CDRL Exhibit B.pdf
PDF 284 KB Posted
- Attached to
- Weld Studs
- Solicitation number
- SPMYM321Q6010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROC Notes.docx | DOCX document | |
| CDRL Exhibit C.pdf | ||
| 252.204-7019 NOT COTS.docx | DOCX document | |
| 252.204-7016.docx | DOCX document | |
| Attachment 1 Special Stud Table.pdf | ||
| 52.204-24.docx | DOCX document | |
| CDRL Exhibit D.pdf | ||
| Local Clauses.docx | DOCX document | |
| Combined Synopsis Solicitation 6010 10134001 without drawings.docx | DOCX document | |
| 52.204-25.docx | DOCX document | |
| 52.204-26.docx | DOCX document | |
| CDRL Exhibit A.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
245.2J-1602-20 (2 DATA ITEMS)
A. CONTRACT LINE ITEM NO. B. EXHIBIT
B
C. CATEGORY
TDP ____X___ TM ______ OTHER______
D. SYSTEM/ITEM
Weld Studs
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE of DATA ITEM
CERTIFICATE OF COMPLIANCE
3. SUBTITLE
CERTIFICATION OF
QUALITY COMPLIANCE
4. AUTHORITY(DATA Item Description Number)
DI-MISC-81356A
5. CONTRACT REFERENCE
SECTION C. 2
6. REQUIRING OFFICE
CODE 245
7. DD 250 REQ
DD
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
One Time
12.DATE OF 1st
SUBMISSION
WITH MATERIAL
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
8. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENCE
SUBMISSION
N/A
REG REP
RO
CODE 133.2 0 1 0
16. REMARKS
1. Technical content as described in the respective contract line item(s).
2. For payment & submission of data refer to clauses 252.232-7006 &
252.232-7003 or 52.232-36. Each data item submitted by vendor must be submitted under a separate shipment number.
15. TOTAL 0 1 0
1. DATA ITEM NO.
B002
2. TITLE of DATA ITEM
CERTIFICATION / DATA REPORT
3. SUBTITLE
CHEMICAL & MECHANICAL
CERTIFICATION
4. AUTHORITY
DI-MISC-80678
5. CONTRACT REFERENCE
SECTION: C. 3
6. REQUIRING OFFICE
CODE 245
7. DD 250 REQ
DD
9. DIST
STATEMENT
REQUIRED
A
10 FREQUENCY
One Time
12. DATE OF 1st
SUBMISSION
WITH MATERIAL
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
8. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENCE
SUBMISSION
N/A
REG REP
RO
CODE 133.2 0 1 0
16 REMARKS
1. 1. Paragraphs 10.2.2, 10.2.3 & 10.4 of DI-MISC-80678 do not apply.
2. Technical content as described in the respective contract line item(s).
3. This certification shall contain the actual test results of all chemical & mechanical test(s) required by the specification
4. The test result(s) shall be quantitative & in the units required by the specification.
5. For payment & submission of data refer to clauses 252.232-7006 &
252.232-7003 or 52.232-36. Each data item submitted by vendor must be submitted under a separate shipment number.
15. TOTAL 0 1 0
DD FORM 1423-1 (FACSIMILE) PAGE 2 of 2
SPMYM321P6010
245.2J-1602-20 (2 DATA ITEM)
A. CONTRACT LINE ITEM NO. B. EXHIBIT
B
C. CATEGORY
TDP X TM ______ OTHER______
D. SYSTEM/ITEM
Weld Studs
E. CONTRACT/PR NO.
SPMYM321P6010
F. CONTRACTOR
3. DATA ITEM NO.
B003
4. TITLE of DATA ITEM
NDT (PT) PROCEDURE APPROVAL
5. SUBTITLE
PROCEDURE (PT)
6. AUTHORITY(DATA Item Description Number)
UDI-T-23732B
7. CONTRACT REFERENCE
SECTION C. 4
8. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
LT
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
One Time
12. DATE OF 1st
SUBMISSION
PRIOR TO ANY PT
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
8. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
N/A
REG REPRO
CODE-135T 0 1 0
16 REMARKS
- VENDOR’S PT PROCEDURE IAW NAVSEA TECH PUB’S T9074-AS-GIB-
010/271 REV-1 AND S9074-AR-GIB-010/278 WITH ACCEPTANCE CRITERIA
PER NOTE 20 OF DRAWING 6551144 REV. R. VENDOR IS TO SUBMIT THEIR
PROCEDURE TO PNS CODE 135T FOR REVIEW AND APPROVAL PRIOR TO
PERFORMING ANY PT INSPECTIONS.
15. TOTAL 0 1 0
1.DATA ITEM NO.
B004
2 TITLE of DATA ITEM
TEST/ INSPECTION REPORT
3. SUBTITLE
PT RESULTS / REPORT
4. AUTHORITY
DI-NDTI-80809B
5. CONTRACT REFERENCE
SECTION C. 5
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
One Time
12. DATE OF 1st
SUBMISSION
W/ MATERIAL
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
9. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
N/A
REG REPRO
CODE-133.2 0 1 0
16 REMARKS
- DELETE PARA #’S 10.2.2, 10.2.3.1, 10.2.4, 10.2.5, 10.2.6.1, 10.2.6.2, 10.2.6.3, 10.2.6.4.2, 10.2.6.5 AND 10.2.6.6 OF DI-NDTI-80809B.
