well as a labor and materials bond in an amount equal to 50 percent of the total contract price.

All bids for this project are subject to applicable public bidding laws of Massachusetts, including G.L. c.149, § §44A through 44H, as amended.

Attention is directed to the minimum wage rates to be paid as determined by the Commissioner of Labor and Workforce Development and the weekly payroll record submittal requirements under the provisions of Massachusetts General Laws, Chapter 149, Section 26 through 27D inclusive.

Selection of the contractor will be based upon bidder qualifications, including evidence of past performance in similar projects, and bid price. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder.

The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids.

The Town reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.

The Town of Bridgewater

SECTION 00100

INSTRUCTIONS TO BIDDERS

1. Receipt and Opening of Bids

The Town of Bridgewater, Massachusetts, herein called the Owner or Awarding Authority, will receive sealed Bids for the project known as Public Library Window Replacement Project.

General bids similarly addressed to the Town of Bridgwater and endorsed "Bid for Public Library Replacement Project" will be received at the Office of the Town Manager until 11 AM prevailing time, on December 17, 2026 at which time and place said bids will be publicly opened and read aloud.

Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified will not be considered. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids.

2. Location and Work to be Done

The Work consists of removal and replacement of windows at the public library, 15 South St, Bridgewater MA and all work incidental thereto, in accordance with the Specifications (Section 0900) and conceptual plans attached hereto.

Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer, and shall then become a part of the Contract Documents.

The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified.

The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item.

3. Preparation of Bid

Each bid must be submitted on the prescribed form. All blank spaces for bid prices must filled in, in ink or typewritten, in both words and figures.

Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his address, and endorsed with the name of the project as specified in Receipt and Opening of Bids, above. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in Receipt and Opening of Bids, above.

4. Bid Opening Procedure

The following list of requirements shall apply to each filed bid. Bids not meeting all the requirements for timeliness and security will be rejected; bids not meeting signature and addenda requirements will be rejected prior to checking of bid amounts.

Bids shall be filed at the place and before the time specified in Receipt and Opening of Bids, above.

Properly executed bid security shall be placed in a sealed envelope and shall be attached to the outside of the envelope containing the bid.

Bid signatures will be checked.

All addenda will be sent certified mail, with return receipt requested, and/or facsimile or e-mail to all prospective bidders. All bidders shall include with their bids the written acknowledgment form provided in Section 00300, FORM OF GENERAL BID.

The total dollar amount of each bid will be read, and the three apparent lowest bids will be selected for further consideration. These three apparent low bids will be read aloud for the benefit of the other bidders and the bid opening procedure will be closed. All those present at the bid opening may examine all bids after the bid opening and after the reading of the three apparent low bids.

5. Modification

Any bidder may modify his bid by written communication at any time prior to the scheduled closing time for receipt of bids. Any telegraphic communication must be received by the Owner prior to the closing time, and, provided further, the Owner must be satisfied that a written confirmation of the telegraphic modification over the signature of the bidder was mailed prior to the closing time. If written confirmation is not received within two days from the closing time, no consideration will be given to a telegraphic communication.

The communication shall not reveal the bid price but shall provide the addition or subtraction or other modification so that the final prices or terms will not be known by the Owner until the sealed bid is opened.

6. Ability and Experience of Bidder

No award will be made to any bidder who cannot satisfy the Owner that he has sufficient ability and experience in this class of work and sufficient capital and plant to enable him to prosecute and complete the work successfully within the time named. The Owner's decision or judgment on these matters will be final, conclusive, and binding.

The Owner may make such investigations as it deems necessary, and the bidder shall furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner may request.

7. Conditions of Work

Each bidder must familiarize himself fully with the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.

8. Addenda and Interpretations

No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. All information given to bidders other than by means of the plans, specifications, or by addenda, as described below, is given informally and shall not be used as the basis of a claim against the Owner.

Any clarification of requirements or requests for additional information by proposers must be made in writing to Christopher Hartman at procurement@bridgewaterma.org and submitted no later than the deadline as referenced under the bid opportunity. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.

