CEILING_TILE_REPLACEMENT_AT_MARIN_SCHOOL.pdf
PDF 338 KB Posted
- Attached to
- CEILING TILE REPLACEMENT AT MARIN SCHOOL
- Solicitation number
- BMB027251
- Issued by
- Fairfield County, Connecticut
About this file
This is an Invitation to Bid (ITB) issued by the City of Bridgeport, Connecticut, specifically the Bridgeport Public Schools (BPS) Facilities Department, for a ceiling tile replacement project at Marin School. The project involves removing approximately 14,800 square feet of existing ceiling tiles and installing new ceiling tiles, with work scheduled to be completed during the April Break from Saturday, April 11th to Sunday, April 20th, 2025. Bidders are required to submit their proposals via the OpenGov procurement portal by February 12, 2025, at 2:00 pm EST, with all pricing to remain valid for 120 days from the bid opening date.
The bid encourages participation from Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and City-based businesses (CBB), with certification requirements specified in the document. Payment terms are set at Net 45 Days, and the project is exempt from Connecticut state sales tax. Bidders must provide a 10% bid bond or certified check if the bid is $50,000 or more, with additional performance and payment bond requirements for larger contract values. The city reserves the right to reject any bid and make awards based on factors including cost, lead time, equipment availability, and other specified considerations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0._GENERAL_CONDITIONS_-_FINAL_REV._JAN_2025.pdf | ||
| BID_FORM.docx | DOCX document | |
| Construction_Contract_Marin_Elementary_School.pdf | ||
| Ex-C_Construction_Project_Insurance_Rider.pdf | ||
| SPECIFICATIONS_.pdf | ||
| EXHIBIT_A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
BMB027251
CEILING TILE REPLACEMENT AT MARIN SCHOOL
CITY OF BRIDGEPORT
DEPARTMENT OF PUBLIC PURCHASES
999 BROAD STREET
BRIDGEPORT CT 06604
Submission Deadline:
Wednesday, February 12, 2025 by 2:00 pm
Table Of Contents
1. Introduction
2. Statement of Work
3. Submission Deadlines
4. Terms and Conditions
5. Vendor Questionnaire
Attachments:
A - EXHIBIT A
B - SPECIFICATIONS
C - BID FORM
D - Construction Contract_Marin Elementary School
E - Ex-C_Construction Project Insurance Rider
F - 0. GENERAL CONDITIONS - FINAL REV. JAN 2025
1. Introduction
The City of Bridgeport , Bridgeport Public Schools (BPS) Facilities Department seeks bids for CEILING TILE REPLACEMENT AT MARIN SCHOOL.
The requirements of this bid are outlined in greater detail under Bid Information Section.
The selected awardee must meet all municipal, State and Federal practices and requirements.
Please note the City of Bridgeport encourages Minority business enterprises (MBE), Women business enterprises (WBE) and City-based businesses (CBB) to submit proposals. MBE, WBE or CBB State and/or City certification(s) showing the vendor’s current M/WBE and/or CBB status must be included as part of the proposal package at the time of submission for such status to be considered. For details, please see City Ordinance 3.12.130D
1.1. City Background
Bridgeport, the most populous city in Connecticut and the fifth-most populous in New England, is situated in eastern Fairfield County at the mouth of the Pequonnock River on Long Island
Sound. With a population of 148,654 in 2020, it is 60 miles from Manhattan and 40 miles from
The Bronx, forming part of the New York metropolitan area. The city borders Trumbull to the north, Fairfield to the west, and Stratford to the east. Bridgeport is a significant part of the
Greater Bridgeport Planning Region and the Bridgeport-Stamford-Norwalk-Danbury metropolitan statistical area, the second largest in Connecticut.
