BUILDING CONDITIONS ASSESSMENT - Bridgewater Public Library FINAL 2 6-26-2025.pdf
PDF 12 MB Posted
- Attached to
- Bridgewater Public Library Window Replacement
- Solicitation number
- BD-26-1249-B610-B610-135540
- Issued by
- Bristol County, Boston City, Massachusetts
About this file
This is a Building Conditions Assessment Report prepared by Drummey Rosane Anderson (DRA) for the Town of Bridgewater, Massachusetts, regarding the Bridgewater Public Library located at 15 South Street, Bridgewater. The assessment was conducted on March 7, 2025, and completed on June 25, 2025, to evaluate the physical condition of the facility for potential future improvements. The original library building was constructed in 1972 with an addition completed in 1995. The assessment encompassed a comprehensive review of exterior and interior architectural conditions, site conditions, and mechanical, electrical, plumbing, fire protection, and structural systems. The design team, led by James Barrett, AIA, ALEP, LEEDBD+C as Principal-in-Charge, included consulting engineers from Griffith & Vary Consulting Engineers and Foley Buhl Roberts & Associates, Inc. The study was organized into four overlapping focus areas: an Executive Study, Exterior Architectural Building Assessment, Interior Architectural Building Assessment, and Site Conditions Assessment.
The assessment identified multiple deficiencies across the facility categorized using a five-tier priority rating system ranging from Priority 1 (Current Critical Condition requiring immediate action within 1–2 years) to Priority 5 (Comment Only/Grandfathered Condition with 15–20 year time horizons). Critical findings include rotted wood trim at the fascia, compromised accessibility features throughout the facility, deteriorated walkways and parking areas with tripping hazards, and water infiltration issues. Probable cost estimates for repairs and improvements are provided as budgetary figures as of Q2 2025 and include Priority 1 items such as wood trim repairs, ADA compliance corrections, and window replacements. The assessment notes that MEP/FP and structural condition assessments are included in the report's appendices, with detailed information provided by the respective consulting engineers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ch 149 Library Window Replacement Bid Package DRAFT RR V3.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGEWATER PUBLIC LIBRARY
Bridgewater, Massachusetts
June 25 , 2025
ARCHITECTURAL ASSESSMENT
MOUNT IMAGE BLEEDS INTO PAGE 3
Bridgewater Public Library | Bridgewater, MA 1.
report index
ACKNOWLEDGEMENTS
INTRODUCTION
EXTERIOR BUILDING ASSESSMENT
Overview
Priority Rating
Exterior Assessment
INTERIOR BUILDING ASSESSMENT
Priority Rating
Existing Building Plans
Interior Assessment
SITE ASSESSMENT
Overview
Site Assessment
OPINION OF PROBABLE COSTS
CONCLUDING THOUGHTS
APPENDICIES
▪ Appendix A – MEP/FP Assessment Information
▪ Appendix B – Structural Assessment Information acknowledgements
ADMINISTRATION
Library Director: Jed Phillips
TOWN OF BRIDGEWATER
Acting Town Manager: Blythe Robinson
Bridgewater Public Library | Bridgewater, MA
DESIGN TEAM
Drummey Rosane Anderson (DRA) also thanks and acknowledges the contributions of its design team.
James Barrett, AIA, ALEP, LEEDBD+C | Principal-in-Charge
Ronald Paolillo, March, Associate AIA | Project Manager, Kenneth Best, AIA, CSI | Library Specialist
We also recognize and acknowledge the contributions of our consulting engineers.
Griffith & Vary Consulting Engineers, MEP/FP
David A. Hipolito Jr.. PE | Principal
Foley Buhl Roberts & Associates, Inc., Structural Engineers
Johnathon D Buhl, PE | Principal
Colleen E. Kohl, PE | Senior Engineer/Manager
3.
SPECIAL THANKS
We are grateful to the Town of Bridgewater and the Bridgewater Public
Library for your hospitality in allowing us access to the library and its site in support of this facility assessment effort.