9. Security for Faithful Performance

Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this contract and for the payment of all persons performing labor and materials under this contract. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contractor from the obligation sooner.

10. Power of Attorney

Attorneys-in-fact who sign Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

11. Laws and Regulations

The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances or bylaws, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the Contract the same as though written out in full.

12. Liquidated Damages for Failure to Enter into Contract

The successful bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within 10 days after presentation thereof by the Owner, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his/her bid, but the amount forfeited shall not exceed the difference between his/her bid price and the bid price of the next lowest responsible and eligible bidder. In case of death, disability, bona fide clerical or mechanical error of a substantial nature, or other similar unforeseen circumstances affecting the bidder, his/her bid deposit will be returned.

13. Obligation of Bidder

At the time of the opening of bids, each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of his bid.

14. Information Not Guaranteed

All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner. All such information is furnished only for the information and convenience of bidders and is not guaranteed.

It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents. It is further agreed and understood that no bidder or Contractor shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the Owner or the Architect/Engineer, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents.

15. Bid Security

Each bid and sub-bid must be accompanied by bid security in the form of a certified check, a bid bond, cash, or a treasurer's or cashier's check, payable to the Owner, in the amount of five (5) percent of the value of the bid. Such security of general bidders will be returned to all except the three lowest responsible and eligible bidders within five days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids, and the remaining securities will be returned promptly after the Owner and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to the selected contractor within 30 days, Saturdays, Sundays and holidays excluded, after the date of the opening of bids, upon demand of the bidder at any time thereafter.

16. Right to Reject Bid

The Owner reserves the right to waive any informalities in bids and to reject any and all bids, should the Owner deem it to be in the public interest to do so.

The Owner may also reject bids which in its sole judgment are either incomplete, conditional, obscure or not responsive or which contain additions not called for, erasures not properly initialed, alterations, or similar irregularities.

17. Time for Completion

The successful general bidder must agree to commence work within ten (10) days of the date of the Notice to Proceed and to fully complete the project within the time limit stated in Section 00300, FORM OF GENERAL BID.

18. Comparison of Bids

Bids will be compared on the basis of prices set forth in the bid forms.

In the event that there is a discrepancy between the lump sum or unit prices written in words and figures, the prices written in words will govern.

19. Award of Contract

The Contract will be awarded to "the lowest responsible and eligible bidder" pursuant to General Laws Chapter 149, Section 44A (2), as amended. Such a bidder shall possess the skill, ability and integrity necessary for the faithful performance of the work, shall be able to furnish labor that can work in harmony with all other elements of labor employed, or to be employed, in the work, and shall otherwise comply with all applicable provisions of law. Contract award shall be subject to availability of an appropriation for funding.

20. Statutes Regulating Competitive Bidding

Any bid which does not comply with the provisions of Massachusetts General Laws Chapter 149, Sections 44A through 44H, as amended, need not be accepted and the Owner may reject every such bid.

21. Wage Rates

Prevailing Wage Rates as determined by the Commissioner of Department of Labor and Workforce Development under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the bidder, before bid opening, to request any additional information on Prevailing Wage Rates for those tradespeople who may be employed for the proposed work under this contract.

22. Contractor Records

The Contractor shall comply with the provisions of Massachusetts General Laws, Chapter 30, Section 39R concerning Contractor records.

23. INSURANCE

The Contractor shall carry and continuously maintain until completion of the Contract, insurance as specified in Agreement and in such form as shall protect him performing work covered by this Contract, and the Town of Bridgewater and its employees, agents and officials, from all claims an liability for damages for bodily injury, including accidental death, and for property damage, which may arise from operations under this Contract. The Town shall be named as an additional insured. The Contractor covenants and agrees to hold the Town and its employees, agents and officials harmless from loss or damage due to claims for bodily injury or death and/or property damage arising from, or in connection with, operations under this Contract.

24. PROJECT MANAGER

The Owner may utilize the services of a project manager, whose duties shall be as set forth in an Agreement for Project Manager Services.

