CDRL EXHIBIT A INSPECTION AND TEST PLAN.pdf
PDF 384 KB Posted
- Attached to
- BAR METAL ROUND LEVEL 1 Federal contract opportunity
- Solicitation number
- SPMYM225Q0383
About this file
This is a Contract Data Requirements List (CDRL) Form DD 1423-1 for an Inspection and Test Plan related to a metal bar (NIIN: 00-128-0711L1) procurement. The CDRL requires suppliers of Level I/SUBSAFE (LI/SS) material to submit their quality management systems manual to the Procurement Contracting Officer prior to contract award.
Key details include: Distribution is limited to DoD and DoD contractors only (Distribution Statement D); the requiring office is the Purchasing Activity; and no WAWF submittal is required after award. The document uses DI-QCIC-81110 as the authority reference and specifies that paragraph 10.4 of that document does not apply. The form indicates one final copy is required for addressee N4523A, with no draft copies needed. The document is dated November 20, 2024 and is approved by both Robert Reed and Nicole Martinez.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPMYM225Q0383 00004.pdf | ||
| SPMYM225Q0383 TDP.pdf | ||
| SPMYM225Q0383 00003.pdf | ||
| CDRL EXHIBIT B CERTIFICATION DATA REPORT.pdf | ||
| CDRL EXHIBIT D TEST INSPECTION REPORT ULTRASONIC.pdf | ||
| CDRL EXHIBIT E TEST AND INSPECTION REPORT LIQ PENETRANT.pdf | ||
| TDP SPMYM225Q0383.pdf | ||
| CDRL EXHIBIT C CERTIFICATION DATA FOR NON NUCLEAR LV1 MATERIAL.pdf | ||
| SPMYM225Q0383.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL DATA PACKAGE
NIIN: 00-128-0711L1 PAGE 12
ITEM NAME: BAR, METAL November 20, 2024
DOCUMENT NUMBER: 4313-7915
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
QCIC
D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
INSPECTION AND TEST PLAN QUALITY MANAGEMENT SYSTEMS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-QCIC-81110 TDP: Section 3 PURCHASING ACTIVITY
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD ONE/R SEE BLOCK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS N4523A 0 1 0
Paragraph 10.4 of DI-QCIC-81110 does not apply.
Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only.
Administration and operations only, effective 11/20/2024. Other U.S. requests must be referred to COMNAVSEASYSCOM.
Block 12 - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality management systems manual to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality management systems manual on file at the Procuring Activity may request the PCO waive this requirement.
**after award no submittal in WAWF is required**
Document no: 4313-7915
15. Total 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/s/ ROBERT REED 11/20/2024 /s/ NICOLE MARTINEZ 11/20/2024
DD FORM 1423-1, FEB 2001
Page 1 of 6 Pages
0002AA A
A001
File details come from the government source that posted it. Updated .