Bridgewater Public Library | Bridgewater, MA 2.
introduction / purpose statement
PURPOSE STATEMENT
Town of Bridgewater engaged Drummey Rosane Anderson (DRA) to develop abuilding condition assessment of the Bridgewater
Public Library. The original building constructed in 1972 with an addition constructed in 1995, is located at 15 South Street, Bridgewater.
The specific scope of this study included the review and assessment of existing building and its site. The purpose of this study is to better understand the physical conditions of the library with an eye toward the possibility of future.
PROCESS
Our team visited the library site March 7, 2025. The assessment that follows resulted from a process organized into four overlapping study focus areas including this Executive Study, Exterior Architectural Building Assessment, Interior
Architectural Building Assessment, and Site Conditions Assessment. The MEP/FP and Structural conditions assessment are made part of the report’s appendices.
i n t r o d u c t i o n During the informational collecting phase, the design team established a baseline understanding of the existing Bridgewater
Public Library. The team collected a photographic record of library, and have reviewed available documents of the facility.
These elements served as the basis of understanding for our work. DRA and its MEP/FP and structural consultants conducted a documentary site visit, analyzed existing conditions, and developed reports to memorialize this information.
e x t e r i o r a r c h i t e c t u r a l b u i l d i n g c o n d i t i o n a s s e s s m e n t The study team developed photo documentation of exterior conditions and made visual observation of exterior wearing systems, building wall systems, stairs, railings, building fenestration (window and door systems), roofing (shingle and membrane), chimneys, vents, flashing systems, foundation wall condition, gutter systems, rain leaders, fascia, soffit, and wood trim elements.
i n t e r i o r a r c h i t e c t u r a l b u i l d i n g c o n d i t i o n a s s e s s m e n t The study team made visual observation of interior finish systems including ceiling, wall, and flooring systems.
s i t e c o n d i t i o n s a s s e s s m e n t The study team developed photographic survey documentation of site conditions and utilized this information to evaluate the condition of walkways, entrances, parking lot, and plantings.
Bridgewater Public Library | Bridgewater, MA 5.
EXTERIOR
Bridgewater Public Library | Bridgewater, MA 6.
exterior assessment
OVERVIEW
The study team developed photo documentation of exterior conditions and made visual observation of exterior wearing systems, building wall systems, stairs, railings, building fenestration (window and door systems), roofing
(slate and membrane), flashing systems, foundation wall condition, gutter systems, rain leaders, fascia, soffit, and wood trim elements.
BUILDING ELEVATIONS
NORTH ELEVATION SOUTH ELEVATION
EAST ELEVATION
WEST ELEVATION
SITE PLAN | WITH ELEVATION CALLS
C
B
D
A A B
C
D
So u th S tr ee t
N
Bridgewater Public Library | Bridgewater, MA 7.
PRIORITY RATING SYSTEM
Condition of items and systems are listed within this report based on the following parameters:
PRIORITY 1. Current Critical
Condition requires immediate action (1 – 2 years) to:
▪ Correct a cited safety hazard
▪ Stop accelerated deterioration
▪ Return a facility to operation
PRIORITY 2. Potentially Critical
Condition if not corrected soon (2-5 years) may result in:
▪ Intermittent operations
▪ Rapid Deterioration
▪ Potential Safety Hazards
PRIORITY 3. Necessary, Not Yet Critical
Condition time horizon (5-10 years) :
▪ Require appropriate action to preclude predictable deterioration
▪ Require appropriate action to preclude facility downtime
▪ Require appropriate action to preclude damage or higher costs
PRIORITY 4. Recommended
Condition time horizon (10-15 years) :
▪ Represent sensible improvement to existing condition
▪ Not required for most basic function of the facility
▪ Will improve overall usability or reduce long-term maintenance
PRIORITY 5. Comment Only / Grandfathered
Condition time horizon (15-20 years) :
▪ Conditions may be non-code compliant, but grandfathered
▪ Not be required to meet compliance unless they present hazard
▪ Substantial renovation may trigger compliance requirement exterior assessment
Bridgewater Public Library | Bridgewater, MA 8.
