This document is a detailed Statement of Work (SOW) for an unplanned drydock availability for the USCGC SEQUOIA (WLB-225B), a Coast Guard vessel, to be performed in fiscal year 2025. The SOW covers six primary work items: fire prevention requirements, main reduction gear overhaul, drydocking, temporary services, sea trial performance support, and towing services.
The primary scope involves comprehensive repair and maintenance of the vessel's critical systems, including overhauling the main reduction gear, renewing bearings and seals, conducting underwater hull cleaning, performing sea trials, and transporting the vessel between locations. Key technical requirements include detailed procedures for gear disassembly, cleaning, inspection, and reassembly, with specific focus on contamination control, technical representative oversight, and precise documentation of all repair processes. The contractor will be responsible for preparing comprehensive plans, conducting pre-trial conferences, performing dock and sea trials, and ensuring all work meets strict Coast Guard specifications and technical publication guidelines.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC SEQUOIA (WLB 215)
SPECIFICATION FOR UNPLANNED DRYDOCK MAIN REDUCTION GEAR REPAIRS
FY2025
Developed By: Bryan G Wright
(Rev-0, 18 January 2025)
USCGC SEQUOIA (WLB-225B) UNPLANNED DRYDOCK AVAILABILITY FY2025
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. vi Consolidated List of Critical Inspection Items ............................................................................................. ix Principal Characteristics ................................................................................................................................ x General Requirements WORK ITEM 1: Fire Prevention Requirements WORK ITEM 2: Main Reduction Gear, Overhaul WORK ITEM 3: Drydock WORK ITEM 4: Temporary Services, Provide - Cutter WORK ITEM 5: Sea Trial Performance, Support, Provide WORK ITEM 6: Towing Services, Provide iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225B WLB 801-001, Rev A, Lines and Offsets
Coast Guard Drawing 225B WLB 801-003, Rev -, Curves of Forms and Cross Curves of Stability
Coast Guard Drawing 225B WLB 801-006, Rev G, Docking Drawing
Coast Guard Drawing 225-WLB 243-001, Rev B; PROPULSION SHAFTING ARRANGEMENT
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Coast Guard Commandant Instruction (COMDTINST) M16672.2D, Mar 1999, Navigation Rules, International-Inland
Coast Guard Technical Publication (TP) 3523-241-A&B, 225 WLB MIB, VOL 5, SWBS 241, GEAR, REDUCTION, MMC PN 241-01-01
Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary
Services
OTHER REFERENCES
A-A-59323, Rev -; CLOTHS, CLEANING, LOW-LINT, 6/30/99
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
MIL-PRF-9000, Rev H; Lubricating Oil, Shipboard Internal Combustion Engine, High Output Diesel, 9/16/87
Naval Ships' Technical Manual, Chapter 241, Propulsion Reduction Gears, Couplings, Clutches, and
Associated Components v (Rev-0)
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure vi (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
2 N HS pinion bearing, DWG 01070-0353 item
Philadelphia Gear Corporation
P/N: 31000-1017
2 ea. 3,880.00
2 N HS pinion bearing, DWG 01070-0353 item
Philadelphia Gear Corporation
P/N: 31000-1018
2 ea. 1,781.00
2 N HS pinion bearing, DWG 01070-0353 item
Philadelphia Gear Corporation
P/N: 31000-0475
2 ea. 1,438.00
2 N HS pinion bearing, DWG 01070-0353item
Philadelphia Gear Corporation
P/N: 31000-0474
2 ea. 1,129.00
2 N MDE end quill shaft bearing, DWG 01070-
0353 item 15
Philadelphia Gear Corporation
P/N: 31000-1047
