CDRLs_26RK069.pdf

PDF 529 KB Posted

Attached to
5935 - 01-678-7255 SWA5 MK48 Torpedo Receptacle (Ethernet)
Solicitation number
N0010426RK069
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423-1) specifying four data items required for delivery under a Naval contract for system 4T 5935-01-678-7255 (SWA5), with the requiring office identified as NUWC Newport. The contract line item is 0001AA, and all submissions are designated for distribution to NAVSUP Weapon Systems Support, NAVSUP Ammunition Logistics Center, and Naval Surface Warfare Center.

The four required data items are: (1) A001 – Test Procedure, submitted one time within 30 days of contract award, establishing process control instructions and inspection procedures aligned with ISO 9001 and ASQC Q9000 series standards, including first article and production lot quality conformance inspection procedures per DI-NDTI-80603A; (2) A002 – Test/Inspection Report for pre-production and production testing, submitted per lot no later than 15 days after first article test completion and for subsequent lots no later than 15 days after lot acceptance testing, verifying production lot conformance to drawings, specifications, and contract requirements and including material certifications and objective quality evidence; (3) A003 – Failure Analysis/Corrective Action Report per DI-SESS-80255B Section E, submitted on an as-needed basis with interim reports due within 10 days of lot failure notification and final reports due within 30 days; and (4) A004 – Contractor's Progress, Status and Management Report per DI-MGMT-81928, submitted monthly via mail or email on or before the 5th day of each month after contract award. All data items require draft and final versions with one copy each to be submitted to the specified distribution addresses. The form was prepared and approved on 5/9/2025 by Richard Rzomp and John Knecht, respectively.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A.CONTRACT LINE ITEM NO.

0001AA B. EXHIBIT

C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

4T 5935-01-678-7255 (SWA5)

E. CONTRACT/PR NO.

F. CONTRACTOR

1.DATA ITEM NO.

A001

2.TITLE OF DATA ITEM

Test Procedure

3.SUBTITLE

17.PRICE GROUP

4.AUTHORITY (Data Acquisition Document No.) 5.CONTRACT REFERENCE

6.REQUIRING OFFICE 18.ESTIMATED

TOTAL PRICE

DI-NDTI-80603A ALL DRAWINGS NUWC NEWPORT

7.DD250 REQ

SD

9.DIST STATEMENT

REQUIRED

10.FREQUENCY

ONE TIME

12.DATE OF FIRST

SUBMISSION

14.DISTRIBUTION

D

30 DAC

a. ADDRESSEE

b. COPIES

8.ADP CODE

A

11.AS OF

DATE

13.DATE OF SUBSEQUENT

Draft

Final

Reg Repro

16.REMARKS SEE BLOCK 16 0 1 0

THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION

PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,

SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ISO 9001 AND ASQC Q9000

SERIES. THE PLAN IS TO INCLUDE FIRST ARTICLE AND PRODUCTION LOT

QUALITY CONFORMANCE INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG

WITH ALL APPLICABLE DATA ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS

INSPECTIONS.

BLK 14: DISTRIBUTION ADDRESS

1. NAVSUP Weapon Systems Support

2. NAVSUP Ammunition Logistics Center

3. Naval Surface Warfare Center

POC Information: See Section H

15.TOTAL 0 1 0

G. PREPARED BY:

Richard Rzomp

H. DATE

5/9/2025

I. APPROVED BY:

John Knecht

J. DATE

5/9/2025

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 4 Pages

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR

0001AA B.EXHIBIT

C.CATEGORY:

D. SYSTEM/ITEM

E.CONTRACT/PR NO.

F.CONTRACTOR

A002

2.TITLE OF DATA ITEM

Test/Inspection Report

3.SUBTITLE

Pre-Production & Production Test

DI-NDTI-80809B NOTICE 2 ALL DRAWINGS NUWC NEWPORT

SD

REQUIRED

10.FREQUENCY

PER LOT

SEE BLOCK 16

a. ADDRESSEE

b. COPIES

8.ADP CODE

16.REMARKS SEE BLOCK 16 0 1 0

THE REPORT IS TO VERIFY PRODUCTION LOT CONFORMANCE TO THE APPLICABLE

DRAWINGS, SPECIFICATIONS, AND CONTRACT REQUIREMENTS. THE REPORT

CONSISTS OF THE PLAN (A001) CONTAINING ALL REQUIRED INSPECTION

RESULTS DOCUMENTED ON THE PLAN’S DATA ENTRY SHEETS. IN ADDITION, THE

REPORT IS TO INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT

OBJECTIVE QUALITY EVIDENCE. THE REPORT MUST BE APPROVED BY NAVSUP

WSS CONTRACTING OFFICER BEFORE FINAL ACCEPTANCE OF THE LOT.

BLK 12: DATE OF PRE-PRODUCTION TEST REPORT SUBMISSION – NLT 15 DAYS

AFTER FIRST ARTICLE TEST COMPLETION.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 15 DAYS AFTER LOT

ACCEPTANCE TESTING OF SECOND LOT AND BEYOND.

Richard Rzomp

H. DATE

5/9/2025

I. APPROVED BY:

John Knecht

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 4 Pages

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR

D. SYSTEM/ITEM

A003

2.TITLE OF DATA ITEM

Failure Analysis/Corrective Action Report

DI-SESS-80255B Section E NUWC NEWPORT

LT

REQUIRED

10.FREQUENCY

SEE BLOCK 16

12.DATE OF FIRST

a. ADDRESSEE

SEE BLOCK 16 Reg Repro

16.REMARKS SEE BLOCK 16 0 1 0

BLK 5: INCLUDE AND TAKE ACTION ON SECTION I IF FAT IS REQUIRED.

BLK 10: FREQUENCY - IS DETERMINED BY NUMBER OF FAT/LAT FAILURES.

BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT IS DUE NLT

10 DAYS AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT IS DUE 30

DAYS AFTER NOTIFICATION OF LOT FAILURE.

BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS AFTER FAT

COMPLETION OF SECOND FAILED LOT AND BEYOND.

Richard Rzomp

H. DATE

5/9/2025

I. APPROVED BY:

John Knecht

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 4 Pages

The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR

D. SYSTEM/ITEM

A004

2.TITLE OF DATA ITEM

Contractor’s Progress, Status and Management Report

DI-MGMT-81928 NOTICE 2 SEE BLOCK 16 NUWC NEWPORT

LT

REQUIRED

10.FREQUENCY

MTHLY

SEE BLOCK 16

SEE BLOCK 16

a. ADDRESSEE

SEE BLOCK 16

16.REMARKS SEE BLOCK 16 0 1 0

BLK 12, 13: The report shall be submitted via mail or email on or before the 5th day of each month after contract award.

BLK 14. DISTRIBUTION ADDRESS

Richard Rzomp

H. DATE

5/9/2025

I. APPROVED BY:

John Knecht

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 4 Pages