Certification_Statement_for_Keep_Jobs_in_Colorado_Act.pdf

PDF 92 KB Posted

Attached to
Lakemont Center Drainage Improvements
Solicitation number
ITB-25-051
Issued by
Jefferson County, Weston CDP, Colorado

About this file

This is a Certification Statement for the Keep Jobs in Colorado Act issued by the City of Wheat Ridge, Colorado, in compliance with H.B. 13-1292 for the Lakemont Center Drainage Improvements project (ITB-25-051). The project involves removing and replacing approximately 13 linear feet of 12-inch HDPE pipe, installing a 48-inch diameter manhole, providing bypass pumping and dewatering services, and cleaning and camera inspecting 4-inch, 8-inch, and 12-inch HDPE storm pipes. Additional work includes minor landscaping, asphalt and sidewalk replacement, curb and gutter work, concrete rundowns, sidewalk chases, and erosion control measures. Bid alternates are available for single spot pipe repairs and cured-in-place pipe lining. A mandatory pre-bid meeting is scheduled for November 4, 2025, at 2:00 pm, with bid submissions due on November 20, 2025, at 2:00 pm Mountain Time. The project completion time is 30 calendar days from the Notice to Proceed, and the contract will be awarded to the lowest responsive and responsible bidder.

The certification statement requires vendors to comply with the Keep Jobs in Colorado Act, which mandates that at least 80% of work on public works projects be performed by Colorado labor. Vendors must either commit to meeting this 80% Colorado labor requirement or comply with notification and waiver request procedures outlined in C.R.S. 8-17-101 et seq. Vendors must cooperate with investigations by the Colorado Department of Labor and Employment, and failure to comply with the Act or associated statutes may result in contract termination for breach and liability for actual and consequential damages. The certification must be signed by an authorized representative and include corporate attestation by a corporate secretary or equivalent. Bidders must submit a 5% bid bond, and the city will retain 5% of contract value until final completion. The project is funded through the city's Capital Improvement Program and will follow Colorado Department of Transportation Standard Specifications for Road and Bridge Construction, 2021 Edition.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF WHEAT RIDGE, CO

CERTIFICATION STATEMENT FOR

KEEP JOBS IN COLORADO ACT (80% Colorado Labor), COMPLIANCE TO H.B. 13-1292

Effective January 1, 2014, the Keep Jobs in Colorado Act requires that Colorado labor be employed to perform at least 80% of the work on a public works project, as defined in C.R.S. 8-19-102(2).

References

Keep Jobs in Colorado Act - 8-17-101, et.seq., C.R.S.

Definition of Public Projects - 8-19-102, C.R.S.

Construction Bidding for Public Projects – 24-92-102, C.R.S.

House Bill 13-1292, Keep Jobs in Colorado Act

The Vendor, whose name and signature appear below, certifies and agrees as follows:

1. The Vendor shall comply with the provisions of House Bill 13-1291 and CRS 8-17-101 et seq.

2. The Vendor represents, warrants, and agrees that it (i) Colorado labor will be employed to perform at least 80% of the work on a public works project, or (ii) otherwise, shall comply with the notification requirements and/or waiver request of CRS 8-17-101 et seq.

3. The Vendor shall comply with all reasonable requests made in the course of an investigation by the Colorado Department of Labor and Employment. If the Vendor fails to comply with any requirement of this Act or CRS 8- 17-101 et seq., the City may terminate the above referenced purchase order for breach and the Vendor shall be liable for actual and consequential damages to the City of Wheat Ridge.

CERTIFIED and AGREED to this day of , 2024

BID NUMBER:

FIRM:

(Print Full Legal Name)

AUTHORIZED SIGNATURE:

Print Name:

Print Title: Date:

Attestation: (A corporate attestation is required.)

BY:

Corporate Secretary or Equivalent