2 ea. 1,001.00
2 N PTO CPP bearing, DWG 01070-0353 item
Philadelphia Gear Corporation
P/N: 31000-1780
2 ea. 154.00
2 N ALOP bearing, DWG
01070-0353 item 63
Philadelphia Gear Corporation
P/N: 31000-1780
2 ea. 154.00
2 N LS shaft bearing DWG
01070-0353 Item 33
Philadelphia Gear Corporation
P/N: 31000-1777
1 ea. 13,552.00
2 N LS shaft bearing DWG
01070-0353 Item 59
Philadelphia Gear Corporation
P/N: 31000-1778
1 ea. 6,856.00
2 N Clutch end quill shaft bearing DWG 01070-
0353 Item 27
Philadelphia Gear Corporation
P/N: 31000-1779
2 ea. 198.00
2 N Turning
Gear/Generator Pinion
Bearing DWG 01070-
0353 Item 74
Philadelphia Gear Corporation
P/N: 31000-1795
1 ea. 100,471.00
2 N Turning
Gear/Generator Pinion
Bearing DWG 01070-
0353 Item 75
Philadelphia Gear Corporation
P/N: 31000-1796
1 ea. 616.00
2 N Turning
Gear/Generator Pinion
Bearing DWG 01070-
0353 Item 76
Philadelphia Gear Corporation
P/N: 31000-0224
1 ea. 964.00
2 N Turning
Gear/Generator Pinion
Bearing DWG 01070-
Philadelphia Gear Corporation
P/N: 31000-0223
1 ea. 803.00 vii (Rev-0)
0353 Item 77
2 N Oil Seal Dwg 010170-
0317; 408
P/N: 36000-0409 2 78.00
2 N Plate, Seal Dwg
010170-0317;426
DH1259K-4
P/N: 34000-8834 1 400.00
2 N Oil Seal Dwg 010170-
0317; 431
P/N: 36000-2344 1 29
2 N Gasket Dwg 010170-
0317; 449 DH25K
P/N: 34000-8742 1 11.00
2 N Oil Seal Dwg 010170-
0317; 450
P/N: 36000-1279 1 13.00
2 N Seal, Oil Dwg 010170-
0353; 11
P/N: 36000-0049 4 104.00
2 N Seal, Oil Dwg 010170-
0353; 12
P/N: 36000-2541 2 126.00
2 N Spacer, Oil Dwg
010170-0353; 14
P/N: 50315-9672 2 591.00
2 N Retainer, Seal Dwg
010170-0353; 16
P/N: 50085-3146 2 385.00
2 N Seal, Oil Dwg 010170-
0353; 20
P/N: 36000-2277 2 60.00
2 N Spacer, Seal Dwg
010170-0353; 21
P/N: 50315-9030 2 1,199.00
2 N Seal, Oil Dwg 010170-
0353; 22
P/N: 36000-1752 2 368.00
2 N Spacer, Seal Dwg
010170-0353; 35
P/N: 50315-9031 1 1,185.00
2 N Oil Seal Dwg 010170-
0353; 36
P/N: 3600-1231 2 368.00
2 N Retainer, Seal Dwg
010170-0353; 47
P/N: 50085-3186 1 400
2 N Retainer, Seal Dwg
010170-0353; 49
P/N: 50085-2850 1 400.00
2 N Oil Seal Dwg 010170-
0353; 55
P/N: 36000-1531 2 104
2 N Spacer, Seal Dwg
010170-0353; 56
P/N: 50315-9032 1 934.00
2 N Oil Seal Dwg 010170-
0353; 80
P/N: 36000-0739 2 35.00
2 N Spacer, Seal DWG
010170-0353; 81
P/N: 50315-9033 1 471.00
2 N O-Ring DWG 010170-
0353; 96
P/N: 36000-1760 1 2.00
2 N Gasket DWG 010170-
0353; 98
P/N: 40225-0562 2 29.00
2 N Seal DWG 010170-
0353; 307
P/N: 36000-0030 1 40.00
2 N Seal DWG 010170- P/N: 50085-2865 1 330.00 viii (Rev-0)
0353; 311
2 N Gasket DWG 010170-
0109; 609
P/N: 36000-1788 3 30.00
2 N Gasket DWG 010170-
0131; 277
P/N: 36000-1957 3 33.00
2 N Gasket DWG 010170-
0131; 516
P/N: 36000-1786 4 25.00
2 N DWG 010170-0131;
P/N: 36000-1958 2 45.00
2 N Gasket DWG 010170-
0131; 546
P/N: 36000-2662 1 25.00
2 N Gasket DWG 010170-
0131; 556
P/N: 36000-1787 1 25.00
2 N Gasket DWG 010170-
0131; 565
P/N: 36000-1788 1 30.00
2 N Gasket DWG 010170-
0131; 501
P/N: 36000-1956 6 167.00
2 N Set of 12 Pads (shoes) for Thrust Bearing
Philadelphia Gear Corporation
P/N: 000010188000
1 9,986.00
2 N Complete Turning
Gear
Philadelphia Gear Drawing:
01070-0353
1 30,000.00
3 Y *Transducer Cover
Plate
N/A 4 ea. 50.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C5I Service Center ix (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
3 Drydock x (Rev-0)
PRINCIPAL CHARACTERISTICS
225' WLB (B-CLASS)
PHYSICAL
Length overall 225' 0"
Length between perpendiculars 206' 0"
Maximum beam 46'
Designed draft 13' 0"
Full load displacement 1905.6 Long Tons SW
Light ship displacement 1500.7 Long Tons SW
Minimum operating displacement 1869.2 Long Tons SW
Mast height (above 12' waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79