ROOFING SYSTEMS
Shingle Roof
The shingle roofing system covering the original building appears to be in good condition upon visual observation. Some normal wear was observed including discoloration at the south and west sides. There is a small section of what appear to be replaced shingles at the south ridge. There is lichen growth in some valleys and roof edges. There are very few chipped shingles at the roof edges, but nothing that should impact the integrity of the roof
Membrane Roof
The membrane roof covers the addition. The membrane roofing system appears to be in good condition. however, appears to be some evidence of patching at the south-west corner of the parapet, but it also appears to remain in good condition. The taped seams are bubbling, but do not appear to be delaminating. This should be checked by a roofing installer. Roof drains appear solid and clear of debris, however one is missing the grate to keep out debris. Walkway pads are beginning to lift at corners, but are otherwise in good
Condition.
Roof Parapets &Facia
The metal roof parapet surrounding the membrane roof appears to be in good condition. There are no signs of damage or system failure.
Ther is a good amount of discoloration that should be cleaned.
Rain Leaders and Stormwater Conveyance
Rain leader and gutter systems appear in good condition. The leader at the northeast corner does not lead far enough away from the building. Other leaders connect to an underground system that should be scoped.
Bridgewater Public Library | Bridgewater, MA 9.
OVERALL ROOF PLAN
PATCHING, SOUTHWEST MEMBRANE ROOF & PARAPET
NORTHEAST RAINWATER LEADER TYPICAL RAINWATER LEADER
EXTERIOR WALL SYSTEMS
Brick Wall Construction
The brick wall construction of the original library appears solid and in good condition. No evidence of spalling, cracking, or deterioration of the masonry was observed. There is a significant amount of efflorescence on the brick portico of the new entrance. This could be indicative of water getting into the wall system. The low brick walls at the entry show significant shifting. This requires a more in-depth evaluation. The mortar joints were found to be in generally good condition. Some deterioration of mortar joints were found at the north elevation where the brick meets the foundation. The expansion joints need to be re-caulked due to cracking and shrinkage.
EIFS Construction
The EIFS construction of the addition were observed as solid and in good condition. Some algae/moss growth has established on the west elevation and should cleaned. The expansion joints where EFIS meets brick need to be re-caulked due to cracking and shrinkage.
Foundation
Although generally in good condition, there are areas with cracks that should be further investigated and repaired. Additionally, there are some areas where the parging has peeled away that should also be repaired. It is our understanding that water infiltration at the north elevation into the pump room due to grading is currently being addressed.
Wood Trim
The wood facia at roofline of the original building are showing rot, cracked panels, and peeling paint at a number of locations. This is a critical repair to avoid further decay and infiltration of water and air into the building. The column enclosures at the east entry have rotted at the base and show the progression of rot up the enclosure along with cracking of the enclosures.
EFFLORESCENCE AT ENTRY FOUNDATION CRACKS & SPALLING
EXPANSION JOINT ROTTED WOOD AT FACIA
Bridgewater Public Library | Bridgewater, MA 10.
Windows Systems
Window systems found in the east façade are wood window systems. The windows are old, but in relatively good condition. Windows and surrounds at this area are showing some decay where they meet the concrete, the glass pane putty needs to be replaced, and the windows need to be repainted. Repair, patching, and filling of the wood material should be undertaken prior to painting preparatory work.
Scraping of loose and flaking paint is required. Perimeter sealant and painting is needed for these surfaces.
Newer vintage windows are located in the north and south
Elevations of the original building. These are thermally insulated double-hung units. Generally speaking, their condition is seen as good, but require painting in the short-term. It is recommended that the be replaced as the sashes are loose and permit wind to enter the interior. It is our understanding that interim steps have been taken to address this, but the windows should be replaced. One pane is broken and needs to be replaced.
The addition has storefront and aluminum double-hung windows that are in good condition. One pane is cracked and needs to be replaced.
Door Systems
The west and south access doors are wood, in fair to good condition and should be prepped and repainted with the windows. There are some signs of rot at the east door.
Main Entry Door
The main entry doors at the addition are automated storefront doors and are in good condition. However, it has been brought to our attention that they do not function properly, sometimes not opening or staying open. Service calls have not revised the issues.
