CEN_Prelim_Plans.pdf
PDF 1 MB Posted
- Attached to
- FPCM-SW-HCFIP-001-ML Pharmacy Casework
- Solicitation number
- 0000000154
- Issued by
- California
About this file
This document appears to be a set of preliminary plans for a Central Health Services facility renovation project for the California Department of Corrections and Rehabilitation (CDCR) at the Centinela State Prison in Imperial, California. The plans provide a detailed overview of the proposed layout and room designations for the facility, including a radiology area, dental operatories, laboratory, pharmacy, mental health services, and various support spaces. Key rooms and their square footages are identified throughout the plans.
The plans indicate this is a sub-project within a larger capital improvement initiative for the prison. While specific procurement details are not provided, the plans have been reviewed and approved by the California State Fire Marshal and the CDCR Access Compliance office, suggesting this is part of a formal state contracting process. No additional details are given regarding the solicitation timeline, response requirements, or contract award and duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CCWF_Plans.pdf | ||
| CIW_Plans.pdf | ||
| KVSP_Plans.pdf | ||
| VSP_Plans.pdf | ||
| CIM_Plans.pdf | ||
| RJD_Plans.pdf | ||
| SW-HCFIP-001-ML_Pharmacy_Casework.pdf | ||
| Healthcare_Casework_Specification_Rev_01.pdf | ||
| CVSP_Prelim_Plans.pdf | ||
| ISP_Prelim_Plans.pdf | ||
| SOL_Plans.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
AREA NOT IN SCOPE OF WORK
(E) PARTITION
NON RATED PARTITION
CMU WALL
1 HOUR FIRE RATED PARTITION
2 HOUR FIRE RATED PARTITION
EXISTING 1 HOUR FIRE RATED PARTITION
EXISTING 2 HOUR FIRE RATED PARTITION
394 SF
(E)
RADIOLOGY
F142
131 SF
(E)
PANOREX
F143 fC fA fB f8f7f6 f5
71 SF
(E) DENTAL
SUPPLIES
F123
115 SF
(E) DENTAL
LAB
(FUTURE
OPERATORY)
F122
44 SF
OXYGEN
F210
108 SF
(E) TOOL
ROOM/
BMW
F130
171 SF
(E)
PHYSICAL
THERAPY
F141
80 SF
(E)
SUPPLIES
F137
32 SF
(E)
NARCOTICS
F138
30 SF
(E) PIC
F139
47 SF
KEY ROOM
F140
53 SF
(E) INMATE
RR
F135
74 SF
(E) TRASH
F130
106 SF
(E)
CUSTODY
OFFICE
F184
106 SF
(E) HRT
SUPV./ OSS
F183
106 SF
(E) DENTAL
OTs (2)
F182
106 SF
(E) SCC
(RELOCATED)
F181
107 SF
(E) UM RN
F18048 SF
(E) STAFF
RR
F189
49 SF
(E) STAFF
RR
F188
168 SF
LABORATORY
F212
106 SF
SRN II
(SCHEDULING)
F213
106 SF
AGPA, HPSI
F214
116 SF
CORRIDOR
F187
130 SF
MENTAL
HEALTH
F208
496 SF
PHARMACY
F134
331 SF
CORRIDOR
F126
106 SF
OT (2)
F211
192 SF
HALL WAY
F202
164 SF
NURSING/OT
WORKROOM
F203
145 SF
URGENT
BAY
F200
134 SF
STANDARD
BAY
F201
135 SF
OBSERVATION
ROOM
F204
136 SF
CLEAN
UTILITY
F207
42 SF
MEDICATION
STORAGE
F205
A 2.1.1F
Room
F136
(E) SECURE
ROOM
F132
(E) FOOD
PREP
F172
(E) SOILED
UTILITY
F148
(E) SOILED
LINEN
F149
A7 .2
F3
A7 .2
F
A7 .2
F
A7 .2
F
A7 .2
F
A7 .2
F15
A7 .1
F10
A7 .1
F
A7 .2
F31
4 2
C
LR
5'
F
F
70 SF
SOILED
UTILITY
F209
E_F137
E_F138
E_F139
F202
F
F
F
F
F
F207
F
F
F208
A7 .2
F
53 SF
STAFF RR
F206
M
IN
M
IN
M
IN
/4
5'-1"
/2
/2
F
F210
1'-6"
1'-6"
1'-6"
SHEET NOTES
A. ALL INTERIOR PARTITIONS SHALL BE "A3_" UNLESS NOTED OTHERWISE.
B. PLAN DIMENSIONS ARE FROM FACE OF FINISH WHERE “HOLD” OR “CLEAR” ARE
INDICATED. ALL OTHER PLAN DIMENSIONS ARE FROM FACE OF PARTITION TYPE AND DO
NOT INCLUDE APPLIED FINISHES.
