This file consists of electrical specifications for Crystal River Airport's Runway 9-27 improvements project in Crystal River, Florida, issued by Citrus County. The specifications detail the installation of Runway End Identifier Lights (REILs) and associated electrical infrastructure, including concrete foundations, wiring, conduit, transformers, grounding systems, and lamps. The work scope encompasses furnishing and installing support structures, cable connections, ground rods with grounding connections, testing, and all incidentals necessary to place each REIL in operation. Equipment and materials must comply with Federal Aviation Administration (FAA) specifications and certifications under Advisory Circular (AC) 150/5345-53D. The specifications reference multiple industry standards including ASTM requirements for materials, testing, and installation procedures. Payment is structured per installed REIL, with separate line items for replacing Runway 9 REILs and Runway 27 REILs with new foundations, both measured and paid on a per-unit basis.
The specifications establish comprehensive requirements for materials, construction methods, and quality assurance applicable to both the REIL installation (Item L-849) and concrete foundation work (Item P-610). Concrete must achieve 4000 psi compressive strength in 28 days, contain minimum 470 pounds of cementitious material per cubic yard, maintain a water-cementitious ratio not exceeding 0.45, and include air content of 5% ± 1.2%. All aggregates must be tested for reactivity within six months of the project per ASTM C1260, with restrictions on alkali content and D-cracking susceptibility. Wire rated up to 5,000 volts must conform to specified FAA standards, while electrical installations must comply with the National Fire Protection Agency's NFPA-70 National Electric Code. Ground resistance shall not exceed 25 ohms. Contractors must provide four sets of replacement lamps with the installation and perform slump testing on each concrete truck at the project site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Crystal River Airport Item L-849 Runway End Identifier Lights (REIL)
Crystal River, Florida Runway 9-27 Electrical Repairs
L-849-1 Not for Construction
Item L-849 Installation of Runway End Identifier Lights (REIL)
DESCRIPTION
849-1.1 This item shall consist of furnishing and installing an airport REIL in accordance with these specifications and in accordance with the dimensions, design, and details shown in the plans.
The work shall include the furnishing and installation of a support for mounting the REIL, the specified wire, and a concrete foundation. The item shall also include all cable connections, conduit and conduit fittings, the furnishing and installation of all lamps, ground rod and ground connection, the testing of the installation, and all incidentals necessary to place the REIL in operation as a completed unit to the satisfaction of the Engineer.
EQUIPMENT AND MATERIALS
849-2.1 General.
a. Airport lighting equipment and materials covered by Federal Aviation Administration (FAA) specifications shall be certified and listed under Advisory Circular (AC) 150/5345-53D, Airport
Lighting Equipment Certification Program.
b. All other equipment and materials covered by other referenced specifications shall be subject to acceptance through manufacturer’s certification of compliance with the applicable specification when requested by the Engineer.
849-2.2 REIL
a. The REIL and assemblies shall conform to the requirements of AC 849/5345-51B, Specification for Discharge-Type Flasher Equipment including Change 1.
849-2.3 Wire
a. Wire in conduit rated up to 5,000 volts shall conform to AC 849/5345-7F, Specification for L-824
Underground Cable for Airport Lighting Circuits, for Rubber Insulated Neoprene Covered Wire, of or Fed. Spec. J-C-30, Type RHW, for rubber insulated fibrous covered wire. For ratings up to
600 volts, thermoplastic wire conforming to Fed. Spec. J-C-30, Types TW, THW, and THWN, shall be used. The wires shall be of the type, size, number of conductors, and voltage shown in the plans or in the proposal.
849-2.4 Conduit
a. Rigid steel conduit and fittings shall conform to the requirements of Underwriters Laboratories
Standard 6, 514, and 1242.
L-849-2 Not for Construction
849-2.5 Concrete
a. The concrete for foundations shall be proportioned, placed, and cured in accordance with Item P-
610, Structural Portland Cement Concrete.