WINDOW UNIT AT MAIN FACADE
WINDOW UNIT DETAIL
WINDOW UNIT AT MAIN FACADE
WINDOW GLAZING DETAIL
SOUTH EGRESS DOOR
MAIN ENTRY DOOR
Bridgewater Public Library | Bridgewater, MA 11.
PUBLIC ENTRANCE SYSTEMS / ACCESSIBILITY
Main Entrance – South Elevation
This entry is level, with no stairs or ramps. The brick pavers appear to be in good condition showing no signs of spalling or frost heaves. The pedestrian path to the entrance will be discussed as part of the site assessment.
Egress - East Elevation
This entrance serves as an exit egress for the first floor.
The handrail is in poor condition and needs painting
Delivery/Egress - West Elevation
This entrance serves as delivery entrance as well as an exit egress for the first floor. The bituminous patch at the door is not sufficient for ADA compliance. The handrail is not ADA compliant, the landing does not appear to be ADA compliant, and the slope and cross-pitch of the ramp need to be verified.
Egress - South Elevation
This entrance serves as an exit egress for the first and second floors. The is a lip at the threshold exterior of the door that could be a tripping hazard. There are no handrails at the stair to provide an accessible pathway.
Basement Service Entry - North Elevation
This entrance serves as an entry to the basement boiler room. The railing at ground level does not meet the correct height for fall protection.
ENTRY | SOUTH ELEVATION
EGRESS | SOUTH ELEVATION
EGRESS | SERVICE | WEST ELEVATION
Bridgewater Public Library | Bridgewater, MA 12.
EGRESS | EAST ELEVATION
EGRESS | SERVICE | WEST ELEVATION
INTERIOR
Bridgewater Public Library | Bridgewater, MA 13
Condition of items and systems are listed within this report based on the following parameters:
PRIORITY 1. Current Critical
Condition requires immediate action (1 – 2 years) to:
▪ Correct a cited safety hazard
▪ Stop accelerated deterioration
▪ Return a facility to operation
PRIORITY 2. Potentially Critical
Condition if not corrected soon (2-5 years) may result in:
▪ Intermittent operations
▪ Rapid Deterioration
▪ Potential Safety Hazards
PRIORITY 3. Necessary, Not Yet Critical
Condition time horizon (5-10 years) :
▪ Require appropriate action to preclude predictable deterioration
▪ Require appropriate action to preclude facility downtime
▪ Require appropriate action to preclude damage or higher costs
PRIORITY 4. Recommended
Condition time horizon (10-15 years) :
▪ Represent sensible improvement to existing condition
▪ Not required for most basic function of the facility
▪ Will improve overall usability or reduce long-term maintenance
PRIORITY 5. Comment Only / Grandfathered
Condition time horizon (15-20 years) :
▪ Conditions may be non-code compliant, but grandfathered
▪ Not be required to meet compliance unless they present hazard
▪ Substantial renovation may trigger compliance requirement interior assessment
Bridgewater Public Library | Bridgewater, MA 14.
MAIN LEVELPLAN UPPER LEVEL PLAN
LOWER LEVEL PLAN
N
S O
U T
H
S
R E
E
Bridgewater Public Library | Bridgewater, MA 15.
ORIGINAL BUILDING
Ceiling System
Acoustical tile lay-in ceiling in good condition although dirty at air vents.
Wall System
Painted drywall in good condition. Patching and repainting recommended.
Flooring System
Low-pile broadloom carpet in fair condition.
Showing wear and some staining.
ADDITION
Ceiling System
Acoustical tile lay-in ceiling in good condition although dirty at air vents.
Wall System
Painted drywall in good condition. Patching and repainting recommended.
Flooring System
Low-pile broadloom carpet in fair condition.
Showing wear and some staining. Carpet in service corridor is in poor condition. Brick pavers and porcelain tile in good condition.
VCT in service corridor in fair condition.
ORIGINAL BUILDING| TYPICAL FINISHES
ADDITION
ORIGINAL
BUILDING
ADDITION | TYPICAL INTERIOR FINISHES
GENERAL COMMENTS
INTERIOR | MAIN LEVEL
Circulation and Information desks appear to be in good condition and meet accessibility requirements. There is some damage to the face of the desk.