Frame spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction
Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of propellers 1
Number of blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW
Emergency diesel generator One Caterpillar 3406 DITA, 280 KW
Shore tie Two 450 VAC, 400 Amp, 3-wire
Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL
Shaft bearing, aft Water Lubricated Cutlass Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-0)
00000_0824_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirement in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire
Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety
Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast
Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
3 (Rev-0)
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with
NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Weldox 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
4 (Rev-0)
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is small quantity conditionally exempt.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’
Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
5 (Rev-0)
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
7 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
8 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading
(mils)
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Rev-0)
4.2 Tank and Void Assessment form.
13 (Rev-0)
14 (Rev-0)
55500_ACC_0323_IBCT
WORK ITEM 1: Fire Prevention Requirements
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to minimize shipboard fire risk and to clarify the Contractors’ role in fire prevention and response.
NOTE
This work item is not separately priced. Factor fire prevention and response costs into bid of affected work items.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 Fire Plan. The Contractor must develop and implement a written fire plan in accordance SFLC Std
Spec 5550. The Contractors Fire Plan must address Fire Protection and Response specifics as required in this Work Item.
3.1.1 The availability’s specific Fire Plan must always address the following:
• material condition and fire protection boundary obstruction mitigations
• inoperable fittings log
15 (Rev-0)
• fire alarms
• firefighting equipment disposition
3.1.2 The Fire Plan must also address the following:
• fire protection system status
• communication links
• temporary services
• power disconnects
• fire prevention and safety inspections
3.2 Fire Prevention Responsible Party. The Contractor must appoint a Fire Prevention Responsible Party
(FPRP) who acts as the Contractor’s Responsible Person for fire prevention concerns during the entire availability.
3.3 Fire Prevention and Response Conference. The Contractor must participate in the Fire Prevention and
Response Conference as required in Std Spec 5550, paragraph 3.12. The participants must address the contents of SFLC Std Spec 5550, paragraph 3.12.1, as applicable.
3.4 Fire Responsibility Familiarization Tour and Initial Inspection. The Contractor must participate in the
Fire Responsibility Familiarization Tour and Initial Inspection as required in Std Spec 5550, paragraphs
3.12.2 through 3.12.4.
3.5 Material Condition and Fire Protection Boundary Obstruction Mitigation Requirements. The
Contractor must conform to all material condition and fire protection boundary obstruction mitigation requirements detailed in SFLC Std Spec 5550, paragraph 3.2.
3.6 Inoperable Fittings Log Requirements. The Contractor must conform to all inoperable fittings log requirements detailed in SFLC Std Spec 5550, paragraph 3.3.