CONSTRUCTION METHODS
849-3.1 Installation
a. The REIL shall be installed on a concrete foundation as shown in the plans.
849-3.2 Electrical Connection
a. The Contractor shall furnish all labor and materials and shall make complete electrical connections in accordance with the wiring diagram furnished with the project plans. The electrical installation shall conform to the requirements of the latest edition of National Fire
Protection Agency, NFPA-70, National Electric Code.
If underground cable from the transformer vault to the Reil site and duct for this cable installation under paved areas is required, the cable and duct shall be installed in accordance with and paid for by linear foot measurement as described in Item L-108, Installation of Underground Power
Cables for Airports, and Item L-110, Installation of Airport Underground Electrical Duct Banks and Conduits. Electrical wiring and conduit between master and slave unit shall be considered incidental to Reil installation.
849-3.3 Booster Transformer
a. If shown in plans or specified in job specifications, a booster transformer to compensate for voltage drop to the lamps shall be installed in a suitable weatherproof housing. The booster transformer shall be installed as indicated in the plans and described in the proposal.
849-3.4 Ground Connection and Ground Rod
a. The Contractor shall furnish and install a ground rod, grounding cable, and ground clamps for grounding the REIL assembly. The resistance to ground shall not exceed 25 ohms.
849-3.5 Lamps
a. The Contractor shall furnish and install lamps as manufactured recommended by manufactures along with 4 sets of replacement lamps.
L-849-3 Not for Construction
METHOD OF MEASUREMENT / BASIS OF PAYMENT
125-4.1 REIL installation and all associated work shall be measured per each installed REIL and paid under following items listed in Bid Schedule A.
Payment will be made under:
Item 1 Replace Runway 9 REILS (per each)
Item 2 Replace Runway 27 REILS with New Foundation (per each)
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
Advisory Circulars (AC)
AC 150/5340-18 Standards for Airport Sign Systems
AC 150/5340-26 Maintenance of Airport Visual Aid Facilities
AC 150/5340-30 Design and Installation Details for Airport Visual Aids
AC 150/5345-5 Circuit Selector Switch
AC 150/5345-7 Specification for L-824 Underground Electrical Cable for Airport
Lighting Circuits
AC 150/5345-26 Specification for L-823 Plug and Receptacle, Cable Connectors
AC 150/5345-28 Precision Approach Path Indicator (PAPI) Systems
AC 150/5345-39 Specification for L-853, Runway and Taxiway Retroreflective Markers
AC 150/5345-42 Specification for Airport Light Bases, Transformer Housings, Junction
Boxes, and Accessories
AC 150/5345-44 Specification for Runway and Taxiway Signs
AC 150/5345-46 Specification for Runway and Taxiway Light Fixtures
AC 150/5345-47 Specification for Series to Series Isolation Transformers for Airport
Lighting Systems
AC 150/5345-51 Specification for Discharge-Type Flashing Light Equipment
AC 150/5345-53 Airport Lighting Equipment Certification Program
Engineering Brief (EB)
EB No. 67 Light Sources Other than Incandescent and Xenon for Airport and
Obstruction Lighting Fixtures
END OF ITEM L-849
Crystal River Airport Item P-610 Concrete for Miscellaneous Structures
P-610-1 Not for Construction
Item P-610 Concrete for Miscellaneous Structures
DESCRIPTION
610-1.1 This item shall consist of concrete and reinforcement, as shown on the plans, prepared and constructed in accordance with these specifications. This specification shall be used for all concrete other than airfield pavement which are cast-in-place.
MATERIALS
610-2.1 General. Only approved materials, conforming to the requirements of these specifications, shall be used in the work. Materials may be subject to inspection and tests at any time during their preparation or use. The source of all materials shall be approved by the Engineer before delivery or use in the work.