Drinking fountain is accessible for wheelchair, but no standing-height fountain is available.
Threshold between carpet and vct in service corridor is missing or taped down. Potential trip hazard.
Online catalog station is not ADA accessible.
Bridgewater Public Library | Bridgewater, MA 16.
Painted drywall at atrium in good condition.
Acoustical tile lay-in ceiling in good condition although dirty at air vents.
Wall System
Painted drywall in good condition. Patching and repainting recommended.
Flooring System
Low-pile broadloom carpet in fair condition.
Showing wear and some staining.
ADDITION
Ceiling System
Acoustical tile lay-in ceiling in good condition although dirty at air vents.
Wall System
Painted drywall in good condition. Patching and repainting recommended.
Flooring System
Low-pile broadloom carpet in fair condition.
Showing wear and some staining.
ORIGINAL BUILDING| TYPICAL FINISHES
ADDITION
ORIGINAL
BUILDING
ADDITION | TYPICAL INTERIOR FINISHES
GENERAL COMMENTS
INTERIOR | UPPER LEVEL
Circulation desk appears to be in good condition and meet accessibility requirements.
Assuming the area at the elevator is an area of refuge, there is no call station.
The railing surrounding the atrium (main stair) does not meet ADA requirement for maximum 4” spacing of pickets and other open areas.
The drywall soffit at the skylight / top of stair is cracking and water stained.
Bridgewater Public Library | Bridgewater, MA 17.
Acoustical tile lay-in ceiling in good condition although dirty at air vents.
Wall System
Painted drywall in good condition. Patching and repainting recommended.
Flooring System
Polished concrete in good condition.
ADDITION
Ceiling System
Acoustical tile lay-in ceiling in good condition although dirty at air vents.
Wall System
Painted drywall in good condition. Patching and repainting recommended.
Flooring System
Polished concrete in good condition.
ORIGINAL BUILDING| TYPICAL FINISHES
ADDITION
ORIGINAL
BUILDING
ADDITION | TYPICAL INTERIOR FINISHES
GENERAL COMMENTS
INTERIOR | LOWER LEVEL
Assuming the area at the elevator is an area of refuge, there is not call station.
Staff lounge sink is not ADA compliant; lacks proper clearance beneath sinks
Bridgewater Public Library | Bridgewater, MA 18.
INTERIOR STAIR
Main Stair
The stair is a metal pan stair. The stair treads are a combination of porcelain tiles with a carpet runner. Intermediate landings are the same. The risers are painted metal with a carpet runner.
Handrails are wood with appropriate extensions at landings. The guardrail is painted metal with a vertical picket configuration. The pickets are spaced wider than the maximum allowed by ADA.
Walls are painted drywall and in good condition.
TYPICAL PUBLIC TOILET ROOM
Bridgewater Public Library | Bridgewater, MA 19.
STAFF TOILET ROOM
TOILET CORES
Public Toilets
The public toilets generally meet ADA requirements. The toilet rooms have ceramic tile flooring, with a PVC wainscot.
The drywall walls above the wainscot are painted. The ceilings are acoustical lay-in tiles. The fixtures are accessible, and the sink areas allows for wheelchair use. The rooms are sized adequately for wheelchair turning radius accommodation. The metal stall partitions are functional but with signs of rust and some loosening from the walls.
In some rooms, the tissue dispenser is beyond the maximum distance from the front rim of the toilet. The pipes are not insulated for burn prevention.
Staff Toilet
The staff toilet on the upper level generally meets ADA requirements. It has ceramic tile flooring and painted drywall walls. The ceilings are acoustical lay-in tiles. The fixtures are accessible, and the sink areas allows for wheelchair use. The rooms are sized adequately for wheelchair turning radius accommodation. , the tissue dispenser is beyond the maximum distance from the front rim of the toilet. The pipes, however, are not insulated for burn prevention. The clearance at the strike-side of the door needs to be confirmed for
ADA compliance. The plastic laminate sink counter is delaminating.