00100-6

SECTION 00300

FORM OF GENERAL BID

Bid of __________________________________ (hereinafter called "Bidder")*

(____) a corporation, organized and existing under the laws of the state of ____________________

(____) a partnership

(____) a joint venture

(____) an individual doing business as _____________________________________

To the Town of Bridgewater, Massachusetts (hereinafter called "Owner").

Gentlemen:

A) The undersigned Bidder, in compliance with your invitation for bids for the project known as the Public Library Window Replacement Project having examined the plans and specifications and related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the contract documents and the plans and specifications within the time set forth below, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the contract documents, of which this bid is a part.

The Bidder hereby agrees to commence work on or before the date to be specified in written "Notice to Proceed" of the Owner, and to substantially complete the project within 60 consecutive calendar days thereafter. The Bidder further agrees to pay as liquidated damages the sum of $1,000 Dollars for each consecutive calendar day thereafter that the work is not complete as provided in Section 00700 GENERAL CONDITIONS.

*Specify corporation, partnership or individual as applicable.

B) Bidder acknowledges receipt of and this bid includes the following addenda:

No. Dated:

No. Dated:

No. Dated:

C) The Bidder agrees to perform the bid work described in the specifications and shown on the plans for the following bid price: ____________________________________________________ dollars ($________________________).

The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.

The Bidder understands that all bids for this project are subject to the applicable bidding laws of the Commonwealth of Massachusetts, including General Laws Chapter 149 and Chapter 30, Section 39M, as amended.

The Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.

The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of bids.

Within 10 days of receipt of the written notice of acceptance of this bid, the Bidder will execute the formal Agreement set forth in Section 00500 CONTRACT.

Bid security is attached in the sum of five percent (5%) of the total bid in accordance with the conditions of Section 00100 INSTRUCTIONS TO BIDDERS. The bid security may become the property of the Owner in the event the contract and bond are not executed within the time set forth above.

The selected Contractor shall furnish a performance bond and a payment bond in an amount at least equal to fifty percent (50%) of the contract price in accordance with Section 00610 PERFORMANCE BOND, Section 00620 PAYMENT BOND, and as stipulated in the contract.

The undersigned offers the following information as evidence of his qualifications to perform the work as bid upon according to all the requirements of the plans and specifications.

1. Have been in business under present name for ____ years.

2. The names and addresses of all persons interested in the bid (if made by a partnership or corporation) as principals, are as follows:

(attach supplementary list if necessary)

00300-4

3. The bidder is requested to state below what work of a similar character to that included in the proposed contract he has done, and give references that will enable the Owner to judge his experience, skill and business standing (add supplementary page if necessary).

CompletionProjectContractDesignReference Telephone
DateNameAmountEngineerNameNo.

a.__________________________________________________________________________________________ b.__________________________________________________________________________________________ c.__________________________________________________________________________________________ d.__________________________________________________________________________________________ e.__________________________________________________________________________________________ f.__________________________________________________________________________________________

Bank reference _____________________________________ (Name)

(Bank)

(Address)

(Telephone No.)

Pursuant to M.G.L. CH. 62C, Sec. 49A, I certify hereby in writing, under penalties of perjury, that the within named Bidder/Contractor has complied with all laws of the commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting of child support.

The undersigned Bidder hereby certifies under penalties of perjury, as follows: (1) that he/she is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work; (2) that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and (3) that all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.