C. ENSURE FINISH SURFACES ARE FLUSH AND SEAMLESS WHERE PARTITIONS AND/OR
FURRING ARE COPLANAR.
D. ALL PIPING, CONDUITS AND RELATED MECHANICAL AND ELECTRICAL ITEMS SHALL BE
CONCEALED WITHIN PARTITION/WALL ASSEMBLY IN FINISHED AREAS UNLESS NOTED
OTHERWISE.
E. PROVIDE BACKING/BLOCKING TO SUPPORT ALL WALL-MOUNTED ITEMS.
F. ALL MECHANICAL EQUIPMENT PADS TO BE 4" HIGH MINIMUM, UNLESS NOTED
OTHERWISE. SIZE OF PADS TO BE VERIFIED BY CONTRACTOR
G. REFER TO SHEET A3 SERIES FOR DETAIL OF TYPICAL DOOR JAMB AT ABUTTING WALLS
OR PARTITIONS.
H. ALL OFFICES, TREATMENT ROOMS, CONSULTATION ROOMS, AND RECOVERY ROOMS TO
HAVE A SINGLE COAT HOOK <CH-1> MOUNTED ON THE DOOR (ROOM SIDE) UNLESS
NOTED OTHERWISE. PATCH ALL HOLES IN EXISTING SURFACES WHERE EQUIPMENT
HAS BEEN REMOVED OR DEMOLITION HAS OCCURRED. PREPARE SURFACES AS
REQUIRED FOR NEW FINISHES. PATCH TO MATCH ADJACENT SURFACE IF NOT
SCHEDULED.
I. ALL EXISTING FLOOR OPENINGS AND DEPRESSIONS IN THE WORK SHALL BE FILLED OR
CLOSED, UNLESS NOTED OTHERWISE, WITH MATERIALS TO MATCH ADJACENT
SURFACES, FINISHES AND FIRE RATINGS.
430420
G311
G310
G309
G308
G307
G306
G305
G304
G303
G302
G312
FACILIITY A
LEVEL IV
FACILITY B
LEVEL IV FACILITY D
LEVEL IV
FACILITY C
LEVEL IV
PABX
MRI PAD
N
A I
N R
O F
I L
A C
A K
E R
U E
OF
T H
E
S
TA T E
L A
E S
T
A E RG E HT
F O
CALIFORNIA STATE FIRE MARSHAL
APPROVED
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspections. One set of approved plans shall be available on the project site at all times.
Reviewed by:
Construction Management, Inc.
9838 Old Placerville Road, Suite A Sacramento, Ca 95827
(916) 575-8888
JOB NO.
DATE
DESTROY AFTER USE
SHEET TITLE:
SHEET
L A
S T
R E
V
IS
IO
N
C A
L
IF
O R
N
IA
D E
P A
R T
M E
N T
O F
C O
R R
E C
T
IO
N S
A N
D R
E H
A B
IL
IT
A T
IO
N
REVISIONS
NO. DATE
Reviewed by:
DEPARTMENT OF CORRECTIONS
ACCESS COMPLIANCE REVIEW
Approval of this plan does not authorize or approve any ommission or deviation from applicable regulations
OFFICIAL STAMP
KEY PLAN
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
OFFICIAL STAMP
CONSULTANT LOGO
ARCHITECT LOGO
SUB-PROJECT 3
/2
/2
:0 :0
P
M
C:\Users\lsrodrigoe\Documents\Revit Local Files\34_oooo_Ao_CEN_lsrodrigoe.rvt
A2.1.2F
3593-002-00
SP3 - PARTIAL
FLOOR PLAN AREA
B-CENTRAL
HEALTH SERVICES
C E
N T
IN
E
L A
S T
A T
E P
R
IS
O N
B
R O
W N
R O
A D
IM
P
E R
IA
L C
A
C D
C R
H
C F
IP
09/21/2015
0 2'-0" 4'-0" 8'-0"
N
1/4" = 1'-0"
SP3 - PARTIAL FLOOR PLAN - CENTRAL HEALTH SERVICES
PRELIMINARY (DDs)
OS
OS
G
(E)
DENTAL
SUPPLIES
F123
(E)
DENTAL
LAB
(FUTURE
OPERATORY)
F122
OXYGEN
F210
(E) TOOL
ROOM/
BMW
F130
(E)
SOILED
LINEN
F149
(E)
SOILED
UTILITY
F148
(E)
HOLDING
F145
(E)
PANOREX
F143
(E)
PHYSICAL
THERAPY
F141
(E)
SUPPLIES
F137
(E)
NARCOTICS
F138
(E) PIC
F139
KEY
ROOM
F140
Room F136
(E)
SECURE
ROOM
F132
(E) FOOD
PREP
F172
(E)JANITOR
F171
(E) CELL
F170
(E)
CLEAN
UTILITY
F151
(E) MED
PREP.