3.7 Fire Prevention Service Particulars. The Contractor must conform to the below listed fire prevention service requirements, in accordance with SFLC Std Spec 5550.
TABLE 1 – FIRE PREVENTION SERVICE SELECTION
*SUB-
PARAGRAPH
TITLE
Y/N
3.4 Fire prevention system status Y
3.4.1 Temporary firefighting system proposal Y
3.4.2 Emergent firefighting system inoperability approval and notification
Y
3.4.3 “Disabled equipment” signage for disabled initial responder equipment
Y
3.4.4 Firefighting system inoperability allowance for removed hazards Y
3.4.5 Maintain sprinkling zone operability Y
3.4.6 including all subparagaphs Hazard mitigation for maintenance of fixed extinguishing systems
Y
3.4.7 Procedure implementation for enabling/disabling fire suppression systems
Y
16 (Rev-0)
*SUB-
PARAGRAPH
TITLE
Y/N
3.4.8 Portable water pumping requirement for vessels w/o installed capability
Y
3.4.9 Limitations on operation of major machinery while firefighting systems are offline
Y
3.4.10 Liquid fuel pumping requirement for operational permanent or temporary firefighting systems
Y
3.4.11 Mechanical AFFF equipment must be available to initial responders in compartments with risk of flammable/combustible liquid spillage
Y
3.4.12 including all subparagraphs
Portable fire extinguisher requirements Y
3.4.13 Hose and reel protection Y
3.4.14 including all subparagraphs
Drydock firefighting requirements Y
3.4.15 Fire protection system status in Fire Plan Y
3.5 Fire response related communication links in Fire Plan Y
3.6 Fire response related temporary services in Fire Plan Y
3.6.1 Minimize downtime of fixed extinguishing systems Y
3.6.2 through 3.6.10 Firemain and related equipment requirements Y
3.6.11 Permanent lighting requirements Y
3.6.12 including all subparagraphs
Temporary lighting requirements Y
3.6.13 Electrical power, firefighting water, and lighting source location and testing identified in Fire Plan
Y
3.7 including all subparagraphs
Fire alarm requirements Y
3.8 Shore power manual disconnect locations identified in Fire Plan Y
3.9 Other power manual disconnect locations identified in the Fire Plan N
3.10 including subparagraph
Vessel firefighting equipment placement and disposition info in
Fire Plan
Y
3.11 Fire prevention and safety inspections in Fire Plan Y
3.11.1 Initial and daily inspection requirements N
3.11.2 Additional details in fire inspection reports N
*Each sub-paragraph number relates directly to the identical sub-paragraph number in SFLC Std Spec 5550.
3.5 Extended fire prevention services. If the performance period of the contract is extended by the KO, the contractor must continue to provide all fire prevention services as specified herein for the extension period.
4. NOTES
This section is not applicable to this work item.