Representative preliminary samples of the materials shall be submitted by the Contractor, when required, for examination and test. Materials shall be stored and handled to ensure preservation of their quality and fitness for use and shall be located to facilitate prompt inspection. All equipment for handling and transporting materials and concrete must be clean before any material or concrete is placed in them.
The use of pit-run aggregates shall not be permitted unless the pit-run aggregate has been screened and washed, and all fine and coarse aggregates stored separately and kept clean. The mixing of different aggregates from different sources in one storage stockpile or alternating batches of different aggregates shall not be permitted.
a. Reactivity. Fine aggregate and coarse aggregates to be used in all concrete shall have been tested separately within six months of the project in accordance with ASTM C1260. Test results shall be submitted to the RPR. The aggregate shall be considered innocuous if the expansion of test specimens, tested in accordance with ASTM C1260, does not exceed 0.08% at 14 days (16 days from casting). If the expansion either or both test specimen is greater than 0.08% at 14 days, but less than 0.20%, a minimum of 25% of Type F fly ash, or between 40% and 55% of slag cement shall be used in the concrete mix. If expansion of either the coarse or fine aggregate exceeds 0.08% at 14 days, limit the alkali of the concrete to be less than or equal to 3.0 lb per cubic yard (1.8 kg per cubic meter), calculated in accordance with EB
106.
If the expansion is greater than 0.20% the aggregates shall not be used, and test results for other aggregates must be submitted for evaluation; or aggregates that meet P-501 reactivity test requirements may be utilized.
610-2.2 Coarse aggregate. The coarse aggregate for concrete shall meet the requirements of ASTM C33 and the requirements of Table 4, Class Designation 5S; and the grading requirements shown below, as required for the project.
P-610-2 Not for Construction
Coarse Aggregate Grading Requirements
Maximum Aggregate Size ASTM C33, Table 3 Grading
Requirements (Size No.)
1 1/2 inch (37.5 mm) 467 or
4 and 67
1 inch (25 mm) 57
¾ inch (19 mm) 67
½ inch (12.5 mm) 7
610-2.2.1 Coarse Aggregate susceptibility to durability (D) cracking. Aggregates that have a history of D-cracking shall not be used.
610-2.3 Fine aggregate. The fine aggregate for concrete shall meet all fine aggregate requirements of
ASTM C33.
610-2.4 Cement. Cement: ASTM C150, Type I; or ASTM C595, IL.
610-2.5 Cementitious materials.
a. Fly ash. Fly ash shall meet the requirements of ASTM C618, with the exception of loss of ignition, where the maximum shall be less than 6%. Fly ash shall have a Calcium Oxide (CaO) content of less than
15% and a total available alkali content less than 3% per ASTM C311. Fly ash produced in furnace operations using liming materials or soda ash (sodium carbonate) as an additive shall not be acceptable.
The Contractor shall furnish the previous three most recent, consecutive ASTM C618 reports for each source of fly ash proposed in the concrete mix, and shall furnish each additional report as they become available during the project. The reports can be used for acceptance or the material may be tested independently by the RPR.
b. Slag cement (ground granulated blast furnace (GGBF)). Slag cement shall conform to ASTM
C989, Grade 100 or Grade 120. Slag cement shall be used only at a rate between 25% and 55% of the total cementitious material by mass.
610-2.6 Water. Water used in mixing or curing shall be from potable water sources. Other sources shall be tested in accordance with ASTM C1602 prior to use.
610-2.7 Admixtures. The Contractor shall submit certificates indicating that the material to be furnished meets all of the requirements indicated below. In addition, the RPR may require the Contractor to submit complete test data from an approved laboratory showing that the material to be furnished meets all of the requirements of the cited specifications. Subsequent tests may be made of samples taken by the RPR from the supply of the material being furnished or proposed for use on the work to determine whether the admixture is uniform in quality with that approved.
a. Air-entraining admixtures. Air-entraining admixtures shall meet the requirements of ASTM
C260 and shall consistently entrain the air content in the specified ranges under field conditions. The air-entrainment agent and any water reducer admixture shall be compatible.
b. Water-reducing admixtures. Water-reducing admixture shall meet the requirements of ASTM
C494, Type A, B, or D. ASTM C494, Type F and G high range water reducing admixtures and ASTM
C1017 flowable admixtures shall not be used.