The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this paragraph the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.
The undersigned bidder hereby certifies, under pains and penalties of perjury, that the foregoing bid is based upon the payment to laborers to be employed on the project of wages in an amount no less that the applicable prevailing wage rates established for the project by the Massachusetts Department of Labor and Workforce Development. The undersigned bidder agrees to indemnify the awarding authority for, from and against any loss, expense, damages, actions or claims, including any expense incurred in connection with any delay or stoppage of the project work arising out of or as a result of (1) the failure of the said bid to be based upon the payment of the said applicable prevailing wage rates or (2) the failure of the bidder, if selected as the contractor, to pay laborers employed on the project the said applicable prevailing wage rates.
Respectfully submitted:
Date: ______________By: _____________________________
(Signature)
________________________________
(Type Name of Bidder)
________________________________
(Title)
________________________________
(Business Address)
________________________________
(City and State)
________________________________
(Telephone Number

00300-6

SECTION 00500

Agreement Between

TOWN AND CONTRACTOR

THIS AGREEMENT to XXXXXXXXXXXXXXXXXXX, (hereinafter referred to as the "Project"), is made the ________ day of ____________, 202X, by and between ____________________, a corporation duly organized under the laws of the Commonwealth of Massachusetts, with a usual place of business at ___________________________________, (hereinafter referred to as the "CONTRACTOR"), and the Town of Bridgewater, (hereinafter referred to as the "TOWN").

WITNESSETH that the CONTRACTOR and the TOWN, for the consideration hereinafter named, agree as follows:

ARTICLE 1: CONTRACT DOCUMENTS

The Contract Documents consist of the following, and in the event of conflicts or discrepancies among them, they shall be interpreted on the basis of the following priorities:

1) This agreement between town and contractor

2) Contractor's bid or proposal

3) Invitation for bids and bid specifications,

4) Drawings required for the project, if applicable

5) Copies of all required bonds, certificates of insurance, and licenses required under the contract, EACH OF WHICH IS ATTACHED HERETO. These documents form the entire Agreement between the parties and there are no other agreements between the parties. Any amendment or modification to this Agreement must be in writing and signed by an official with the authority to bind the Town.

ARTICLE 2: SCOPE OF WORK

The CONTRACTOR shall furnish all materials, labor and equipment, and perform all work shown on the Contract Documents, and the CONTRACTOR agrees to do everything required by this Agreement and the Contract Documents.

ARTICLE 3: TERM OF AGREEMENT

(a) The Contractor may begin work immediately at the project site and shall deliver, install and bring the work to Substantial Completion as soon as possible, but no later than XXXXXXXXXXXX. Final completion shall be XXXXXXXXXXXXX.

(b) The CONTRACTOR hereby agrees that if it fails to carry on the work with reasonable speed or stops work altogether without due cause, as determined in each case by the TOWN, the TOWN may give written notice to the CONTRACTOR to proceed with the work or to carry on the work more speedily. Seven days after the presentation of such notice, if the work is not proceeding to the satisfaction of the TOWN, the CONTRACTOR shall be considered to have defaulted in the performance of this Agreement.

ARTICLE 4: THE CONTRACT SUM

The TOWN shall pay the CONTRACTOR for the performance of this Agreement the sum of $____________ (_______________________________________ and 00/100 dollars). .

ARTICLE 5: PAYMENT

The TOWN shall make payment in accordance with General Laws chapter 30 §39K

a) With any invoice, the CONTRACTOR shall submit evidence satisfactory to the TOWN that the goods or supplies have been delivered and/or that the work has been completed in accordance with this Agreement, and that all payrolls, material bills and other indebtedness connected with the work have been paid. The billings shall include, if applicable, all charges for contractors, subcontractors, plans, equipment, models, renderings, travel, reproductions, postage and delivery, and all other expenses. There shall not be any markup for overhead, administration or profit for any of the above listed services.

b) Change orders will include a maximum of 10% for general overhead and profit. All requests for change order shall include a complete break down of all material and labor costs (Prevailing Wage). If these items are not included in the request for change, the change request will be returned to the contractor and not acted on until a full and complete request is received.