F150
(E)
INMATE
RR
F135
(E)
TRASH
F130
(E)
CUSTODY
OFFICE
F184
(E) HRT
SUPV./
OSS
F183
(E)
DENTAL
OTs (2) F182
(E) SCC
(RELOCATED)
F181
(E) UM RN
F180
(E) STAFF
RR
F189
(E) STAFF
RR
F188
LABORATORY
F212
SRN II
(SCHEDULING)
F213
HRT II
SUPV.
F215 AGPA,
HPS I
F214
CORRIDOR
F187
SOILED
UTILITY
F209
MENTAL
HEALTH
F208
PHARMACY
F134
HEALTH
RECORDS
F216
CORRIDOR
F126
OT (2)
F211
HALL
WAY
F202
NURSING/OT
WORKROOM
F203
URGENT
BAY
F200
STANDARD
BAY
F201
OBSERVATION
ROOM
F204
CLEAN
UTILITY
F207
MEDICATION
STORAGE
F205
(E)
CLEAN
LINEN
F152
(E)
STORAGE
F153 (E)
VESTIBULE
F154
(E) CELL
F169
(E)
CORRIDOR
CORRIDOR
F185
(E)
CORRIDOR
F186
STAFF RR
F206
430420
G311
G310
G309
G308
G307
G306
G305
G304
G303
G302
G312
FACILIITY A
LEVEL IV
FACILITY B
LEVEL IV FACILITY D
LEVEL IV
FACILITY C
LEVEL IV
PABX
MRI PAD
N
AI
N
R O
F I
L A
C
A K
E R
U E
OF
T H
E
STA T E
L A
E S
T A E RG E HT
F O
CALIFORNIA STATE FIRE MARSHAL
APPROVED
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspections. One set of approved plans shall be available on the project site at all times.
Reviewed by:
Construction Management, Inc.
9838 Old Placerville Road, Suite A Sacramento, Ca 95827
(916) 575-8888
JOB NO.
DATE
DESTROY AFTER USE
SHEET TITLE:
SHEET
LA
ST
R
EV
IS
IO
N
C
AL
IF
O
R N
IA
D
EP
AR
TM
EN
T O
F C
O R
R
EC
TI
O
N S
AN
D
R
EH
AB
IL
IT
AT
IO
N
REVISIONS
NO. DATE
Reviewed by:
DEPARTMENT OF CORRECTIONS
ACCESS COMPLIANCE REVIEW
Approval of this plan does not authorize or approve any ommission or deviation from applicable regulations
OSHPD PEER REVIEW APPROVED
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans shall be available on the project site at all times.
Reviewed by:
OFFICIAL STAMP
NOT FOR
CONSTRUCTION
KEY PLAN
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
OFFICIAL STAMP
CONSULTANT LOGO
ARCHITECT LOGO
Capital Expenditure Managers Gateway Oaks Drive Suite 300 Sacramento, CA 95833
(916) 648-9700
5/ 1/
:5
9:
P M
C:\BIM\34_oooo_MEP_CEN_asalija@kitchell.com.rvt
ES2.2.2F
3593-002-00
5/4/2015
SP3 - CENTRAL
HEALTH SERVICES
- EQ COORD
CHECK - POWER &
SIGNAL - AREA B
C
EN
TI
N
EL
A
ST
AT
E
PR
IS
O
N
IM
PE
R
IA
L
B R
O W
N R
O
AD
IM
PE
R
IA
L, C
A
C D
C R
H
C
FI
P
1/4" = 1'-0"
1 SP3 - CENTRAL HEALTH SERVICES - EQ COORD CHECK - POWER & SIGNAL - AREA B
PRELIMINARY (DDs)
File details come from the government source that posted it. Updated .