- VENDOR’S PT INSPECTION RESULTS PER NAVSEA TECH PUB T9074-AS- GIB-
010/271 REV-1 WITH ACCEPTANCE CRITERIA PER NOTE 20 OF DRAWING
6551144 REV R. PNS CLAUSE C.512 AND DI-NDTI-80809B APPLY.
15. TOTAL 0 1 0
DD FORM 1423-1 (FACSIMILE) PAGE 2 of 2
A. CONTRACT LINE ITEM NO. B. EXHIBIT
B
C. CATEGORY
TDP X TM ______ OTHER______
D. SYSTEM/ITEM
Weld Studs
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE of DATA ITEM
NDT (UT) PROCEDURE APPROVAL
3. SUBTITLE
PROCEDURE (UT)
4. AUTHORITY(DATA Item Description Number)
UDI-T-23732B
5. CONTRACT REFERENCE
SECTION C. 6
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
LT
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
One Time
12. DATE OF 1st
SUBMISSION
PRIOR TO ANY UT
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
10. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
N/A
REG REPRO
CODE-135T 0 1 0
16 REMARKS
- VENDOR’S UT PROCEDURE IAW NAVSEA TECH PUB’S T9074-AS-GIB-
010/271 REV-1 AND S9074-AR-GIB-010/300 WITH ACCEPTANCE CRITERIA
PER T9074-BD-GIB-010/300. VENDOR IS TO SUBMIT THEIR PROCEDURE TO
PNS CODE 135T FOR REVIEW AND APPROVAL PRIOR TO PERFORMING
ANY UT INSPECTIONS.
15. TOTAL 0 1 0
1.DATA ITEM NO.
B006
2 TITLE of DATA ITEM
TEST/ INSPECTION REPORT
3. SUBTITLE
UT RESULTS / REPORT
4. AUTHORITY
DI-NDTI-80809B
5. CONTRACT REFERENCE
SECTION C. 7
7. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
One Time
12. DATE OF 1st
SUBMISSION
W/ MATERIAL
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
11. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
N/A
REG REPRO
CODE-133.2 0 1 0
17 REMARKS
- DELETE PARA #’S 10.2.2, 10.2.3.1, 10.2.4, 10.2.5, 10.2.6.1, 10.2.6.2, 10.2.6.3, 10.2.6.4.2, 10.2.6.5 AND 10.2.6.6 OF DI-NDTI-80809B.
- VENDOR’S UT INSPECTION RESULTS IAW NAVSEA TECH PUB’S T9074-AS-
GIB-010/271 REV-1 WITH ACCEPTANCE CRITERIA PER T9074-BD-GIB-010/300. 15. TOTAL 0 1 0
DD FORM 1423-1 (FACSIMILE) PAGE 3 of 4
SPMYM321P6010
A. CONTRACT LINE ITEM NO. B. EXHIBIT
B
C. CATEGORY
TDP X TM ______ OTHER______
D. SYSTEM/ITEM
Weld Studs
E. CONTRACT/PR NO.
SPMYM321P6010
F. CONTRACTOR
1. DATA ITEM NO.
B007
2. TITLE of DATA ITEM
WELDABILITY TEST - PROCEDURE APPROVAL
3. SUBTITLE
PROCEDURE (WELDABILITY)
4. AUTHORITY(DATA Item Description Number)
UDI-T-23732B
5. CONTRACT REFERENCE
SECTION C. 8
6. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
LT
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
One Time
12. DATE OF 1st
SUBMISSION
PRIOR TO ANY
WELDING
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
12. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
N/A
REG REPRO
CODE-138.2 0 1 0
16 REMARKS
- VENDOR’S WELDING PROCEDURE IAW NAVSEA TECH PUB’S T9074-AS-
GIB-010/271 REV-1 WITH ACCEPTANCE CRITERIA PER NOTE 18 OF DWG
655144 – REV-R(MIL-STD-1252). VENDOR IS TO SUBMIT THEIR PROCEDURE
TO PNS CODE 138.2 FOR REVIEW AND APPROVAL PRIOR TO PERFORMING
ANY WELDING.
15. TOTAL 0 1 0
1.DATA ITEM NO.
B008
2 TITLE of DATA ITEM
TEST/ INSPECTION REPORT
3. SUBTITLE
WELDABILITY RESULTS / REPORT
4. AUTHORITY
DI-NDTI-80809B
5. CONTRACT REFERENCE
SECTION C. 9
8. REQUIRING OFFICE
PURCHASING ACTIVITY
7. DD 250 REQ
DD
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
One Time
12. DATE OF 1st
SUBMISSION
W/ MATERIAL
14. DISTRIBUTION
a. ADDRESSEE b. COPIES
DRAFT FINAL
13. APP. CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
N/A
REG REPRO
CODE-133.2 0 1 0
18 REMARKS
- DELETE PARA #’S 10.2.2, 10.2.3.1, 10.2.4, 10.2.5, 10.2.6.1, 10.2.6.2, 10.2.6.3, 10.2.6.4.2, 10.2.6.5 AND 10.2.6.6 OF DI-NDTI-80809B.
- VENDOR’S WELDING INSPECTION RESULTS IAW NAVSEA TECH PUB’S
T9074-AS-GIB-010/271 REV-1 WITH ACCEPTANCE CRITERIA PER NOTE 18 OF
DGW 655144 – REV-R(MIL-STD-1252).
15. TOTAL 0 1 0
G. PREPARED BY
/S/ STEPHEN THYNG 245.2J
H. DATE
01/13/2021
I. APPROVED BY 245.2 J. DATE
01/19/21
DD FORM 1423-1 (FACSIMILE) PAGE 4 of 4
File details come from the government source that posted it. Updated .