P-610-3 Not for Construction
c. Other chemical admixtures. The use of set retarding, and set-accelerating admixtures shall be approved by the RPR. Retarding shall meet the requirements of ASTM C494, Type A, B, or D and set-accelerating shall meet the requirements of ASTM C494, Type C. Calcium chloride and admixtures containing calcium chloride shall not be used.
610-2.8 Premolded joint material. Premolded joint material for expansion joints shall meet the requirements of ASTM D1752
610-2.9 Joint filler. The filler for joints shall meet the requirements of Item P-605, unless otherwise specified.
610-2.10 Steel reinforcement. Reinforcing shall consist of welded steel wire fabric conforming to the requirements of ASTM A1064 or ASTM A884.
610-2.11 Materials for curing concrete. Curing materials shall conform to ASTM C309.
CONSTRUCTION METHODS
610-3.1 General. The Contractor shall furnish all labor, materials, and services necessary for, and incidental to, the completion of all work as shown on the drawings and specified here. All machinery and equipment used by the Contractor on the work, shall be of sufficient size to meet the requirements of the work. All work shall be subject to the inspection and approval of the RPR.
610-3.2 Concrete Mixture. The concrete shall develop a compressive strength of 4000 psi 28 MPa in 28 days as determined by test cylinders made in accordance with ASTM C31 and tested in accordance with
ASTM C39. The concrete shall contain not less than 470 pounds of cementitious material per cubic yard
(280 kg per cubic meter). The water cementitious ratio shall not exceed 0.45 by weight. The air content of the concrete shall be 5% +/- 1.2% as determined by ASTM C231 and shall have a slump of not more than 4 inches (100 mm) as determined by ASTM C143.
610-3.3 Mixing. Concrete may be mixed at the construction site, at a central point, or wholly or in part in truck mixers. The concrete shall be mixed and delivered in accordance with the requirements of ASTM
C94 or ASTM C685.
The concrete shall be mixed only in quantities required for immediate use. Concrete shall not be mixed while the air temperature is below 40°F (4°C) without the RPRs approval. If approval is granted for mixing under such conditions, aggregates or water, or both, shall be heated and the concrete shall be placed at a temperature not less than 50°F (10°C) nor more than 100°F (38°C). The Contractor shall be held responsible for any defective work, resulting from freezing or injury in any manner during placing and curing, and shall replace such work at his expense.
Retempering of concrete by adding water or any other material is not permitted.
The rate of delivery of concrete to the job shall be sufficient to allow uninterrupted placement of the concrete.
610-3.4 Forms. Concrete shall not be placed until all the forms and reinforcements have been inspected and approved by the RPR. Forms shall be of suitable material and shall be of the type, size, shape, quality, and strength to build the structure as shown on the plans. The forms shall be true to line and grade and shall be mortar-tight and sufficiently rigid to prevent displacement and sagging between supports.
The surfaces of forms shall be smooth and free from irregularities, dents, sags, and holes. The Contractor shall be responsible for their adequacy.
The internal form ties shall be arranged so no metal will show in the concrete surface or discolor the surface when exposed to weathering when the forms are removed. All forms shall be wetted with water or
P-610-4 Not for Construction with a non-staining mineral oil, which shall be applied immediately before the concrete is placed. Forms shall be constructed so they can be removed without injuring the concrete or concrete surface.
610-3.5 Placing reinforcement. All reinforcement shall be accurately placed, as shown on the plans, and shall be firmly held in position during concrete placement. Bars shall be fastened together at intersections.
