CDRLs_A.pdf
PDF 172 KB Posted
- Attached to
- F-16 Commercial Fire Control Computer Repairs
- Solicitation number
- FA825123R0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA825123R0007 - Rev2.pdf | ||
| CFCC_Pricing_Structures.xlsx | XLSX spreadsheet | |
| 20230320_PWS_CFCC_Final.pdf | ||
| 254_Security_Classification.pdf | ||
| Packaging_SOW.pdf | ||
| DRILS_Technician_Guide.pdf | ||
| Transportation_Data.pdf | ||
| Packaging_Requirements.pdf | ||
| FA825123R0007.pdf | ||
| CAV_AF_SOW.pdf | ||
| Wage_Determination.pdf | ||
| SCRM Evaluation Criteria.pdf | ||
| CDRLs_B.pdf | ||
| IUID.pdf | ||
| ITEM_DESCRIPTION.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0001 A MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
A001 Commercial Asset Visibility Air Force (CAV AF)/Government Furnished Material Report
GFM End Item Reporting
DI-MGMT-81634C PWS Paragraph: 13.1.1 416 SCMS/GUMAB
DD
A N/A
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT 84056-5825
SEE BLK 16
0 1 0
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Blocks 7, 8, 14:
a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.
b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) upon completion of delivery order. Report shall be submitted electronically via the Internet to iRAPT (WAWF) website address:
https://piee.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.
2. Block 10: The Contractor reporting requirements to CAV AF shall be accomplished daily and/or one business day of maintenance action IAW Contractor Users Guide and the CAV AF Reporting Requirements Document..
3. Block 11: Data shall be current within one (1) business day of last End Item maintenance occurrence and reflect an accurate representation/status of all assets at a contractor for repair.
4. Block 12: Date of first submission shall be within one business day following a maintenance transaction after the contract award date and Government training as specified IAW CAV AF Users Guide.
5. Block 13: Date of subsequent submittal(s) shall be within one (1) business day of each End Item maintenance action/occurrence.
NSP
0.00
16 Mar 2023 16 Mar 2023
1 1
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:30:11 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.1548
898737 Date: 2023.03.16 09:37:36 -06'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0001 A PSSS
Commercial Fire Control Computer FD2020-23-00006 BAE
A002 Contract Depot Maintenance (CDM) Monthly Production Report
CDM Production Monthly Status Report
DI-PSSS-81995A PWS Paragraph: 13.1.2 416 SCMS/GUMAB
LT
N/A D
MTHLY
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT 84056-5825
AFMC PZABB/ 1
6050 Gum LN Bldg 1215 Hill AFB, UT.
84056-5825
SEE BLK 16
0 2 0
Note: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to the
CDRL.
1. Block 4: Format shall be provided in the format of Table I from DID
(DI-PSSS-81995A).
2. Blocks 10, 11, 12, 13:
a. The reports shall be provided monthly within 10 (Ten) business days of the previous month's last calendar date.
b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the 416 SCMS/GUMAB Logistic Management Specialist (LMS) or the Supply Planner (SP),
c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report"
3. Block 7, 14: The Contractor shall submit the CDM Production Monthly Status Reports via email to:
michelle.nickerson@us.af.mil braum.barton@us.af.mil tammy.mota@us.af.mil christian.barwick@us.af.mil
4. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24
The following Distribution Statement shall be placed on sheet one of each document and/or associated lists.
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology).
(March 2023). Other requests for this document must be referred to (416
SMCS/GUMAB).
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:31:57 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.154
8898737 Date: 2023.03.16 09:39:55 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0001 A PSSS
Commercial Fire Control Computer FD2020-23-00006 BAE
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
2 2
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0001 A MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
A003 Government Property (GP) Inventory Report Annual Government Property Physical Inventory Report
DI-MGMT-80441D PWS Paragraph: 13.1.3; 8.0 416 SCMS/GUMAB
LT
N/A D
ANNLY
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Hill AFB, UT 84056-5825
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN.
Bldg. 1215 Hill AFB, UT.
84056-5825
0 2 0
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 7, 14: The Contractor shall submit a letter of Transmittal (LT) and the Annual Government Property Inventory Report via email to the following email addresses:
michelle.nickerson@us.af.mil braum.barton@us.af.mil tammy.mota@us.af.mil christian.barwick@us.af.mil
2. Block 9: Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24
The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology).
(March 2023). Other requests for this document must be referred to (416
SMCS/GUMAB).
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties.
Disseminate IAW provisions of DoD Directive 5230.25.
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.
1255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:33:32 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.154
Date: 2023.03.16 09:40:54 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0001 A MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
3. Blocks 10, 11, 12, 13:
a. This report shall be provided annually. Reporting Period is one year from Basic Contract award date and annually thereafter.
b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.
c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I.APPROVED BY J. DATE
Page of Pages
0001 A MISC
Commercial Fire Control Computer FD2020-23-00006 BAE
A004 Maintenance Data Collection Record (MDCR) Defense Repair Information Logistics System (DRILs)
DI-MISC-82003/T PWS Paragraph: 13.1.4 416 SCMS/GUMAB
LT
N/A N/A
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum LN Bldg. 1213 Attn:
Program Mgr Hill AFB, UT 84056-5825
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN.