ARTICLE 6: NON-PERFORMANCE

In the case of any default on the part of the CONTRACTOR with respect to any of the terms of this Agreement, the TOWN shall give written notice thereof, and if said default is not made good within such time as the TOWN shall specify in writing, the TOWN shall notify the CONTRACTOR in writing that there has been a breach of the Agreement, and thereafter the TOWN shall have the right to secure the completion of the work remaining to be done on such terms and in such manner as the TOWN shall determine, and the CONTRACTOR shall pay the TOWN any money that the TOWN shall pay another CONTRACTOR for the completion of the work, in excess of what the TOWN would have paid the CONTRACTOR for the completion of the work, and the CONTRACTOR shall reimburse the TOWN for all expenses incurred by reason of said breach. In case of such breach, the CONTRACTOR shall be entitled to receive payment only for work satisfactorily completed prior to said breach, less any retainage the TOWN is entitled to. The amount of any balance due the CONTRACTOR shall be determined by the TOWN and certified to the CONTRACTOR.

ARTICLE 7: TERMINATION

(a) In addition to the provisions of Article 6 of this Agreement, the TOWN shall have the right to terminate this Agreement if funds are not appropriated or otherwise made available to support the continuation of this Agreement.

(b) By executing this Agreement, the CONTRACTOR assumes the risk that the necessary funding for completion of the project will be secured. If adequate funding for the project cannot be secured after execution of this contract, the Town Accountant shall certify that fact in writing for the parties.

(c) Notwithstanding any other provision of this Agreement, the TOWN reserves the right at any time to suspend or terminate this Agreement in whole or in part for its convenience or due to an unavailability of funds upon fourteen days written notice to CONTRACTOR. TOWN shall incur no liability by reason of such termination for convenience except for the obligation to pay for work performed and accepted accruing through the date of termination less any offset or claim of TOWN. Such obligation shall not exceed the available appropriation. CONTRACTOR shall have no right to recover other amounts, including but not limited to amounts for lost profits, indirect, incidental or consequential damages.

(d) If for any reason the TOWN terminates the Agreement due to lack of funding, CONTRACTOR hereby releases the TOWN and every member, agency, and agent thereof from all claims and liability to the CONTRACTOR for everything done, furnished for or relating to the work pursuant to this agreement.

(e) The CONTRACTOR shall have the right to terminate this Agreement if the TOWN fails to make payment within 45 days after it is due.

ARTICLE 8: NOTICE

All notices required to be given under this Agreement shall be in writing and shall be effective upon receipt by hand delivery or certified mail to:

Town of Bridgewater:

Town Manager – Justin Casanova- Davis

Contractor:

ARTICLE 9. INSURANCE

a) The CONTRACTOR shall, at its own expense, obtain and maintain general liability and automobile liability insurance policies protecting the TOWN in connection with any operations included in this Contract, and shall have the TOWN named as an additional insured on the policies. General liability coverage shall be in the amount of at least $1,000,000 per occurrence and $2,000,000 aggregate for bodily injury liability and property damage liability. Automobile liability insurance shall be in the amount of at least $1,000,000 combined single limit bodily injury and property damage liability.

b) The CONTRACTOR shall, before commencing performance of this Contract, provide by insurance for the payment of compensation and the furnishing of other benefits in accordance with Mass. Gen. L. Ch. 152, as amended, to all employed under the Contract and shall continue such insurance in full force and effect during the term of the Contract.

c) All insurance coverage shall be in force from the time of the Agreement to the date when all work under the Contract is completed and accepted by the TOWN. Certificates and any and all renewals substantiating that required insurance coverage is in effect shall be filed with the TOWN and shall list the TOWN as additional insured for each policy. Since this insurance is normally written on a year-to-year basis, the CONTRACTOR shall notify the TOWN should coverage become unavailable or if its policy should change. Any cancellation of insurance, whether by the insurers or the insured, shall not be valid unless written notice thereof is given by the party proposing cancellation to the other party and to the TOWN at least fifteen days prior to the intended effective date thereof, which date should be expressed in said notice.

d) The CONTRACTOR shall indemnify, defend, and save harmless the TOWN and all of the TOWN'S officers, agents and employees from and against all suits and claims of liability of every name and nature, including costs of defending any action, for or on account of any injuries to persons or damage to property of the TOWN or any person, firm, corporation or association arising out of or resulting from any act, omission, or negligence of the CONTRACTOR, subcontractors and its and their agents or employees in the performance of the work covered by this Agreement and/or failure to comply with terms and conditions of this Agreement. The foregoing provisions shall not be deemed to be released, waived or modified in any respect by reason of any surety or insurance provided by the CONTRACTOR under the Contract.