17 (Rev-0)
24102_JPH_0520_225
WORK ITEM 2: Main Reduction Gear, Overhaul
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew worn or end of life internal components of the Main Reduction Gear (MRG). All seals and bearings must be renewed and thrust bearing fully inspected. The entire reduction gear will be drained, cleaned, flushed, and restored so that the system is fully operational upon the completion of the repair. Reduction gear is a Philadelphia
Gear Model # 96DHCMG-CP.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N HS pinion bearing, DWG
01070-0353 item 04
Philadelphia Gear Corporation P/N
31000-1017
2 ea. 3880
N HS pinion bearing, DWG
01070-0353 item 05
Philadelphia Gear Corporation P/N
31000-1018
2 ea. 1781
N HS pinion bearing, DWG
01070-0353 item 06
Philadelphia Gear Corporation P/N
31000-0475
2 ea. 1438
N HS pinion bearing, DWG
01070-0353item 07
Philadelphia Gear Corporation P/N
31000-0474
2 ea. 1129
N MDE end quill shaft bearing, DWG 01070-0353 item 15
Philadelphia Gear Corporation P/N
31000-1047
2 ea. 1001
N PTO CPP bearing, DWG
01070-0353 item 63
Philadelphia Gear Corporation P/N
31000-1780
2 154
N ALOP bearing, DWG 01070-
0353 item 63
Philadelphia Gear Corporation P/N
31000-1780
2 154
N LS shaft bearing DWG
01070-0353 Item 33
Philadelphia Gear Corporation P/N
31000-1777
1 13552
N LS shaft bearing DWG
01070-0353 Item 59
Philadelphia Gear Corporation P/N
31000-1778
1 6856
N Clutch end quill shaft bearing
DWG 01070-0353 Item 27
Philadelphia Gear Corporation P/N
31000-1779
2 198
N Turning Gear/Generator
Pinion Bearing DWG 01070-
0353 Item 74
Philadelphia Gear Corporation P/N
31000-1795
1 1471
N Turning Gear/Generator
Pinion Bearing DWG 01070-
0353 Item 75
Philadelphia Gear Corporation P/N
31000-1796
1 616
N Turning Gear/Generator
Pinion Bearing DWG 01070-
0353 Item 76
Philadelphia Gear Corporation P/N
31000-0224
1 964
N Turning Gear/Generator
Pinion Bearing DWG 01070-
0353 Item 77
Philadelphia Gear Corporation P/N
31000-0223
1 803
18 (Rev-0)
N Oil Seal Dwg 010170-0317;
P/N 36000-0409 2 78
N Plate, Seal Dwg 010170-
0317;426 DH1259K-4
P/N 34000-8834 1 400
N Oil Seal Dwg 010170-0317;
P/N 36000-2344 1 29
N Gasket Dwg 010170-0317;
449 DH25K
P/N 34000-8742 1 11
N Oil Seal Dwg 010170-0317;
P/N 36000-1279 1 13
N Seal, Oil Dwg 010170-0353;
P/N 36000-0049
(ensure these received seals are metallic version and not the hard plastic version that do not fit)
4 104
N Seal, Oil Dwg 010170-0353;
P/N 36000-2541 2 126
N Spacer, Oil Dwg 010170-
0353; 14
P/N 50315-9672 2 591
N Retainer, Seal Dwg 010170-
0353; 16
P/N 50085-3146 2 385
N Seal, Oil Dwg 010170-0353;
P/N 36000-2277 4 60
N Spacer, Seal Dwg 010170-
0353; 21
P/N 50315-9030 2 1199
N Seal, Oil Dwg 010170-0353;
P/N 36000-1752 4 368
N Spacer, Seal Dwg 010170-
0353; 35
P/N 50315-9031 1 1185
N Oil Seal Dwg 010170-0353;
P/N 3600-1231 2 368
N Retainer, Seal Dwg 010170-
0353; 47
P/N 50085-3186 1 400
N Retainer, Seal Dwg 010170-
0353; 49
P/N 50085-2850 1 400
N Oil Seal Dwg 010170-0353;
P/N 36000-1531 2 104
N Spacer, Seal Dwg 010170-
0353; 56
P/N 50315-9032 1 934
N Oil Seal Dwg 010170-0353;
P/N 36000-0739 2 35
N Spacer, Seal DWG 010170-
0353; 81
P/N 50315-9033 1 471
N O-Ring DWG 010170-0353;
P/N 36000-1760 1 2
N Gasket DWG 010170-0353;
P/N 40225-0562 2 29
N Seal DWG 010170-0353;
P/N 36000-0030 1 40
N Seal DWG 010170-0353;
P/N 50085-2865 1 330
N Gasket DWG 010170-0109;
P/N 36000-1788 3 30
19 (Rev-0)
N Gasket DWG 010170-0131;
P/N 36000-1957 3 33
N Gasket DWG 010170-0131;
P/N 36000-1786 4 25
N DWG 010170-0131; 534 P/N 36000-1958 2 45
N Gasket DWG 010170-0131;
P/N 36000-2662 1 25
N Gasket DWG 010170-0131;
P/N 36000-1787 1 25
N Gasket DWG 010170-0131;
P/N 36000-1788 1 30
N Gasket DWG 010170-0131;
P/N 36000-1956 6 167
N Set of 12 Pads (shoes) for
Thrust Bearing
Philadelphia Gear Corporation P/N
000010188000
1 9,986
N Complete Turning Gear Philadelphia Gear Drawing 01070-
0353 (NIIN:01-F19-5931)
1 30,000
N Power Take Off Assembly including carbon fiber shaft and both end flex couplings.
