About this file

This document is a Contract Data Requirements List (CDRL) for a Production Surge Plan Capability Analysis Plan (CAP) associated with a contract for F100-PW-229 Multiple Items. The CDRL (Data Item A007) is for the 421 SCMS/GUMA office at Tinker AFB and addresses surge production capabilities in the event of an unplanned spike in demand due to major theater warfare or national emergency. The plan requires the contractor to submit a detailed delivery schedule within 30 days of contract award, demonstrating the maximum sustainable rate of delivery for contract items. The plan must outline surge capacity both at no additional cost and at potential additional cost, with the possibility of mutually agreeing to increase supply quantities by a negotiated percentage. The document is approved for unlimited public and foreign distribution, with digital signatures dated 30 June 2025.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER

Form Approved OMB No. 0704-0188

15. TOTAL

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

DIST

22202-4302.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

X

F100-PW-229 / Multiple Items FD20302401213

A007 Production Surge Plan Capability Analysis Plan (CAP)

DI-MGMT-80969 PWS 421 SCMS/GUMA

LT

A A

See Block 16

See Block 16

See Block 16

See Block 16

421 SCMS/GUMA 0 1 0

Requiring Office 3001 Staff Drive, Annex 4 Tinker AFB Oklahoma 73145 Attention:

James Brand

0 0

THIS CDRL WILL SERVE BASIC YEARS AND ALL ORDERING PERIODS.

In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.

Block 9: Approved for Unlimited Public and Foreign Distribution.

Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award. This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract. This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor’s existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.

GUTHRIE.VICKI.LY

NN.1275308052

Digitally signed by

GUTHRIE.VICKI.LYNN.1275308052

Date: 2025.06.30 11:31:03 -05'00'

30 June 2025 DOBBINS.MICHELLE.

ELYSE.1544226858

Digitally signed by

DOBBINS.MICHELLE.ELYSE.15442

26858 Date: 2025.06.30 12:48:38 -05'00'

30 June 2025

1 1