ARTICLE 10: PERFORMANCE AND PAYMENT BONDS

a) The CONTRACTOR shall furnish a performance bond from a surety company qualified to do business under the laws of the Commonwealth of Massachusetts which is satisfactory to the TOWN for fifty percent (50%) of the Contract price.

b) The CONTRACTOR shall furnish a payment bond from a surety company qualified to do business under the laws of the Commonwealth of Massachusetts which is satisfactory to the TOWN for fifty (50%) of the Contract price for payment of all labor and materials used to carry out the Contract.

ARTICLE 11: SUBCONTRACTING OF WORK

The CONTRACTOR shall not subcontract any of the work that it is required to perform under this Contract to any corporation, entity or person without the prior written approval of the TOWN.

ARTICLE 12: PREVAILING WAGE RATES

The CONTRACTOR shall pay the prevailing wage and comply with Mass. Gen. L. Ch. 149, Sec. 26 - 27D, and a Statement of Compliance shall be included in the Contract Documents. Pursuant to Mass. Gen. L. Ch. 149, Sec. 26 and 27B, the CONTRACTOR shall file weekly certified payroll records with the TOWN for all employees who have worked on the Project. The TOWN and the CONTRACTOR shall preserve said records for a period of not less than three years from the date of completion of the Contract.

ARTICLE 13: OWNERSHIP OF DOCUMENTS

Upon completion of the final payment to the CONTRACTOR, the TOWN shall be the owner of all plans, specifications, electronic data and computations created by the CONTRACTOR that relate to this Agreement. The TOWN agrees that the information contained therein was produced specifically for this Agreement.

ARTICLE 14: MATERIALS AND WORKMANSHIP

Unless otherwise specified, all materials and equipment incorporated in the work under the Contract shall be new. All workmanship shall be first class and by persons qualified in the respective trades.

ARTICLE 15: GUARANTEE OF WORK

(a) Except as otherwise specified, all work shall be guaranteed by the CONTRACTOR against defects resulting from the use of inferior materials, equipment, or workmanship for one year from the date of final completion of the Contract.

(b) If, within any guarantee period, repairs or changes are required in connection with guaranteed work, which in the opinion of the TOWN are rendered necessary as a result of the use of materials, equipment or workmanship which are inferior, defective or not in accordance with the terms of the Contract, the CONTRACTOR shall, promptly upon receipt of notice from the TOWN and at its own expense:

(1)Make goods and services conform to this Agreement;
(2)Make good all damage to the site, or equipment or contents thereof, which, in the opinion of the TOWN, is the result of the use of materials, equipment or workmanship which are inferior, defective, or not in accordance with the terms of the Agreement; and
(3)Make good any work or material, or the equipment or site, which is disturbed in fulfilling any such guarantee.

ARTICLE 16: GOVERNING LAW

The CONTRACTOR shall perform the work required under this Contract in conformity with requirements and standards of the TOWN and all applicable laws of the Commonwealth of Massachusetts, its political subdivisions, and the Federal Government.

This Agreement and performance thereunder are governed by the laws of the Commonwealth of Massachusetts and all other applicable by-laws and administrative rules, regulations and orders.

ARTICLE 17: BINDING AGREEMENT AND ASSIGNMENT OF INTEREST

This Agreement shall be binding upon the TOWN and the CONTRACTOR and the partners, successors, heirs, executors, administrators, assigns and legal representatives of the TOWN and the CONTRACTOR. Neither the TOWN nor the CONTRACTOR shall assign, sublet or transfer any interest in this Agreement without the written consent of each other, and such consent shall not be unreasonably withheld.

