CGC Healy Bow Crane SOW.pdf

PDF 689 KB Posted

Attached to
USCGC HEALY - BOW CRANE HYDRAULIC CYLINDER REPLACEMENT
Solicitation number
70Z08526Q0026635
Issued by

About this file

This Statement of Work (SOW) specifies technical services for replacing a leaking hydraulic cylinder on the bow crane of USCGC Healy (WAGB-20), a United States Coast Guard cutter. The bow crane is critical for onload operations and deploying the brow for on-ice operations. The contractor shall provide all labor, rigging equipment, and consumable materials to remove the existing leaking hydraulic actuating linear cylinder and install a Government Furnished Equipment (GFE) replacement cylinder (P/N: 41984, NIIN: 014601128). The cylinder leak presents a drip rate of 5 drips per second while energized, rendering the crane out of commission. The work location is the forecastle bow crane area at USCG Base Seattle, 1519 Alaskan Way S., Seattle, WA 98134, with a performance period from 3 August through 14 August 2026.

The contractor's primary tasks include: providing protective coverings to prevent contamination of non-affected surfaces; handling all interferences per SFLC Standard Specification 0000; providing 15-25 gallons of matching marine hydraulic fluid and disposing of removed fluids in accordance with Federal, state, and local regulations; safely supporting the existing cylinder during extraction; disconnecting and capping hydraulic hoses; removing the leaking cylinder; inspecting and cleaning mounting bores; installing the new GFE cylinder with marine-grade anti-seize compound; reconnecting hydraulic lines with new O-rings/seals; systematically bleeding air from the system; conducting no-load operational testing and weight testing (7,400 lbs winch brake/modified static, 7,400 lbs dynamic, 6,720 lbs rated); ensuring zero visible leakage; installing weight testing label plates and petroleum wax tape for hose fitting weatherization; performing touch-up preservation on disturbed surfaces per SFLC Standard Specification 6310; and conducting post-repair operational testing with Coast Guard Inspector verification. The contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide valid REAL ID Act-compliant identification for base access. A site visit is encouraged but not mandatory.

View the file

Other files

File Type Posted
Wage and Determinations Seattle WA.pdf PDF
FAR CLAUSES FOR SERVICES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

USCGC HEALY (WAGB-20)

TECHNICAL SERVICES FOR BOW CRANE HYDRAULIC CYLINDER REPLACEMENT

1. Objective. The objective of this Statement of Work (SOW) is to provide all labor, rigging equipment, and consumable materials necessary to remove a leaking hydraulic actuating linear cylinder and install a newly provided Government Furnished Equipment (GFE) cylinder on the United States Coast Guard Cutter (USCGC) Healy’s Bow Crane. This is a critical system used for onloads and deploying the brow for on-ice operations.

2. References. For any listed references to be distributed, the contractor must be registered in the Joint Certification Program (JCP) through Defense Logistics Agency (DLA) and provide your JCP number to the listed point of contact for this work.

2.1. Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), General

Requirements

2.2. Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Welding and Allied Processes

2.3. Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Requirements for Preservation of Ship Structures

3. Background. During operational testing, the bow crane presented a leak on the hydraulic ram with a drip rate of 5 drips per second while the system was energized, rendering the crane Out of Commission (OOC). Ship's Force, in consultation with Port Engineer (PE) staff, determined the most expeditious repair is the complete replacement of the cylinder assembly.

The Government will provide the replacement cylinder.

4. Tasks. The contractor shall provide material and labor services to replace the bow crane cylinder, which includes the following:

4.1. Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

4.2. Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

4.3. Fluid handling. The Contractor shall provide required matching marine hydraulic fluid to replenish any fluid lost during the cylinder replacement (estimate 15-25 gallons). The contractor shall dispose of removed fluids and any contaminated materials in accordance with all applicable Federal, state, and local regulations.

4.4. Work location and extent. The concerned work areas are shown in the Table 1 below. See the Coast Guard Drawing(s) above, for guidance and details.

PIPING LOCATION SYSTEM DESCRIPTION

Forecastle, Bow Crane Crane Hydraulic

System

Replacement of one (1) main lifting hydraulic cylinder assembly

(P/N: 41984).

4.5. Cylinder Replacement. The Contractor shall perform the following work:

4.5.1. Provide necessary crane/rigging support to safely bear the weight of the existing hydraulic ram during extraction.

4.5.2. Disconnect existing hydraulic hoses and immediately plug and cap all lines to prevent environmental contamination and system ingress.

4.5.3. Drive out mounting pins and remove the leaking cylinder. Turn over the removed cylinder to the ship's Supply Department.

4.5.4. Clean and inspect the upper and lower pin mounting bores on the crane structure for scoring or damage.

4.5.5. Rig, hoist, and install the new GFE Cylinder Assembly (P/N: 41984) into position.

Install mounting pins using appropriate marine-grade anti-seize compound.

4.5.6. Reconnect hydraulic lines using new contractor-provided O-rings/seals.

4.5.7. Systematically bleed all air from the newly installed cylinder and associated lines.

4.5.8. Testing. After all work has been completed, the Contractor shall, in the presence of the

Coast Guard Inspector, accomplish the following tasks, and submit a CFR:

4.5.8.1. After completion of all other work, in the presence of the Coast Guard Inspector the Contractor must conduct a No-load Operational Test followed by a winch brake/modified static, Dynamic and Rated Weight Test per Table 1 in accordance with SFLC Std Spec 5000 Appendix B, paragraph B2.4. Submit CFR of test results.

TABLE 1 – WEIGHT TEST

Main Hoist Test Weights Winch Brake/Modified Static 7,400 lbs Dynamic 7,400 lbs Rated 6,720 lbs

4.5.8.2. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies.

4.5.9. Install a weight testing label plate in accordance with paragraph B2.9 (Label plates) of appendix B of SFLC Std Spec 5000.

4.5.10. Install petroleum wax tape for hose fitting weatherization per SFLC Std Spec 5000

C2.2.1.2.2.

4.6. Restoration. The Contractor shall perform the following work:

4.6.1. Touch-up preservation. The Contractor shall prepare, and touch-up coat all disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310.

4.6.2. Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.

5. Government Furnished Property. The Government will furnish and provide the following to the contractor under this requirement:

5.1. Qty 1, CYLINDER ASSEMBLY, P/N: 41984, NIIN: 014601128

6. Security Requirement. Access to government facilities is required. Contractors shall have a valid government issued ID (or driver’s license) and show identification at the security gate. Contractor must provide full name, date of birth, and driver’s license #. Only REAL ID Act compliant driver’s licenses and ID cards are authorized for base access. For security processing, USCG recommends contractors with U.S. citizenship. Upon request, USCG members can escort contractors on and off the facility.

7. Place of Performance. USCGC Healy at USCG Base Seattle. Address: 1519 Alaskan Way S. Seattle, WA, 98134

8. Period of Performance. 3 Aug – 14 August 2026

9. Technical Points of Contact.

9.1. USCG-SFLC-LREPL, Asset Manager: LTJG Igor Guerrero

9.2. USCGC Healy, Engineer Officer: LCDR Trey Thunborg

10. Notes.

10.1. Site visit is encouraged but not mandatory in order to be familiar with base layout and ship’s layout.