01-493-7317 1 63,254
N Entire Bulkhead Seal H74265-01 1 30,000
N Generator Pinion and Shaft P/N 50425-2823
(NIIN 01-F20-5955)
1 54,673
N Generator Shaft’s Coupling end
P/N 50425-2823
(NIIN 01-F20-5955)
1 12,903
*Government-loaned property, which must be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225-WLB 243-001, Rev B; PROPULSION SHAFTING
ARRANGEMENT
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3523-241-A&B, 225 WLB MIB, VOL 5, SWBS 241, GEAR, REDUCTION, MMC PN 241-01-01
Coast Guard Technical Publication (TP) 3524, Jan 1997, Manufacturer's Instruction Book-SWBS
Group(s) 244A Propulsion Shafting and Bearings (AKA TP: IB-H2-0002-V0)
Coast Guard Technical Publication (TP) 3524, Jan 1997, Manufacturer's Instruction Book-SWBS
Group(s) 243A Seal – Forward Stern Shaft & Bulkhead (AKA TP: IB-H2-0001-V0)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures
20 (Rev-0)
OTHER REFERENCES
A-A-59323, Rev -; CLOTHS, CLEANING, LOW-LINT, 6/30/99
MIL-PRF-9000, Rev H; Lubricating Oil, Shipboard Internal Combustion Engine, High Output
Diesel, 9/16/87
Naval Ships' Technical Manual, Chapter 241, Propulsion Reduction Gears, Couplings, Clutches, and Associated Components
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep 1. The Contractor must provide the services of an OEM authorized/ licensed Tech Rep for the Philadelphia Gear Corporation to accomplish the following on site:
• Provide manufacturer's proprietary system/ equipment information, software, and tools.
• Assist with and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
Tech Rep 2. The Contractor must provide the services of a qualified Tech Rep, who is familiar with the
Wartsila main inboard shaft seal and the bulkhead seal equipment, to do the following, on site:
• Advise on manufacturer's proprietary information pertinent to the system.
• Assist with proper repair methods and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
• Ensure compliance with manufacturer's procedures and standards during disassembly, inspection, and reassembly of the shaft seals.
Tech Rep 3. The Contractor must provide the services of a Qualified Technical Representative who is familiar with the Cooper Split Roller Bearing, to accomplish the following on site:
• Advise on manufacturer's proprietary system information. The line shaft bearing is a 19-1/4” diameter Cooper Split Roller Bearing.
• Assist with and ensure compliance with manufacturer's procedures and standards during inspection and reassembly of the Cooper bearing.
• Technical Representative must be present for the inspection and reassembly of the Cooper bearing.
Tech Rep 4 . The Contractor must provide the services of an OEM authorized/ licensed Tech Rep for the
Rolls Royce CPP System to accomplish the following on site:
• Provide manufacturer's proprietary system/ equipment information, software, and tools.
• Assist with and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the
21 (Rev-0) equipment/system.
3.1.2.1 When required, ensure the Tech Rep is an OEM Certified Representative for the system/equipment stated above and demonstrated on their résumé.
3.1.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.
3.1.2.3 Submit a copy of the Tech Rep’s résumé and a list of references to the to the COR at the Arrival
Conference.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.1.5 Other general information.
3.1.5.1 The concerned work area is MMR, Main Reduction Gear 96DHCMG-CP Philadelphia Gear
Corporation. Refer to CG Tech Pub 3523-241 for arrangement and details.
