CDRLs.pdf

PDF 595 KB Posted

Attached to
Level 1 Bar, Hexagon Federal contract opportunity
Solicitation number
SPMYM325Q9017
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document is a Contract Data Requirements List (CDRL) for a metal bar contract with the Portsmouth Naval Shipyard. The CDRL contains five separate data items (A001-A005) related to inspection, certification, and testing requirements for a metal bar, specifically a Level 1 Bar, Hexagon. Each data item requires the contractor to submit specific documentation, including an Inspection and Test Plan, Chemical and Mechanical Certification Data, Special Emphasis Certificates of Conformance, Intergranular Corrosion Test Certifications, and Macrostructure Test Certifications.

The documentation must be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each material shipment, with each data item submitted under a separate shipment number. No material can be shipped before receiving acceptance. The contract references specific performance standards such as SAE-AMS-QQ-S-763 for testing, and involves clauses related to payment and data submission (252.232-7006, 252.232-7003, or 52.232-36). The contract number is SPMYM325Q9017, and the documents were prepared by Michael Cruver and approved by Matthew Gendreau on 05/27/2025.

View the file

Other files for this federal contract opportunity

Other files attached to Level 1 Bar, Hexagon, newest first.
File Type Posted
SPMYM325Q9017 Amendment.pdf PDF
TDP 9510-00-151-7340 VER 001.pdf PDF
SPMYM325Q9017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

BAR, METAL

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

INSPECTION AND TEST PLAN

3. SUBTITLE

INSPECTION SYSTEM PROCEDURES

4. AUTHORITY (Data Acqisition Document No.)

DI-QCIC-81110 (SE)

5. CONTRACT REFERENCE

TDP: PARA 3.10.3

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Paragraph 10.4 of DI-QCIC-81110 does not apply.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

Code 136.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

MICHAEL CRUVER

H. DATE

05/23/25

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 1 of 5 Page(s)

S/N 0102-LF-010-5600

Matthew Gendreau 05/27/2025

A0002

SPMYM325Q9017

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

BAR, METAL

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

CERT DATA FOR SPECIAL EMPHASIS MATL

3. SUBTITLE

CHEMICAL AND MECHANICAL

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-81020 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.17

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

MICHAEL CRUVER

H. DATE

05/23/25

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 2 of 5 Page(s)

S/N 0102-LF-010-5600

Matthew Gendreau 05/27/2025

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

BAR, METAL

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

SPECIAL EMPHASIS C OF C

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (CCDD)

5. CONTRACT REFERENCE

TDP: PARA 3.22

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

MICHAEL CRUVER

H. DATE

05/23/25

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 3 of 5 Page(s)

S/N 0102-LF-010-5600

Matthew Gendreau 05/27/2025

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

BAR, METAL

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS (Intergranular Corrosion Test)

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.9

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

Test Certification of Intergranular Corrosion Test

Performance - SAE-AMS-QQ-S-763

Acceptance - SAE-AMS-QQ-S-763

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.

Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

MICHAEL CRUVER

H. DATE

05/23/25

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 4 of 5 Page(s)

S/N 0102-LF-010-5600

Matthew Gendreau 05/27/2025

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

BAR, METAL

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

TEST CERTIFICATIONS (Macrostructure)

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.9

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, and 10.3 of DI-MISC-80678 do not apply.

Test Certification of Macrostructure

Performance - SAE-AMS-QQ-S-763

Acceptance - SAE-AMS-QQ-S-763

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36.

Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

MICHAEL CRUVER

H. DATE

05/23/25

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 5 of 5 Page(s)

S/N 0102-LF-010-5600

Matthew Gendreau 05/27/2025

File details come from the government source that posted it. Updated .