Bldg. 1215 Hill AFB, UT.
84056-5825
0 2 0
1. NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
2. Block 4: See Defense Repair Information Logistics System (DRILS) Technician Guide for instruction.
3. Blocks: 7, 8, 14: The contractor shall submit a Letter of Transmittal (LT) on the last day of the month in which transactions occurred, covering all reports transmitted electronically for the preceding month. The Letter of Transmittal (LT) shall be submitted via email to the following email address:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
4. Block 9: No Distribution Statement is required as data shall be entered into DRILS, a maintenance data database. Reference DRILS Field Technician Guide dated, 2003.
5. Blocks: 10,11,12,13:
a. Data Shall be generated by the contractor when maintenance is accomplished.
b. Data shall be entered into DRILS as the data is generated in real time.
NSP
0.00
16 Mar 2023 16 Mar 2023
1 1
O'DELL.KRISTIN.M.1
255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:37:31 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.154
Date: 2023.03.16 09:42:10 -06'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0001 A MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
A005 Status Report Monthly Status Report
DI-MGMT-80368A PWS Paragraph: 13.1.5; 1.5.10 416 SCMS/GUMAB
LT
A D
MTHLY
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum Lane Bldg. 1213 Attn:
Log. Mgt.
Specialist (LMS) Hill AFB, UT 84056-5826
SEE BLK 16
AFMC PZABB/ 1
6050 Gum LN.
Bldg. 1215 Hill AFB, UT.
84056-5825
0 2 0
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: The Contractor's electronic format, Microsoft Excel version .xlsx, is acceptable.
2. Block 14: The contractor shall submit the Monthly Status Report via e-mail to the following e-mail address:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
3. Blocks: 10, 11, 12, 13:
a. The first Monthly Status Report shall be submitted no later than thirty (30) calendar days after Contract award.
b. Subsequent reports shall be submitted on the fifth (5th) calendar day of each following month,
4. Block 9: The Distribution Statement and Export Control Warning shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on sheet one of each document and/or associated lists.
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology).
(March 2023). Other requests for this document must be referred to (416
SMCS/GUMAB).
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties.
Disseminate IAW provisions of DoD Directive 5230.25.
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.
1255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:39:21 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.1
548898737 Date: 2023.03.16 09:46:56 -06'00'
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0001 A MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
A006 Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
IUID Marking Activity & Verification Report
DI-MGMT-81804A PWS Paragraph: 13.1.6; 5.0 416 SCMS/GUMAB
DD
A D
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
416 SCMS/ 1
GUMAB
6070 Gum Lane Bldg. 1213 Hill AFB, UT.
84056-5826
DCMA 1
AFMC PZABB/ 1
6050 Gum LN.
Bldg. 1215 Hill AFB, UT.
84056-5825
SEE BLK 16
0 3 0
NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4: Contractor's electronic format is acceptable using Microsoft Excel version .xlsx or Adobe Portable Document Format (PDF).
2. Blocks 7, 8, 14:
a. The contractor shall submit DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://piee.eb.mil using DODAAC FA8251. MARK FOR: Address in block 14a
b. DMCA inspector/acceptor may request a hard copy at the contractor's facility during the time of inspection and acceptance.
c. The contractor shall submit the IUID Marking Report via e-mail to the following e-mail address:
michelle.nickerson@us.af.mil christian.barwick@us.af.mil
3. Blocks 8, 10, 11, 12, 13: First submission of information due NLT ninety (90) Calendar days after contract award and monthly thereafter. DCMA will review and provide comments in coordination with the F-16 CFCC Program Office NLT seven (7) calendar days following receipt. Final report is due NLT seven (7) business days after receipt and incorporation of DCMA comments.
4. Block 9: Distribution Statement amd Export Control Warning shall be IAW DoD Instruction 5230.24.
The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.
NSP
0.00
16 Mar 2023 16 Mar 2023
1 2
O'DELL.KRISTIN.M.
1255785679
Digitally signed by
O'DELL.KRISTIN.M.1255785679
Date: 2023.03.16 08:43:30 -06'00'
NICKERSON.MICHELL
E.SUZAN.1548898737
Digitally signed by
NICKERSON.MICHELLE.SUZAN.15
48898737 Date: 2023.03.16 09:48:59 -06'00'
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
Page of Pages
0001 A MGMT
Commercial Fire Control Computer FD2020-23-00006 BAE
DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology). (March 2023). Other requests for this document must be referred to (416 SMCS/GUMAB).
EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that are determined to contain export-controlled technical data, shall be marked with the following statement:
WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
| both signed A001 FD2020-23-00006GFM CAVAF End Item Report |
| both Signed A002 FD2020-23-00006 CDM Production Report |
| Both Signed A003 FD2020-23-00006 Annual Inventory |
| Both Signed A004 FD2020-23-00006 Maintenance Data Collection Record (DRILs) |
| Both Signed A005 FD2020-23-00006 Monthly Status Report |
| Both Signed A006 FD2020-23-00006 IUID Validation and Verification Report |
File details come from the government source that posted it. Updated .