ARTICLE 18: LICENSURE AND COMPLIANCE WITH MASSACHUSETTS LAW

By executing this Agreement, CONTRACTOR agrees and certifies that it is licensed to perform the services required by this Agreement, and that it will secure such licensure for so long as it is bound to perform services under this Agreement. Documentation of such licensure shall be attached to this Agreement as part of Exhibit B. CONTRACTOR shall comply with all applicable laws, ordinances, rules or regulations or codes of the State or Town in performing the work embraced by this Agreement. Pursuant to Mass. G. L. c. 62C, Section 49A, the CONTRACTOR certifies under the penalties of perjury that the CONTRACTOR has complied with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting of child support.

The following provisions of state statute apply to the work performed under this agreement, and these provisions supersede any conflicting provision of this agreement: General Laws chapter 30 section 39F; chapter 30 section 39K; chapter 30 section 39M; chapter 30 section 39N; chapter 30 section 39O; chapter 30 section 39P; chapter 30 section 39R; chapter 149 section 34; chapter 149 section 34A; copies of these statutes are attached hereto and the applicable sections are incorporated herein by reference.

Each and every other provision of law or clause required by law to be inserted in this agreement shall be deemed to be inserted herein, and the agreement shall be read and enforced as though it were included herein and any provision contrary to such law or clause shall be deemed null and void. If through mistake or otherwise any such provision is not correctly inserted, then upon application of either party, the agreement shall forthwith be physically amended to make such insertion

ARTICLE 19: CORPORATE CONTRACTOR

The CONTRACTOR shall endorse upon this Agreement (or attach hereto) a Clerk’s Certificate certifying the authority of the party signing this Agreement for the corporation and the existence of such corporation. Such certificate shall be accompanied by a letter or other instrument stating that such authority continues in force and effect as of the date of submission. The certificate and letter will be Exhibit D to this Agreement. This Agreement shall not be enforceable against the TOWN unless and until the CONTRACTOR complies with this section.

IN WITNESS WHEREOF the parties hereto have executed copies of this Agreement the day and year first above written. *

*If a Corporation, attach to each signed copy of this Agreement an attested copy of the vote of the Corporation authorizing the said signing and sealing.

TOWN OF Bridgewater CONTRACTOR: _____________________________ By its:

By: _______________________________________ _____________________________

Title: ______________________________________ Corporate Seal:

Funding Source: XXXX Account: XXXXXXXX

_________________________________________________________________
Laurie Guerrini, Town AccountantNAME, Town Counsel
Dated:Dated:
Approved as to availability of fundsApproved as to Form

CERTIFICATE OF VOTE

(to be filed if Contractor is a Corporation)

I, _______________________________, hereby certify that I am the duly qualified (Secretary of the Corporation) and acting Secretary of ______________________ and I further certify that a meeting of the (Name of Corporation) Directors of said Company, duly called and held on _______________________, at which (Date of Meeting) all Directors were present and voting, the following vote was unanimously passed:

VOTED: To authorize and empower

Anyone acting singly, to execute Forms of General Bid, Contracts or Bonds on behalf of the Corporation.

I further certify that the above vote is still in effect and has not been changed or modified in any respect.

By:________________________________ (Secretary of Corporation) A True Copy:

Attest:_________________________________ (Notary Public)

My Commission Expires:__________________ (Date)

CERTIFICATIONS REQUIRED BY LAW

FOR PUBLIC CONSTRUCTION CONTRACTS

You must COMPLETE and SIGN the following certifications. You must also print, at the bottom of this page, the name of the contractor for whom these certifications are submitted.

TAX COMPLIANCE

Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A(b), I, the undersigned, authorized signatory for the below named contractor, do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts relating to taxes, reporting of employees and contractors, and withholding and remitting child support.

NON-COLLUSION

The undersigned certifies under the penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection the word "person'' shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.

PUBLIC CONTRACTOR DEBARMENT

The undersigned certifies under penalty of perjury that the below named contractor is not presently debarred from doing public construction work in the commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.

OSHA TRAINING

Pursuant to G.L. c. 30, §39S, the Contractor hereby certifies under penalties of perjury as follows:

(1) Contractor is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work;

(2) All employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and they shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and

(3) All employees to be employed in the work subject to this contract have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration.

COMPLETE AND SIGN BELOW:

______________________________________________________________________
Authorized Person’s SignatureDate

Print Name & Title of Signatory

Name of Contractor

00500-1

SECTION 00610

PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS: That we ___________________________ (Name of Contractor) a ___________________________________________ hereinafter called “Principal” and (Corporation, Partnership, Joint Venture or Individual)

______________________________of ______________, State of ______________________ (Surety) (City & State)

_________________________ hereinafter called the "Surety" and licensed by the State Division of Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the City/Town of _______________, Massachusetts, hereinafter called "Owner", in the penal sum of ______________________________________________________ Dollars ($______________________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the Owner, dated the __________ day of _________________, 20___ (the “Construction Contract”), for the construction described as follows: ___________

NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of the Construction Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under the Construction Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise to remain in full force and effect.

PROVIDED, FURTHER, that the Surety’s obligation under this Bond shall arise after (1) the Owner has declared the Principal in default of the Construction Contract or any provision thereof or (2) has declared that the Principal has failed, or is otherwise unable or unwilling, to execute the work consistent with, and in conformance to, the Construction Contract (collectively referred to as a “Contractor Default”). The determination of a Contractor Default shall be made solely by the Owner. The Owner need not terminate the Construction Contract to declare a Contractor Default or to invoke its rights under this Bond.

When the Surety’s obligation under this Bond arises, the Surety, at its sole expense and at the consent and election of the Owner, shall promptly take one of the following steps: (1) arrange for the Principal to perform and complete the work of the Construction Contract: (2) arrange for a contractor other than the Principal to perform and complete the work of the Construction Contract; (3) reimburse the Owner, in a manner and at such time as the Owner shall decide, for all costs and expenses incurred by the Owner in performing and completing the work of the Construction Contract. Surety will keep Owner reasonably informed of the progress, status and results of any investigation of any claim of the Owner.

If the Surety does not proceed as provided in this Bond with due diligence and all deliberate speed, the Surety shall be deemed to be in default of this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner.

After the Surety’s obligation under this Bond arises, the Surety is obligated, to the limit of the amounts of this Bond, for (1) the correction of defective work and completion of the Construction Contract; (2) additional design, professional services, and legal costs, including attorneys’ fees, resulting from the Contractor Default or from the default of the Surety under this Bond; (3) any additional work beyond the Construction Contract made necessary by the Contractor Default or default of the Surety under this Bond; (4) indemnification obligation of the Principal, if any, as provided in the Construction Contract; and (5) liquidated damages as provided in the Construction Contract, or if none are so specified, actual and foreseeable consequential damages resulting from the Contractor Default or default of the Surety under this Bond.

Any proceeding, legal or equitable, under this Bond shall be instituted in any court of competent jurisdiction in the Commonwealth of Massachusetts.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Construction Contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this Bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Construction Contract or to the work or to the specifications.

IN WITNESS WHEREOF, this instrument is executed in _____ ( ) counterparts, each one of which shall be deemed an original, this the __________ day of ____________________, 20___.

ATTEST:

Principal

______________________________ By ______________________________ (Principal Secretary)

(Address-Zip Code)

______________________________ (SEAL)

Witness as to Principal

(Address-Zip Code)

ATTEST:

Surety

______________________________ By ______________________________ (Attorney-in-Fact)

(Address-Zip Code)

______________________________ (SEAL)

Witness as to Surety

(Address-Zip Code)

NOTE: Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners should execute Bond.

00610-3

SECTION 00620

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS: That we ___________________

________________________________ a_____ ______________________________________ (Name of Contractor) (Corporation, Partnership, Joint Venture or Individual) hereinafter called "Principal" and ______________________________ of _________________, (Surety)

State of ________________________ hereinafter called the “Surety” and licensed by the State (City and State)

Division of Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the City/Town of _________________, Massachusetts, hereinafter called…