1 3
INTERIOR RAMPS
Both ramps are carpet over wood underlayment and framing. The meets
ADA compliance. The landings at top and bottom are in compliance. The handrails meet ADA requirements for extension height, diameter, and hand clearance between wall and railing. However one railing of the south ramp does not extend beyond the end of the ramp as required.
Bridgewater Public Library | Bridgewater, MA 20.
SOUTH RAMPNORTH RAMP
OTHER AREAS
AND PLANTINGS
Bridgewater Public Library | Bridgewater, MA 21.
COVERED PATIO
The covered patio is a wood-framed structure with a standing-seam metal roof and a concrete pad. There are two metal benches that are anchored to the pad and there are loose chairs and a small table.
The patio and structure are in good condition. There is no accessible path leading to the patio.
PLANTINGS
The site is surrounded by plantings on all sides. Although we are not landscape architects, the appear to be in good condition and possibly in need of trimming and other maintenance. The large tree adjacent to the driveway and
South Street façade appears to be overgrown and should be trimmed away from the building, sidewalk and utility lines. It may also be contributing to the sidewalk heaving. Plantings at the South
Street seating area appear to be in good condition. Adding ground cover to provide year-round plantings could be considered.
Bridgewater Public Library | Bridgewater, MA 22.
LIGHT WELL AT ADDITION
The light well at the addition has concrete walls and pad. It is covered by a wood pergola that is in disrepair and in need of painting. The lightwell collects leaves and other debris and the pad has moss growth.
SITE ASSESSMENT
Bridgewater Public Library | Bridgewater, MA 23.
n
15 SOUTH STREET
BRIDGEWATER PUBLIC LIBRARY
SITE CONDITIONS | PAVED DRIVEWAYS WALKWAYS
AND PARKING
Paved bituminous concrete driveways and parking areas found throughout the library site and are in fair to good condition.
Parking Areas
The on-site library parking area is located to the west of the property, and provides 42 general parking spaces plus three (3) that are designated as handicap parking spaces.
The striping is faded. The pavement is cracking in a number of areas. The bituminous curbs are in disrepair.
There is a central storm drain that appears in good condition, though the surrounding pavement is in disrepair.
There are directional arrows on the paving indicating direction of traffic flow.
Driveways
There are two (2) one-way driveways providing access to the parking area. The entrance drive runs along the southern property line of the library site from South Street.
The exit drive is to the north of the parking area leading to
Church Street. This drive becomes somewhat narrow, as cars park along the side of the drive. The condition of the paving is similar to that of the parking lot. Both are lined with concrete curbing that is in fair condition. There are no markings on the paving indicating the drives are one-way aside from the directional arrows mentioned above.
Parking Area Lighting
Parking area lighting is provided by four double-headed light poles, one at each corner of the area. Some are obstructed by trees, which should be cut back.
Parking – View to West Parking – View to East
Paving & Storm Drain
Bituminous Curbing
DRIVEWAY ENTRANCE FROM SOUTH STREET DRIVEWAY EXIT TO CHURCH STREET
Bridgewater Public Library | Bridgewater, MA 25.
WALKWAYS
Generally speaking, the walkways within the library site are found to be in poor to fair condition.
Walkway –East Walk Paver Seating Area & Steps
The bituminous pedestrian walkway at the east of the site is in fair condition. There are some cracks, but no ADA compliant curb cuts at the driveway entrance. The brick-paver walkway and seating area is in fair condition with some displaced pavers along the curved walkway leading to the seating area. This walkway is sloped and ADA compliance needs to be confirmed.
The concrete steps and landing at the east façade are in fair condition. There is some cracking. The height of the lowest riser at the brick pavers is uneven across its full length. Both the steps and landing have moss growth. The end walls are in poor condition showing spalling, cracks, and moss growth.
BITUMINUOUS WALK & CURB CUT
TYPICAL CRACKS END WALL
Bridgewater Public Library | Bridgewater, MA 26.
