BID_FORM.docx

DOCX document 20 KB Posted

Attached to
CEILING TILE REPLACEMENT AT MARIN SCHOOL
Solicitation number
BMB027251
Issued by
Fairfield County, Connecticut

About this file

This is a Bid Form for a ceiling tile replacement project issued by Bridgeport Public Schools (BPS) Facilities Department in Connecticut for Marin School. The project involves replacing ceiling tiles on the first floor, cafeteria, second floor, and stairwells, with work scheduled to be completed during the April Break from Saturday, April 11th to Sunday, April 20th, 2025. Bidders are required to provide a comprehensive bid that includes all associated costs such as permits, bonds, equipment, standard warranty, freight, shipping, delivery charges, labor, installation, safety checks, and related materials, with a requirement to identify and submit labor rates for all subcontractors.

The bid form specifies that prevailing wages must be used if the total bid exceeds $100,000, and contractors must indicate their lead time for procuring and delivering materials by stating the number of days required. Bidders are expected to attach a tentative work schedule to the bid form and provide line-item pricing for the base bid and two alternates: the cafeteria and the second floor and stairwells. The project appears to be funded through the City of Bridgeport's public school facilities budget, with the bid serving as a competitive procurement process to select a qualified contractor for the ceiling tile replacement project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM

Bid # BMB -CEILING TILE REPLACEMENT-MARIN SCHOOL

BASE BID:

Refer to Bid Documents Contractor shall include all monies and fees to complete the Work, including permits, bonds, equipment, standard warranty, freight, shipping and delivery charges, labor, installation, and or set-up costs, safety checks and all related materials. All sub-contractors must be identified and their labor rates submitted with bid, if applicable.

FIRST FLOOR

____________________________________________________Dollars_______________________________Cents

ALTERNATE 1- CAFETARIA

____________________________________________________Dollars_______________________________Cents

ALTERNATE 2- SECOND FLOOR AND STAIRWELLS

____________________________________________________Dollars_______________________________Cents

PLEASE NOTE THAT STATE OF CONNECTICUT PREVAILING WAGES MUST BE USED IF TOTAL BID EXCEEDS $100,000.

LEAD TIME FOR EQUIPMENT & SUPPLIES

Please include the Number of Days to procure and deliver the material needed to complete the Work _______________________________days Note: Work to be completed during April Break, Saturday April 11th– Sunday, April 20th, 2025

Please attach a tentative schedule for the Work to this Bid Form