Since the early 21st century, Bridgeport has seen extensive redevelopment in its downtown and other neighborhoods. Bridgeport is home to several educational institutions, including the
University of Bridgeport, Housatonic Community College, Paier College, and part of Sacred
Heart University, as well as the state's only zoo, Connecticut's Beardsley Zoo. The city is also nicknamed "Park City" for its 35 public parks, covering 1,300 acres, including two large parks.
Despite not being headquartered in the city, over a dozen Fortune 500 companies are based in the metropolitan area shared with Stamford.
Bridgeport is a culturally vibrant city with three museums, numerous parks, and significant venues like Seaside Park, the Total Mortgage Arena, and the Hartford HealthCare Amphitheater.
The Barnum Museum and Connecticut's Beardsley Zoo are notable attractions, enhancing the city's cultural and recreational appeal. Recognized for its diversity, Bridgeport is consistently ranked among the 25 most ethnically and culturally diverse cities in the United States.
2. Statement of Work
2.1. Project Description
The Bridgeport Public Schools (BPS) Facilities Department seeks to enter into a contract with a qualified contractor to remove approximately 14,800 square feet of existing, furnish and install new ceiling tiles.
2.2. SCOPE OR WORK
SCOPE OF WORK
Contractor will provide the following services:
• Remove and dispose of existing materials
• Wipe and clean ceiling grid prior to installation
• Furnish and install new ceiling tiles per Specification, attached herein or approved equal
• All electrical work shall be provided by Others
• All removal and reinstallation of horn strobes/smoke detectors/sprinklers/speakers/exit signs, if applicable, is by others
Any equivalent materials proposed must be approved by the Board of Education Facilities
Manager. Bidder must provide full details of any exceptions to the specifications. Details must be submitted separately and attached to the Bid Form.
Note: the dimensions provided are approximate. Exhibit A, FLOOR PLANS.
Contractor is responsible for preparing own calculations.
All equipment shall be supplied by one manufacturer/distributor unless approved by the
BOE Facilities manager.
The Bidder or supplier must be an authorized dealer and/or distributor for all material supplied or installed, and may be required upon request to provide proof of all applicable licensing.
MATERIALS
All equipment and material supplied/installed must be new and of current manufacturer, and shall meet or exceed all specifications described herein. Any deviations to specifications must be indicated with the proposal response.
Materials must be stored and protected by Contractor during and after the installation process until acceptance by the owner.
WORKING CONDITIONS
Contractor must provide refuse container for removal of existing materials, if needed. Contractor shall not use the Board of Education school dumpsters
Container location must be approved by Building Operations Manager.
Contractor must protect the work during and after the installation process until acceptance by the owner.
Contractor is responsible for cleaning areas where work is performed from demolition/installation process. Cleaning includes dust removal with broom or vacuum and damp mopping. Areas that need to be taken into consideration include walls, corridor floors, light fixtures, windowsills, door frames, lockers or other amenities.
Contractor must protect walls and finishes while performing work.
Upon completion the areas shall be returned to the pre-existing condition or better.
WORK HOURS/DAYS
Contractor shall coordinate its schedule so that the work on the Premises is performed during those hours the BOE sets forth in a written notice to Contractor, unless written permission is obtained from the BOE to work during other times. This condition shall not excuse the
Contractor from timely performance under the Contract. The work schedule must be agreed upon by the BOE and Contractor.
CLEAN UP
Contractor must clean up all unused materials. Debris must be removed by contractor.
MATERIALS & INSTALLATION WARRANTY
The Contractor warrants that materials will be free from defects before installation.
The Contractor warrants that installation of the materials will be free from defects in workmanship.
The sole and exclusive remedy under the materials and installation warranty shall be the replacement of defective materials and repair of any damages to the ceiling resulting directly from defective materials or defective installation by the Contractor.
2.3. QUALIFICATIONS & OTHER REQUIREMENTS
Contractor must be capable, experienced, and licensed to perform all services listed in the Scope of Services Section. Contractor shall be an established firm experience in Field and have been in business for a minimum of five (5) years. Employ trained personnel. Provide service and shall maintain a local office with adequate inventory of replacement material listed in the Scope of
Work.