The reinforcement shall be supported by approved metal chairs. Shop drawings, lists, and bending details shall be supplied by the Contractor when required.
610-3.6 Embedded items. Before placing concrete, all embedded items shall be firmly and securely fastened in place as indicated. All embedded items shall be clean and free from coating, rust, scale, oil, or any foreign matter. The concrete shall be spaded and consolidated around and against embedded items.
The embedding of wood shall not be allowed.
610-3.7 Concrete Consistency. The Contractor shall monitor the consistency of the concrete delivered to the project site; collect each batch ticket; check temperature; and perform slump tests on each truck at the project site in accordance with ASTM C143.
610-3.8 Placing concrete. All concrete shall be placed during daylight hours, unless otherwise approved.
The concrete shall not be placed until the depth and condition of foundations, the adequacy of forms and falsework, and the placing of the steel reinforcing have been approved by the RPR. Concrete shall be placed as soon as practical after mixing, but in no case later than one (1) hour after water has been added to the mix. The method and manner of placing shall avoid segregation and displacement of the reinforcement. Troughs, pipes, and chutes shall be used as an aid in placing concrete when necessary. The concrete shall not be dropped from a height of more than 5 feet (1.5 m). Concrete shall be deposited as nearly as practical in its final position to avoid segregation due to rehandling or flowing. Do not subject concrete to procedures which cause segregation. Concrete shall be placed on clean, damp surfaces, free from running water, or on a properly consolidated soil foundation.
610-3.9 Vibration. Vibration shall follow the guidelines in American Concrete Institute (ACI)
Committee 309R, Guide for Consolidation of Concrete.
610-3.10 Joints. Joints shall be constructed as indicated on the plans.
610-3.11 Finishing. All exposed concrete surfaces shall be true, smooth, and free from open or rough areas, depressions, or projections. All concrete horizontal plane surfaces shall be brought flush to the proper elevation with the finished top surface struck-off with a straightedge and floated.
610-3.12 Curing and protection. All concrete shall be properly cured in accordance with the recommendations in American Concrete Institute (ACI) 308R, Guide to External Curing of Concrete.
The concrete shall be protected from damage until project acceptance.
610-3.13 Cold weather placing. When concrete is placed at temperatures below 40°F (4°C), follow the cold weather concreting recommendations found in ACI 306R, Cold Weather Concreting.
610-3.14 Hot weather placing. When concrete is placed in hot weather greater than 85ºF (30 ºC), follow the hot weather concreting recommendations found in ACI 305R, Hot Weather Concreting.
QUALITY ASSURANCE (QA)
610-4.1 Quality Assurance sampling and testing. Concrete for each day’s placement will be accepted on the basis of the compressive strength specified in paragraph 610-3.2. The Contractor will sample the concrete in accordance with ASTM C172; test the slump in accordance with ASTM C143; test air content in accordance with ASTM C231; make and cure compressive strength specimens in accordance with
ASTM C31; and test in accordance with ASTM C39. The QA testing agency will meet the requirements of ASTM C1077.
P-610-5 Not for Construction
The Contractor shall provide adequate facilities for the initial curing of cylinders.
610-4.2 Defective work. Any defective work that cannot be satisfactorily repaired as determined by the
RPR, shall be removed and replaced at the Contractor’s expense. Defective work includes, but is not limited to, uneven dimensions, honeycombing and other voids on the surface or edges of the concrete.
METHOD OF MEASUREMENT
610-5.1 Concrete shall be considered incidental and no separate measurement shall be made of concrete complete in place and accepted.
BASIS OF PAYMENT
610-6.1 Payment shall be made at the contract price and shall be considered incidental and no separate payment shall be made. This price shall be full compensation for furnishing all materials including reinforcement and embedded items and for all preparation, delivery, installation, and curing of these materials, and for all labor, equipment, tools, and incidentals necessary to complete the item.
Payment will be made under:
There shall be no direct payment for concrete. It shall be incidental to other items.
