CDRLs_B.pdf
PDF 165 KB Posted
- Attached to
- F-16 Commercial Fire Control Computer Repairs
- Solicitation number
- FA825123R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA825123R0007 - Rev2.pdf | ||
| CFCC_Pricing_Structures.xlsx | XLSX spreadsheet | |
| 20230320_PWS_CFCC_Final.pdf | ||
| 254_Security_Classification.pdf | ||
| Packaging_SOW.pdf | ||
| DRILS_Technician_Guide.pdf | ||
| Transportation_Data.pdf | ||
| Packaging_Requirements.pdf | ||
| FA825123R0007.pdf | ||
| CAV_AF_SOW.pdf | ||
| Wage_Determination.pdf | ||
| SCRM Evaluation Criteria.pdf | ||
| CDRLs_A.pdf | ||
| IUID.pdf | ||
| ITEM_DESCRIPTION.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
B001 Supply Chain Risk Management (SCRM) Plan System Securities Plan & SCRM Plan
DI-MGMT-82256 PWS paragraphs:SEE BLK 16 416 SCMS/GUMAB
DD
A D
1TIME
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT.
84056-5825
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN
BLDG 1215
HILL AFB, UT
84056-5825
SEE BLK 16
0 2 0
NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: Contractor's format is acceptable using electronic format, Microsoft Word® Word version .docx, is acceptable.
2. Block 5: The SCRM Plan addresses three items: Continuity of Operations (COOP), Foreign Influence, and Cyber security. PWS Paragraphs: 13.1.7; 9.0;
10.0; 11.0 and 12.0
3. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://piee.eb.mil using DODAAC FA8251. MARK FOR: First Address in block 14a
b. The contractor shall submit the Supply Chain Risk Management Plan via e-mail to the following e-mail addresses:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
4. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the SCRM Plan NLT ninety (90) days upon contract award (ARO).
5. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:44:57 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.1548
898737 Date: 2023.03.16 09:50:45 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology). (March 2023). Other requests for this document must be referred to (416 SMCS/GUMAB).
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
2 2
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
B002 Operations Security (OPSEC) Plan
DI-MGMT-80934C PWS paragraph: 13.1.8 416 SCMS/GUMAB
DD
A D
1TIME
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT.
84056-5825
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN
BLDG 1215
HILL AFB, UT
84056-5825
SEE BLK 16
0 2 0
NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: Contractor's format is acceptable.
2. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://piee.eb.mil using DODAAC FA8251. MARK FOR: First Address in block 14a
b. The contractor shall submit the Operation Security (OPSEC) Plan via e-mail to the following e-mail addresses:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
3. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the OPSEC Plan NLT thirty (30) calendar days after contract award (ARO).
4. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology).
(March 2023). Other requests for this document must be referred to (416
SMCS/GUMAB).
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:47:14 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.1548
Date: 2023.03.16 09:51:48 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
B003 Production Surge Plan
DI-MGMT-80969 PWS paragraph: 13.1.9; 1.7 416 SCMS/GUMAB
DD
A D
1TIME
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT.
84056-5825
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN
BLDG 1215
HILL AFB, UT
84056-5825
SEE BLK 16
0 2 0
NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: Contractor's format is acceptable.
2. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://piee.eb.mil using DODAAC FA8251. MARK FOR: First Address in block 14a
b. The contractor shall submit the Production Surge Plan via e-mail to the following e-mail addresses:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
3. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the Production Surge Plan NLT ninety (90) calendar days after contract award (ARO).
4. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology).
(March 2023). Other requests for this document must be referred to (416
SMCS/GUMAB).
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:48:31 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.1548
Date: 2023.03.16 09:53:03 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
B004 Item Unique Identification (IUID) Marking Plan IUID Marking Plan
DI-MGMT-81803A PWS paragraph: 13.1.10; 5.0 416 SCMS/GUMAB
DD
A D
ONE/R
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT.
84056-5825
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN
BLDG 1215
HILL AFB, UT
84056-5825
SEE BLK 16
DCMA 1
0 3 0
NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: Contractor's format is acceptable using Microsoft Office compatible products (Word, Power point) or Adobe Portable Document Format (PDF).
2. Blocks 7, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://piee.eb.mil using DODAAC FA8251. MARK FOR: First Address in block 14a
b. The contractor shall submit the IUID Marking Plan via e-mail to the following e-mail addresses:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
3. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the IUID Plan as required NLT sixty (60) days after contract award. The Government will review and provide comments NLT ten (10) business days following receipt. The contractor shall then have ten (10) business days to make correction(s) and resubmit if requested.
4. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:49:29 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.1548
Date: 2023.03.16 09:54:43 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology). (March 2023). Other requests for this document must be referred to (416 SMCS/GUMAB).
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
B005 Counterfeit Production Plan CPP
DI-MISC-81832/T PWS paragraph: 13.1.11 416 SCMS/GUMAB
DD
A D
ONE/R
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT.
84056-5825
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN Bldg. 1215 Hill AFB, UT.
84056-5825
0 2 0
NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: Contractor's format is acceptable.
2. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://piee.eb.mil using DODAAC FA8251. MARK FOR: First Address in block 14a
b. The contractor shall submit the Counterfeit Prevention Plan via e-mail to the following e-mail address:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
3. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the Counterfeit Prevention Plan (CPP) NLT thirty (30) calendar days after contract award. The Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. The contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments if requested.
4. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology).
(March 2023). Other requests for this document must be referred to (416
SMCS/GUMAB).
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:50:42 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.1548
Date: 2023.03.16 09:56:48 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0002 B MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export
| Both Signed B001 FD2020-23-00006 SCRM Plan |
| Both Signed B002 FD2020-23-00006 OPSEC Plan |
| Both Signed B003 FD2020-23-00006 Production Surge Plan |
| Both Signed B004 FD2020-23-00006 IUID Plan (002) |
| Both Signed B005 FD2020-23-00006 Counterfeit Prevention Plan |
File details come from the government source that posted it. Updated .