OSHA COMPLIANCE & ENVIRONMENTAL LIMITATIONS
The contractor must fully comply with all relevant OSHA requirements and regulations.
Comply with requirements of material suppliers.
Adhere to all environmental requirements for materials. Protect all persons from exposure to hazardous material.
Contractor must provide all tools, materials and equipment necessary to complete all tasks, including refuse removal.
Bidder must comply with the following:
➢ Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with its bid submission if the bid is $50,000.00 or more, except for bids from MBE’s, for which a bid bond is required on bids that are $100,000 or more.
➢ The successful bidder, prior to permission to proceed, will be required to post a payment bond of
100% of the contract price if the contract price is in excess of $100,000, and a performance bond, for
100% of the contract price, if the bid is $50,000.00, or more except that performance bonds from MBE’s will only be required on projects that are $100,000.00 or more. THE MBE CERTIFICATION SHALL
BE SUBMITTED AT THE TIME OF BID OR NO EXEMPTION FROM THE BID BOND
REQUIREMENTSHALLBE PERMITTED.
The contractor shall be responsible for obtaining and paying for any and all permits asrequired.
2.4. Timeline
Note: Work to be completed during April Break, Saturday April 11th– Sunday, April 20th, The Contractor will be required to place a reasonable schedule, including time frame to procure and deliver Equipment, attached to Bid Form. In the event that the schedule will be exceeded based upon parts availability or circumstances beyond Contractor’s control, it is the Contractor’s responsibility to inform the BOE Facilities Manager of the delay.
2.5. Pricing
All pricing must be valid for no less than one hundred and twenty (120) days from the RFP opening date. Services and materials for this project are exempt from State of Connecticut sales tax.
2.6. Payment Terms
Payment terms are Net 45 Days.
3. Submission Deadlines
3.1. Contacting the City of Bridgeport
The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.
The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.
Instructions to do so are as follows:
1. Go to the procurement portal, OpenGov
2. Click on any bid you see. It will take you that bid’s page.
3. On the right-hand side of the page, click on Register now for free!
4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.
If you have any trouble registering on the procurement portal, please email OpenGov at procurement-support@opengov.com
Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.
General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. The cut-off date for questions and answers is 12:00 pm on January 29, 2025 @12:00pm. All answers will be published in the form of addenda on the procurement portal.
3.2. Submission Instructions
All submissions must be submitted via the procurement portal.
Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.
Submission: ONE (1) ORIGINAL, ONE (1) COPY AND ONE (1) ELECTRONIC VIA
THUMBDRIVE MUST BE SUBMITTED.
Sealed submissions must be received and time-stamped by the Department of Public Purchases prior to ITB closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’ Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your ITB envelope as follows:
BMB027251 – CEILING TILE REPLACEMENT AT MARIN SCHOOL
Mail your submissions to:
Laura DeMoura City of Bridgeport Department of Public Purchases 2nd floor, 999 Broad Street Bridgeport, CT 06604
ITB submissions are due:
February 12, 2:00 p.m. Eastern Standard Time (EST)
3.3. Compliance
Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of
Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.
No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No
Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No
Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.
Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.
Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.
Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process
Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.
Dates: Please keep in mind dates are estimates only and are subject to change.
3.4. Reservation of Rights
This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:
Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the
City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.
MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.
Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.
Purchase Order - Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.
Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice.
Liability: the City of Bridgeport is not liable to any Respondent for damages of any type, however arising.
3.5. Additional Bid Requirements
Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.
Minority and Buy Local: The City of Bridgeport Minority and Buy Local Program Ord.
3.12.130 E, may be applicable to this project.
Minority Business Enterprise (MBE) and, or as a City Based Business (CBB): In conjunction with this invitation, certifications of the vendors current MBE and, or CBB status must be included as part of the bid package at the time of the bid submission. Consistent with the terms of City Ordinance 3.12.130 no submission either MBE or CBB certification will be accepted when such certifications(s) is, are not submitted as part of the bid package at the time of bid submission. For MBE | CBB certification information, please contact Mr. Jason
Chandersingh, Special Project Coordinator, Small & Minority Business Resource Center at (203)
576-7110, jason.chandersingh@bridgeportct.gov mailto:jason.chandersingh@bridgeportct.gov
4. Terms and Conditions
4.1. Terms and Conditions
All City of Bridgeport contracture terms, conditions, and requirements apply.
4.2. Payment Terms
Detail the payment schedule and any conditions for payment.
4.3. Warranty and Support
Specify any warranty and support requirements.
4.4. Openness of Procurement Process
Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.
4.5. Errors and Omissions
Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.
4.6. Collusion
By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the
Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.
4.7. Suspension and Debarment
The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part
31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945
The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.
By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:
The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.
5. Vendor Questionnaire
1. Federal I.D. Number or Social Security Number:*
*Response required
2. Confirmation*
Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.
☐ Please confirm
*Response required
3. Contractor's License Number*
*Response required
4. Contractor's Certification of Surety*
Please download the below documents, complete, and upload.
• Contractor's_Certification_...
*Response required
5. Contractor's Designation of Compliance Officer*
Please download the below documents, complete, and upload.
https://government-project.s3.us-west-2.amazonaws.com/115403/e5aa1a6f-6b99-4f8f-af4f-c380ae23d501_Contractor%27s_Certification_of_Surety.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=0f8ac34427c40d7bfca4811bcb464bcbdf5f8fc8c798e6be4af0e2a2a69c5e6c&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Certification_of_Surety.pdf%22&x-id=GetObject
• Contractor's_Designation_of...
*Response required
6. Contractor's Good Standing Certification*
Please download the below documents, complete, and upload.
• Contractor's_Good_Standing_...
*Response required
7. Contractor's MWBE Utilization Form*
Please download the below documents, complete, and upload.
• Contractor's_MWBE_Utilizati...
*Response required
8. Contractor's Wage Certification Form*
Please download the below documents, complete, and upload.
• Contractor's_Wage_Certifica...
*Response required
9. Equal Opportunity Policy Statement*
Please download the below documents, complete, and upload.
• Equal_Opportunity_Policy_St...
*Response required
10. Mandatory Good Faith Efforts-Waivers-Exceptions*
Please download the below documents, complete, and upload.
• Mandatory_Good_Faith_Effort...
*Response required
11. No Conflicts-Disclosure Form*
Please download the below documents, complete, and upload.
• No_Conflicts-Disclosure_For...
*Response required
12. Bid/Pricing Form*
*Response required https://government-project.s3.us-west-2.amazonaws.com/115403/75efbd30-4945-4f69-a730-84ce2633da7b_Contractor%27s_Designation_of_Compliance_Officer.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=8354bfe1911b5a10fc3e15376d718a594ae665d37fc82d41637c61fe61dda2f4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Designation_of_Compliance_Officer.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/8d9bf061-767f-4716-a5fe-0d8d8ec81783_Contractor%27s_Good_Standing_Certification.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=87f175d28353b067e8898c9f7e4870d7b3e72c7dc761db5eecfebc13c425a11d&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Good_Standing_Certification.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/a2e401a8-0a6b-4dee-8b6c-a19d3aab26eb_Contractor%27s_MWBE_Utilization_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=fbed4c84e61144e042860beedeceef1cd378fc1e52bb4d20ba127cc5450b1b98&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_MWBE_Utilization_Form.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/1f78a44b-bb56-4dd0-8d6a-e058a93b966e_Contractor%27s_Wage_Certification_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=80a6b233c77ba4c8fcf672f3d7b4346baf0acf9706206b7231a1f83627625001&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Wage_Certification_Form.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/5b16fe76-119d-4555-9b91-564f8a193a43_Equal_Opportunity_Policy_Statement.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=251f1500cae4e04f061a699bc0383e1933c1578583a319035171bde758f00bd5&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Equal_Opportunity_Policy_Statement.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/5e2a342c-4e1b-495e-bcd0-968e0b09d858_Mandatory_Good_Faith_Efforts-Waivers-Exceptions.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=7008d7455659ec74b5d66257c66ce1a407bc5f90faf85d4f88ea0cff84ab7b75&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Mandatory_Good_Faith_Efforts-Waivers-Exceptions.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/71724e63-735a-4ba1-a382-4248a8a3ee90_No_Conflicts-Disclosure_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4LNVAIFRF%2F20250110%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250110T133000Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjELz%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIHlOlQQ99SSXBLQWEj4GISCccbRwhZMl54EumZj0FFn9AiBkRHJJCkwklQ7P3flcMY1HMcnRO2gM7zIFVr%2F2ieXCviqMBQil%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMbepoeTxRgqrzUi8eKuAEgk5ZxQoRtW6RMGlewumbpyvd95wMgj%2FeECni9RuB7PtXblrzymbPk%2FNsGw8WrfZkrmWqbMZkjZnLIQxXFK%2F%2Bzqh4M2u%2FfiP8AeGEWzvK1d0iSsG7IC3cO%2F9c%2F4H9DUDlBoJZWWJfQe7gtJgZG5OJCxBFjwb4YuaOR%2BXyEsgFDTnPwFJFdRBeyAhzRTrggP7ErNSqYxESZU4Pg%2BoL2KcqYsbbWvKY0mP1Mj50mXlUpLJf1C7vtUd0d2gto3IUjZRMZTYi8wStuNvEY06uSUUwmDCglhviXmkI1Tyq1Wc8oCyBodsB%2BofIUMLszQ3sIT1QlaPJrPLT%2FXpS2JAU6aSLCr8JbEhi8hSse2ZFiyXUzvoUTFbbbO2OH5b8zt%2FR1gO0yqPznLwdJ%2Bhd8iCd%2Bb%2F2mVI83gtp8wU25KuxocP9aXX94sWa9So1CW56hHax1iWzMrN80SEOJbx1bC4SVPf7WbBuzaxLL6OIGqMZ98o%2Fh3Yw3fa4LGA65%2FZ7JeCFOa48DVfYS58BiNtyRvxMfnbvauJ73aXeDRFyu4V1OaLCYgp1f9meNokXZV9m6lL588b1ymQyQ9tzLriJlPnJE9dHSqWjFyBMq1%2Bq9eTvTrIPLCMsgrhoJcIVNFhIPxfjLu2X4UiKbCahwk%2BAl9B6CLcXo6BZ0CFeangb4kFSZu2PYs%2F4PdH2PLf%2BPjs9%2BlA8hOvKGpDNhKhioNg01QLt6FJ%2FrFnQ%2FiVfRU%2Fhv71xpRXogxybKh2NdzC9ceDAie676TNuGFtnU1PEloRJvIIpOf2NN0cjpuYfIJQMe9V3t83DG30w4pqEvAY6nAF83NX7FAECz7OiexuxO24IUkwFDJWab4QK9cJI8G9lMv26Y0%2FQxNLp6vclOTUxw4%2FWNmFBNCbNE7B%2B4wTUHw7YovY148WvtSmB5C0TmlrlX1GCpNnV33wNYIOkxstvfIbZWrTsfxOzgT%2BzkmeeaBXyQW5Hmqc68O%2Fj0OAxrIsZL5%2BEl11uKiIeG3mk040T%2FcF6jcbNDjwf0yiDm7o%3D&X-Amz-Signature=872287129268fbd7bd8bd8a859e21cff516037fe73efbffde6f05b4257de3441&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22No_Conflicts-Disclosure_Form.pdf%22&x-id=GetObject