This document is a Scope of Work (SOW) for the CGC OBION Mooring Debris Removal project for the United States Coast Guard Site Support Detachment in Owensboro, Kentucky. The primary objective is to remove driftwood and debris from around mooring dolphins, upper pilings, and the mooring dock of the Coast Guard property. Specific requirements include completing all work from a barge on the river, with drift wood either pushed downstream or loaded onto a barge for disposal, and maintaining minimal interference with facility operations during normal working hours of 8:00am to 3:00pm Monday through Friday.

The contractor must adhere to strict safety regulations, including conforming to OSHA Safety and Health Standards, providing a written safety plan, and immediately reporting any work-related accidents. Additional requirements include notifying the Coast Guard one week prior to starting work, wearing company identification, and following specific base regulations such as respecting daily flag ceremonies, maintaining a clean construction site, observing a 10 mph speed limit, and prohibiting firearms and foreign nationals on the premises. The project involves detailed site-specific guidelines, including utility verification, waste disposal protocols, and comprehensive safety and operational procedures.

View the file

Other files

File Type Posted
Attachment A.pdf PDF
Attachment B.pdf PDF
70Z02925QNEWO0027_0_US.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

USCG SSD Owensboro, KY

3301 East 4th street

Owensboro, KY 42303

Scope of Work

FOR

CGC OBION Mooring Debris Removal

1: SCOPE OF WORK: Contractor shall provide all labor, materials, and equipment necessary to complete the following:

A. Remove all drift wood and debris from around mooring dolphins, upper pilings, and mooring dock of the Coast Guard property in Owensboro, KY, homeport of the CGC

OBION

B. Drift wood removed from pilings and mooring may be pushed free from lodged area to float down river. Drift wood that is on the river bank may remain, or be loaded on to barge for disposal.

C. All work shall be completed from a barge on the river.

2. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 8:00am to 3:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative.

3. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work.

4. Coast Guard Contracting Officers Representative: Contact MKC Corey Walters

(corey.a.walters@uscg.mil; (252) 688-8432 to coordinate all activities onboard Coast Guard

Facilities.

5. Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of in contractor provided dumpsters

6: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and

Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.

7. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the

Contracting Officer or his/her representative may accept work performed by the contractor.

8. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense.

9. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification.

10. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.

11: Regulations while onboard Coast Guard Site Support Detachment (SSD) Owensboro:

A. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flag pole

& maintain silence and all vehicles & equipment will halt during these brief events.

B. The construction site shall be maintained in a clean condition at all times. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate.

C. Traffic Regulations:

D. 10 mph speed limit

E. No use of cell phones is permitted while driving vehicles or operating heavy machinery

F. All personnel shall obey all marked traffic signals including stop signs & stop lights.

G. Absolutely no firearms or weapons of any kind are allowed onboard Base SSD

Owensboro.

H. Only American citizens and permanent resident aliens are allowed onboard SSD

Owensboro Facilities. Absolutely no foreign nationals are permitted on the premises.

I. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, sewage or lighting outages.

J. The contractor shall provide a consolidated list of all contracted personnel including their drivers license numbers (or other valid gov’t issued ID number) who will be working on

Base SSD Owensboro Facilities either the day of or prior to the notice to proceed date.

K. Contractors are welcome to utilize the restrooms on the 1st decks of SSD Buildings providing they are clean and do not track mud, dirt or any other debris into the restrooms.

L. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work.

M. No personnel other than the contracting officer has the authority to alter the terms of any contract or to issue any change orders.

N. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractors is subject to orders to evacuate the property at any time.

12. Reference Drawings

A. USCG Drwg M2360-D (Sheet 1 - 3)

REFERENCE PHOTOS

Fig 1 – Debris Upriver of Pier (Mar 2025)

Fig 2 – Looking Upriver from Pier (Mar 2025)

Fig 3 – Looking Upriver from Floating Mooring

Fig 4 – View of Upriver Edge of Floating Mooring

DRAWINGS FOR REFERENCE ONLY

Note: Log Boom is Inoperable

CGC OBION Mooring Debris Removal SOW Package_01Apr2025.pdf
CGC OBION Mooring Debris Removal SOW_01Apr2025
CGC OBION Mooring Debris Removal SOW_03Apr
CGC OBION Mooring Debris Removal SOW Package_01Apr2025
Reference Drawings - SSD Owensboro (PSN 5644376)
COVER SHEET