3.1.5.2 At the end of each working day and during periods when the work on the reduction gear and thrust bearing has ceased, the reduction gear, thrust bearing and open piping must be wrapped with plastic sheeting and taped closed to exclude dirt and moisture.
3.1.5.3 All disconnected lube oil piping and hoses must be blanked or capped immediately after opening to prevent dirt or foreign particle intrusion.
3.1.5.4 All parts (including piping, hoses, fittings etc.) must be thoroughly cleaned prior to reassembly of the reduction gear.
3.1.5.5 Conduct all hotwork in accordance with SFLC Std Spec 0740.
3.2 Reduction Gear security, production precautions, and contamination control.
3.2.1 The Contractor must propose, implement, and employ effective physical security and contamination control measures concurrent with opening, inspecting, and repairing reduction gears.
3.2.2 Entry into the red gear and thrust bearing or the lubrication system must be made only with the knowledge and approval of the cutter's Engineer Officer or his designated representative and only after written concurrence with contractor's procedures and methods used to exclude contamination.
3.2.3 Plug, cap, cover, or erect barriers as necessary to preclude dirt contamination and foreign object damage, as each part of the reduction gear and thrust bearing system is disconnected or otherwise disturbed to facilitate inspection. Coordinate and sequence work to prevent conflicting operations that may result in loose materials and tools being used over an open gear. Coordinate and sequence work to eliminate dust, debris, and dirt-generating processes like grinding, sanding, slag chipping, while any part of the gear box is open for inspection or repair.
22 (Rev-0)
3.2.4 Only workers with clean clothing and tools will be permitted to work around the reduction gear's open case. Worker's pockets must be empty, and all jewelry, watches, and loose personal effects must be removed, to prevent items from inadvertently falling into the gear casing.
3.2.5 All tools must be safeguarded from dropping into the open reduction gear case by securing with lanyards attached to a fixture or the worker.
3.2.6 No material, tools, parts, must be placed or stored on any catwalks, staging, ledges or any other location above the level of the open reduction gear casing within a ten foot radius.
3.2.7 All lifting equipment; chain blocks, rope, nylon slings, wire rope slings, and any other equipment must be washed clean prior to use to prevent dirt or paint chips from falling into the open reduction gear casing.
3.2.8 All disconnected lube oil piping must be blanked immediately after opening to prevent dirt or foreign particle intrusion.
3.2.8.1 Some MDE exhaust piping is removed for interference. Blank off the resulting opening that leads to turbocharger to prevent dirt or foreign particle intrusion into the turbocharger.
3.2.9 All parts must be thoroughly cleaned prior to reassembly of the reduction gear.
3.2.10 Observe and implement all the precautions detailed in CG Tech Pub 3253, for opening and protecting parts, equipment, and personnel. Note in particular the following:
3.2.10.1 Avoid damage to all joint surfaces. Prevent the forming of burrs or ridges that will result in oil leakage. Protect joint flanges with clean canvas and wooden blanks or sturdy plastic wrap.
3.2.10.2 Mark or tag parts to aid in correct reassembly. Place these parts in clean containers for temporary storage. Match mark parts as necessary where indexed relationships between parts exist for proper fit or operation of the equipment.
3.2.10.3 Treat thermometers and sight flow indicators, when removed, with care and blank exposed pipe and flange ends to prevent contamination. Sections of oil supply and drain piping should be removed from the-immediate area to prevent damage, bending or other casualty which may hinder proper reassembly.
3.2.10.4 Protect all pipe openings with clean, canvas covered tapered wooden plugs, caps , or bolted blanks. Do not use rags or waste for this application.
3.2.10.5 Covers, end covers and other portions of the housing, when removed, must be placed and supported to fully protect the flange joints. Support heavy parts on wooden blocks or inverted, whichever is easier and allows the better protection in the available space. Pinions and gears, if removed should be supported on clean wooden blocks and must be covered with clean canvas.
NOTE
Contractor may request to suspend some components from the overhead, either short term or long term. Those request (suspending parts) must be agreed to by USCG.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .