Central Utility Plant Selection Criteria.docx

DOCX document 30 KB Posted

Attached to
C1DA--A/E Project 593-22-350-Improve Central Utility Plant Las Vegas VA Southern Nevada Healthcare System
Solicitation number
36C26123R0109
Issued by

About this file

This document outlines the criteria and submission requirements for a solicitation to provide architectural and engineering services for improvements to the Central Utility Plant at the VA Southern Nevada Healthcare System in Las Vegas. Firms are to submit responses using the Standard Form 330, along with past performance questionnaires, to demonstrate their specialized experience in areas such as utility plant design, sustainability concepts, and construction phase services. Key personnel must include professionals experienced in various engineering disciplines as well as interior design and fire protection. Responses are due by the date specified in the solicitation, and the agency intends to award a firm-fixed-price contract to the most highly qualified offeror based on an evaluation of specialized experience, professional qualifications, past performance, quality control, and program management.

View the file

Other files

File Type Posted
36C26123R0109 Request for Information.docx DOCX document
36C26123R0109_1.docx DOCX document
593-22-350 SOW_ Improve Central Utility Plant.pdf PDF
36C26123R0109_1.docx DOCX document
Adjectival Rating Standards.docx DOCX document
S02 - Past Performance Questionnaire 36C26123R0109.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26123R0109 Design Improve Central Utility Plant Criterion 1- Specialized Experience (SF330, Part I, Section F):

Firms will be evaluated on specialized experience in performance of services similar to those anticipated under this contract through evaluation of experience in:

a) Designing and providing full construction drawings and specifications for various facility projects; including applying sustainability concepts through an integrated, cost-effective design approach.

b) Prepare design-build RFP packages: including environmental surveys, geotechnical reports and schematic design concepts.

c) Experience preparing preliminary design deliverables such as concept plans, facility planning studies, including developing facility requirements, preparing engineering evaluations, project scope, and unit guidance or parametric cost estimating.

d) Preparation of designs using AutoCAD or Revit; and

e) Providing construction phase services (shop drawing review, record drawings preparation, construction inspection services, and owner’s manuals)

Submission requirements: Provide a minimum of three (3) and a maximum of six (6) projects completed within the past seven (7) years immediately preceding the date of issuance of this notice that best demonstrate specialized experience of the proposed team in the areas outlined above. Completed is considered through more than 50% construction. Sufficient information to determine the date of completion the project must be included in the project description, or the project will not be considered. Provide at least one example project demonstrating experience with historic repairs/ renovation with a construction cost over $1 Million. If more than the maximum number of projects are submitted, the Government will only evaluate the first six (6) projects in the order submitted.

All projects provided in the SF330 must be completed by the actual office/branch/regional office/individual team member proposed to manage and perform work under this contract. Projects not meeting this requirement will be excluded from consideration in the evaluation. To enable verification, firms should include the SAM Unique Identity Number along with each firm name in the SF330 Part 1, Section F, block 25, “Firm Name” Include a contract number or project identification number in block 21. Include an e-mail address and phone number for the point of contact in block 23(c). In block 24, include in the project description the contract period of performance, date of project completion (MM/DD/YEAR), award contract value, current contract value, define professional service role and a summary of the work performed that demonstrates relevance to specialized experience as outlined above. For projects performed as a subcontractor or a joint venture involving different partners, specifically indicate the value of the work performed as a subcontractor or by those firms proposed for this contract, and identify the specific roles and responsibilities performed as a subcontractor or by those firms on the project rather than the work performed on the project as a whole. If the project description does not clearly delineate the work performed by the entity/entities offering/teaming on this contract, the project may be eliminated from consideration.

NOTE: If the firm is a joint venture, projects performed by both members of the joint venture should be submitted; however, if there are no projects performed by the joint venture, projects may be submitted for either member of the joint venture, not to exceed a total of six (6) projects, but greater consideration may be given where projects are demonstrated for the joint venture and/or both members of the joint venture.

Projects shall be submitted on the SF-330 at Part I, Section F and shall be completed projects. Projects not completed will be excluded from evaluation consideration. Completed is considered at least 50% through the construction phase. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand-alone contract award. Do not submit an IDIQ contract as an example project. The Government will not evaluate information provided for an IDIQ contract. Submitted projects that do not conform to this requirement will not be evaluated.

NOTE: Date of project completion is defined as date of final design acceptance by client and at least 50% through construction. For Full Design Projects, date of project completion is the date of final signed sealed plans & specifications to client, and the construction start date. For DB RFP Preparation, date of project completion is the date of final RFP documents submission and 50% construction completion. For DB RFP representing Contractor as DOR, date of project completion is the date of final design acceptance to client and at least 50% through construction. For Design Development and Studies/Investigations, date of project completion is the date of final submission of design development and/or report. A project may not be considered if insufficient information is provided to clearly show the date of completion.

All information for Criterion 1 should be submitted in the SF330, Part I, Section F of the. The Government WILL NOT consider information submitted in addition to Part 1, Section F in evaluation of Criterion 1.

Criterion 2- Professional Qualifications (SF330, Part I, Sections E & G):

Firms will be evaluated on professional qualifications, competence, and experience of the proposed key personnel in providing services to accomplish the tasks required under this contract, including participation in example projects as outlined in the SF330, Part 1, Section G. Key personnel are individuals who will have major contract or project management responsibilities and/or will provide unusual or unique expertise. Specific disciplines that must be included in key personnel are Project Managers, Quality Control Manager, Architects, Landscape Architects, Civil Engineers, Structural Engineers, Mechanical Engineers, Electrical Engineers, Geotechnical Engineers, Cost Engineers, Certified Interior Designers and licensed Fire Protection Engineers.

Submission Requirements:

SF330, Part I, Section E. Provide resumes for all proposed key personnel that illustrate experience in the work proposed under this contract. Resumes are limited to two (2) pages and should indicate: professional registration, certification, licensure and/or accreditation in appropriate disciplines; cite recent (within the past seven (7) years) project-specific experience in work relevant to the services required under this contract and indicate proposed role in this contract. At a minimum, resumes should indicate academic qualifications, professional licensure, supplemental training or certificates, and total years’ professional experience. Indicate participation of key personnel in example projects in the SF330, Part 1, Section G.

Criterion 3- Past Performance (SF330, Part I, Section H):

Firms will be evaluated on past performance with Government agencies and private industry in terms of work quality, compliance with schedules, cost control, and stakeholder/customer satisfaction. Evaluating past performance and experience will include information provided in Past Performance Questionnaires (PPQs) or CPARS for Criterion 1 projects and may include customer inquiries, Government databases, and other information available to the Government including contacts with points of contact in other criteria. NOTE: Past performance information for projects listed under Criterion 1 may be given greater weight.

Submission Requirements:

SUBMIT A COMPLETED CPARS EVALUATION FOR EACH PROJECT UNDER CRITERION 1. IF A COMPLETED CPARS EVALUATION IS NOT AVAILABLE, the Past Performance Questionnaire (PPQ) (Attachment (A) included in this notice is provided for the firm or its team members to submit to the client for each project included under Criterion 1, Specialized Experience. DO NOT SUBMIT A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.

IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your SF330. If the firm is unable to obtain a completed PPQ from a client for a project(s) before the response date set forth in this notice, firms should complete and submit with their responses the first page of the PPQ (Attachment (A), which will provide contract and client information for the respective project(s). Firms may submit a PPQ previously submitted under a different Notice/RFP (legible copies are acceptable) as long as it is on the same form as posted with this Synopsis. Firms should follow up with clients/references to ensure timely submittal of questionnaires. If requested by the client, questionnaires may be submitted directly to the Government's point of contact, VA Sierra Nevada Healthcare System, NCO 21, Attn: Charee Harris, Contracting Officer via email at charee.harris@va.gov, prior to the response date. Firms shall not incorporate by reference into their response PPQs or CPARS previously submitted in response to other A/E services procurements. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

Firms may provide any information on problems encountered and the corrective actions taken on projects submitted under Criterion 1 Specialized Experience. Firms may also address any adverse past performance issues. Information shall not exceed two pages.

Awards, letters of commendation, certificates of appreciation, etc. shall not be submitted and will not be considered in the evaluation.

Criterion 4- Quality Control Program (SF330, Part I, Section H):

Firms will be evaluated on the strength of the quality control program proposed by the firm to ensure quality products and services under this contract and means of ensuring quality services from their consultants/subcontractors. Maximum of 5 pages (one-sided) for Criterion 4 response. If an Offeror exceeds the page limit, the first 5 pages will be evaluated and pages after page 5 will not be evaluated.

Submission Requirements:

Describe the quality control program that will be utilized for all deliverables of this contract and the management approach for quality control processes and procedures. The description shall:

1. Explain the quality control program including an example of how the plan has worked for one of the projects submitted as part of SF330, Section F or how the plan will work if it has not been used previously.

2. Provide a quality control process chart showing the inter-relationship of the management and team components.

3. Describe specific quality control processes and procedures proposed for this contract including technical accuracy of and assurance of overall coordination of AE plans, specifications, and construction cost estimates.

4. Identify the quality control manager and any other key personnel responsible for the quality control program and a description of their roles and responsibilities.

5. Describe how the firm’s quality control program extends to management of subcontractors and specialty consultants.

Criterion 5- Program Management, Capacity and Firm Location (SF330, Part I, Section H):

Firms will be evaluated on the firm’s ability to plan for and manage work under the contract, the capacity to accomplish the work in the required time, and on the locations of their office(s) that will be performing the work under this contract and demonstrated knowledge of the primary geographic areas in which projects could be located. Greater consideration will be given for offerors with offices located in closer proximity to, or other demonstration that offerors will be able to perform quickly in, the geographic areas in which projects could be located. Maximum of 5 pages (one-sided) for Criterion 5 response. If an Offeror exceeds the page limit, the first 5 pages will be evaluated and pages after page 5 will not be evaluated.

Submission Requirements:

1. Provide an organizational chart for the team and discuss the management plan for this contract and personnel roles in the organization. Describe the ability of the firm to manage, coordinate and work effectively with team members, both internal staff and consultants. Discuss the history of working relationships with team members, including joint venture partners where applicable.

2. Describe the firm’s present workload and the availability of the project team (including consultants) for the specified contract performance period. Describe the workload/availability of the key personnel during the anticipated contract performance period and the ability of the firm to provide qualified backup staffing for key personnel to ensure continuity of services. General statements of availability/capacity may be considered less favorably.

3. Provide the location of the office(s) that will be performing the work, including main offices, branch offices, and offices of team members. Evaluation of firms will include consideration of their location within the primary geographic area of the projects which will be Las Vegas, Nevada region , located in VISN 21, VA Medical Facilities: VA Medical Center San Francisco, VA Palo Alto Health Care System, VA Northern California Health Care System, VA Central California Health Care System, VA Sierra Nevada Health Care System, VA Southern Nevada Health Care System, VA Pacific Islands Health Care System, VA Regional Office and Outpatient Clinic (Philippines) and all of their remote facilities Provide examples demonstrating team’s knowledge of the primary geographic areas in which projects could be located.

The evaluation board will prepare a selection report recommending at least three firms, in order of preference based on the combined SF 330 and discussion/interview score, that are considered to be the most highly qualified to perform the required services. The selection authority shall review the recommendations of the evaluation board and shall, with the advice of appropriate technical and staff representatives, make the final selection. This final selection shall be a listing, in order of preference, of the firms considered most highly qualified to perform the work. If the firm listed as the most preferred is not the firm recommended as the most highly qualified by the evaluation board, the selection authority shall provide for the contract file a written explanation of the reason for the preference.

All firms on the final selection list are considered “selected firms” with which the contracting officer may negotiate in accordance with FAR 36.606, beginning with the most preferred firms in the final selection. If a mutually satisfactory contract cannot be negotiated, the contracting officer shall obtain a written final proposal revision from the firm and notify the firm that negotiations have been terminated. The Contracting Officer will then initiate negotiations with the next firm on the final selection list. This procedure shall be continued until a mutually satisfactory contract has been negotiated. If negotiations fail with all selected firms, the contracting officer shall refer the matter to the selection authority who, after consulting with the contracting officer as to why a contract cannot be negotiated, may direct the evaluation board to recommend additional firms in accordance with 36.602.

Overall page limit for the submission of the SF330 is 100 pages. This does not include CPARS reports.

Questions regarding this procurement should be directed, in writing, to the Contracting Officer Charee Harris via E-mail at charee.harris@va.gov . It is the intent of the Contracting Officer to award one (1) firm-fixed price contract award under this solicitation.

Page 1 of

File details come from the government source that posted it. Updated .