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM International (ASTM)
ASTM A184 Standard Specification for Welded Deformed Steel Bar Mats for
Concrete Reinforcement
ASTM A615 Standard Specification for Deformed and Plain Carbon-Steel Bars for
Concrete Reinforcement
ASTM A704 Standard Specification for Welded Steel Plain Bar or Rod Mats for
Concrete Reinforcement
ASTM A706 Standard Specification for Low-Alloy Steel Deformed and Plain Bars for
Concrete Reinforcement
ASTM A775 Standard Specification for Epoxy-Coated Steel Reinforcing Bars
ASTM A884 Standard Specification for Epoxy-Coated Steel Wire and Welded Wire
Reinforcement
ASTM A934 Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing
Bars
ASTM A1064 Standard Specification for Carbon-Steel Wire and Welded Wire
Reinforcement, Plain and Deformed, for Concrete
ASTM C31 Standard Practice for Making and Curing Concrete Test Specimens in the
Field
P-610-6 Not for Construction
ASTM C33 Standard Specification for Concrete Aggregates
ASTM C39 Standard Test Method for Compressive Strength of Cylindrical Concrete
Specimens
ASTM C94 Standard Specification for Ready-Mixed Concrete
ASTM C136 Standard Test Method for Sieve or Screen Analysis of Fine and Coarse
Aggregates
ASTM C114 Standard Test Methods for Chemical Analysis of Hydraulic Cement
ASTM C136 Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C143 Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150 Standard Specification for Portland Cement
ASTM C171 Standard Specification for Sheet Materials for Curing Concrete
ASTM C172 Standard Practice for Sampling Freshly Mixed Concrete
ASTM C231 Standard Test Method for Air Content of Freshly Mixed Concrete by the
Pressure Method
ASTM C260 Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C309 Standard Specification for Liquid Membrane-Forming Compounds for
Curing Concrete
ASTM C311 Standard Test Methods for Sampling and Testing Fly Ash or Natural
Pozzolans for Use in Portland-Cement Concrete
ASTM C494 Standard Specification for Chemical Admixtures for Concrete
ASTM C618 Standard Specification for Coal Fly Ash and Raw or Calcined Natural
Pozzolan for Use in Concrete
ASTM C666 Standard Test Method for Resistance of Concrete to Rapid Freezing and
Thawing
ASTM C685 Standard Specification for Concrete Made by Volumetric Batching and
Continuous Mixing
ASTM C989 Standard Specification for Slag Cement for Use in Concrete and Mortars
ASTM C1017 Standard Specification for Chemical Admixtures for Use in Producing
Flowing Concrete
ASTM C1077 Standard Practice for Agencies Testing Concrete and Concrete
Aggregates for Use in Construction and Criteria for Testing Agency
Evaluation
ASTM C1157 Standard Performance Specification for Hydraulic Cement
ASTM C1260 Standard Test Method for Potential Alkali Reactivity of Aggregates
(Mortar-Bar Method)
ASTM C1365 Standard Test Method for Determination of the Proportion of Phases in
Portland Cement and Portland-Cement Clinker Using X-Ray Powder
Diffraction Analysis
P-610-7 Not for Construction
ASTM C1602 Standard Specification for Mixing Water Used in the Production of
Hydraulic Cement Concrete
ASTM D1751 Standard Specification for Preformed Expansion Joint Filler for Concrete
Paving and Structural Construction (Nonextruding and Resilient Asphalt
Types)
ASTM D1752 Standard Specification for Preformed Sponge Rubber Cork and Recycled
PVC Expansion Joint Fillers for Concrete Paving and Structural
Construction
American Concrete Institute (ACI)
ACI 305R Hot Weather Concreting
ACI 306R Cold Weather Concreting
ACI 308R Guide to External Curing of Concrete
ACI 309R Guide for Consolidation of Concrete
END OF ITEM P-610