Walkway – South Street | Parking | Main Entrance
The pedestrian walkway at the south walk leading to the main entrance from South Street and the parking area is in poor-to-fair condition. In addition to the lack of ADA-compliant curb cuts and sloping, the concrete pads have shifted creating tripping hazards. Bituminous fill has been used to address some of the unevenness of the walkway.
The concrete curb has also moved creating additional tripping hazards. One section of curbing is damaged, exposed the rebar reinforcement which is rusting. The brick pavers extending from the curb to the main entry is in good condition, though some of the pavers are damaged due to the shifting walkway and curbing.
Ramp - Delivery Entrance
The concrete ramp at the delivery entrance is in good condition. The slope and cross-pitch need to be confirmed for ADA compliance. The guard / handrail is not ADA compliant. The bituminous landing at the base of the ramp also needs to be confirmed for ADA compliance.
Bridgewater Public Library | Bridgewater, MA 27.
SIDEWALK – PATCHING AT UNEVEN PADS
SIDEWALK – SLOPE AT PARKING AREA RAMP – SERVICE ENTRANCE
OPINION OF PROBABLE COSTS
Bridgewater Public Library | Bridgewater, MA 29.
Notes
These estimates are budgetary figures as of Q2
2025 and do not represent actual construction costs.
For items requiring a more in-depth analysis that is beyond the scope of this study, we have included estimates of possible costs.
OPINION OF PROBABLE COST
Bridgewater Public Library | Bridgewater, MA 30.
PRIORITY 1. Current Critical
(1 – 2 years)
PRIORITY 2. Potentially
Critical
(2-5 years)
PRIORITY 3. Necessary, Not Yet Critical
(5-10 years)
PRIORITY 4. Recommended
(10-15 years)
PRIORITY 5. Comment
Only / Grandfathered
OPINION OF PROBABLE COST
Notes
These estimates are budgetary figures as of Q2
2025 and do not represent actual construction costs.
For items requiring a more in-depth analysis that is beyond the scope of this study, we have included estimates of possible costs.
Bridgewater Public Library | Bridgewater, MA 31.
(1 – 2 years)
PRIORITY 2. Potentially
Critical
(2-5 years)
PRIORITY 3. Necessary, Not Yet Critical
(5-10 years)
PRIORITY 4. Recommended
(10-15 years)
OPINION OF PROBABLE COST Notes budgetary figures as of Q2
2025 and do not represent actual construction costs.
For items requiring a more in-depth analysis that is beyond the scope of this study, we have included estimates of
Bridgewater Public Library | Bridgewater, MA 32.
(1 – 2 years)
PRIORITY 2. Potentially
Critical
(2-5 years)
PRIORITY 3. Necessary, Not Yet Critical
(5-10 years)
PRIORITY 4. Recommended
(10-15 years)
OPINION OF PROBABLE COST Notes budgetary figures as of Q2
2025 and do not represent actual construction costs.
For items requiring a more in-depth analysis that is beyond the scope of this study, we have included estimates of
Bridgewater Public Library | Bridgewater, MA 33.
(1 – 2 years)
PRIORITY 2. Potentially
Critical
(2-5 years)
PRIORITY 3. Necessary, Not Yet Critical
(5-10 years)
PRIORITY 4. Recommended
(10-15 years)
APPENDICES
APPENDIX - A | MEP/FP ASSESSMENT INFORMATION
APPENDIX - B | STRUCTURAL ASSESSMENT INFORMATION
Bridgewater Public Library | Bridgewater, MA 34.
APPENDIX A
MEP/FP ASSESSMENT INFORMATION
Bridgewater Public Library | Bridgewater, MA 35.
APPENDIX B
STRUCTURAL ASSESSMENT INFORMATION
Bridgewater Public Library | Bridgewater, MA 47.
Drummey Rosane Anderson, Inc. | Howard Clock Building | 260 Charles Street | Waltham, MA 02453 | www.DRAws.com
| report index |
| acknowledgements |
| introduction |
| exterior assessment |
| interior assessment |
| other areas and plantings |
| site assessment |
| opinion of probable costs |
| appendix A MEP/FP |
| appendix B structural |
File details come from the government source that posted it. Updated .