CDRL for N00173-22-Q-TL14.pdf
PDF 514 KB Posted
- Attached to
- COMPACT RANGE POSITIONING SYSTEM Federal contract opportunity
- Solicitation number
- N00173-22-Q-tl14
About this file
This is a request for quotation (RFQ) from the Department of the Navy for the delivery, installation, start-up, and integration of a commercially available compact range positioning system. The Navy seeks to procure motorized floor slides, azimuth positioners, offset slide axes, model towers, elevation positioners, azimuth over elevation positioners, feed positioning systems, positioner controllers, local control units, cables, RF absorber treatment, software, system engineering and analysis, cable management plans, removal and disposal services, installation services, and field probing through this competitive procurement. Quotes are due within 30 days of August 2022, with installation to occur within 15 days of equipment delivery. The Navy will evaluate quotes based on technical capability, past performance, and price reasonableness to select the best-suited contractor without exchanges, though limited exchanges may occur. Award will be firm-fixed-price. The solicitation incorporates various FAR and DFARS provisions and clauses. The DPAS rating is DO-C9.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 2 to N00173-22-Q-TL14.pdf | ||
| AMENDMENT 1 to N00173-22-Q-TL14.pdf | ||
| CSS N00173-22-Q-TL14 POSITIONING SYSTEM - FINAL.pdf | ||
| SOW_CPP_PositioningSystem - FINAL.pdf | ||
| Requirements for On-Site Contractors_May 2022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
001 A X
Positioning equipment
A001 Cable Management Plan N/A
N/A SOW Sec. V.C.2 NRL Code 5317
N/A D
SEE BLK 16
30DPTT
10DPTT
COR, Code 5317 1 1
1 1 0
Vendor format is acceptable.
Blocks 11, 12, 13: The Contractor shall submit a draft Cable Management Plan for Government approval not less than thirty (30) days prior to the beginning of installation.
The Contractor shall document the test results in a Developmental Test Report for Performance Validation .
The contractor shall provide a cable management plan that provides their plan to use cable carries, rotary joints, and any additional hardware required to protect all positioner control cables and existing RF cables from damage under movement.
The Government requires ten (10) calendar days to review the draft Cable Management Plan and provide comments. The Contractor shall submit the final Cable Management Plan including and resolving all Government comments not less than ten (10) calendar days prior to the first test.
Block 14: Document shall be in electronic format (MS Word or Adobe PDF file).
Hard copies will not be accepted.
The Government retains approval rights.
DORSEY.WILLIAM.MARK.12395
23176
Digitally signed by
DORSEY.WILLIAM.MARK.1239523176
Date: 2022.08.04 07:12:03 -04'00'
08/04/2022
Adobe Professional 8.0
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
002 A
Positioning equipment
A002
2. TITLE OF DATA ITEM
Field Probing Report N/A
N/A SOW Sec. V.C.5 NRL Code 5317
N/A D
SEE BLK 16
14D
24D NRL Code 5317 1 1
1 1 0
Vendor format is acceptable.
Blocks 11, 12, 13: The Contractor shall submit a draft Quiet Zone Characterization Report for Government approval not less than fourteen (14) days after the conclusion of installation of equipment and absorber. The Contractor shall document the test results in a Developmental Test Report for Performance Validation.
The contractor shall provide a quiet zone characterization report that provides measured results of the amplitude and phase distribution within the quiet zone at specified frequencies.
The Government requires ten (10) calendar days to review the draft Quiet Zone Characterization Report and provide comments. The Contractor shall submit the final Quiet Zone Characterization Report including and resolving all Government comments not less than ten (10) calendar days after testing is completed.
Block 14: Document shall be in electronic format (MS Word or Adobe PDF file).
The Government retains approval rights.
DORSEY.WILLIAM.MARK.12395
23176
Digitally signed by
DORSEY.WILLIAM.MARK.1239523176
Date: 2022.08.04 07:16:17 -04'00'
08/04/2022
Adobe Professional 8.0
File details come from the government source that posted it. Updated .