CDRL DD1423_Redacted.pdf
PDF 242 KB Posted
- Attached to
- IGNITER, MARK 288 MOD 1
- Solicitation number
- N6660426Q0472
About this file
This is a Contract Data Requirements List (CDRL) for the Igniter Assembly MK288 MOD1 contract with Pacific Scientific EMC, submitted to the Naval Undersea Warfare Center (NUWC) Division Newport. The CDRL specifies four deliverable data items required throughout contract performance.
Data Item A001 is a Test Procedure titled "Test and Inspection Plan," due 30 days after contract award (DAC). This deliverable must specify process control instructions and inspection procedures to ensure product conformance to drawings, specifications, and contract requirements in accordance with ANSI/ASQC Q9000-2000 or equivalent. The plan must include production lot quality conformance inspection procedures per DI-NDTI-80603A and all applicable data entry sheets for documenting process inspections. Data Item A002 is a Test/Inspection Report for "Pre-Production & Production Test" per DI-NDTI-80809B, submitted per lot no later than 30 days after lot acceptance testing, with subsequent submissions required no later than 30 days after testing of the second lot and beyond. This report verifies production lot conformance to applicable drawings, specifications, and contract requirements, incorporating all inspection results from the plan and material certifications, and must receive NUWC Division Newport Contracting Officer approval before final lot acceptance. Data Item A003 is a Failure Analysis/Corrective Action Report per DI-SESS-81315B, referenced to SOW Task 4.1.2, with an interim report due no later than 10 days after lot failure notification and a final report due 30 days after notification. Data Item A004 is an Ammo Data Card (ADC) per DI-MISC-80043B, referenced to SOW Task 4.2.3, prepared per MIL-STD-1168 and submitted as required, with revisions submitted when revised. All deliverables must be submitted via email to NUWC Division Newport at DoDAAC N66604, 1176 Howell Street, Newport RI 02841, with distribution to Code 85.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA N6660426Q0472_Redacted.pdf | ||
| Solicitation - N6660426Q0472_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
TDP_________ TM___________ OTHER_________________
D. SYSTEM/ITEM
IGNITER ASSEMBLY MK288 MOD1
E. CONTRACT / PR NO.
F. CONTRACTOR
PACIFIC SCIENTIFIC EMC
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM:
Test Procedure
3. SUBTITLE
Test and Inspection Plan
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
All Drawings
6. REQUIRING OFFICE
NUWC Division Newport
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
DD
9. DIST STATEMNT
REQUIRED
10. FREQUENCY
12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
D One Time 30 DAC b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQNT
SUBMISSION
a. ADDRESSEE Draft Final
A N/A N/A Reg Repro
16. REMARKS NUWC NPT Code
0 1 0
THE PLAN IS TO SPECIFY PROCESS CONTROL INSTRUCTIONS AND INSPECTION
PROCEDURES NEEDED TO ENSURE PRODUCT CONFORMANCE TO DRAWINGS,
SPECIFICATIONS, AND CONTRACT REQUIREMENTS IAW ANSI/ASQC Q9000-2000 OR
EQUIVALENT. THE PLAN IS TO INCLUDE PRODUCTION LOT QUALITY CONFORMANCE
INSPECTION PROCEDURES IAW DI-NDTI-80603A ALONG WITH ALL APPLICABLE DATA
ENTRY SHEETS TO BE USED TO DOCUMENT PROCESS INSPECTIONS.
BLK 14: The Contractor shall submit this deliverable via email to the Government Point of Contact (POC) listed below.
Distribution Address / POC:
Naval Undersea Warfare Center (NUWC), Division Newport DoDAAC: N66604 1176 Howell Street, Newport RI 02841
. TOTAL
G. PREPARED BY:
H. DATE
7/10/2026
I. APPROVED BY
J. DATE
DD Form 1423-1, Feb 2001 Previous Edition May be Used Page _ _ of _ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM:
Test/Inspection Report
3. SUBTITLE
Pre-Production & Production Test
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
All Drawings
6. REQUIRING OFFICE
NUWC Division Newport
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
DD
9. DIST STATEMNT
14. DISTRIBUTION
D Per Lot See Block 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQNT
SUBMISSION
a. ADDRESSEE Draft Final
N/A See Block 16 Reg Repro
16. REMARKS NUWC NPT
Code 85
0 1 0
THE REPORT IS TO VERIFY PRODUCTION LOT CONFORMANCE TO THE APPLICABLE
DRAWINGS, SPECIFICATIONS AND CONTRACT REQUIREMENTS. THE REPORT
CONSISTS OF THE PLAN (A001) CONTAINING ALL REQUIRED INSPECTION RESULTS
DOCUMENTED ON THE PLAN’S DATA ENTRY SHEETS. IN ADDITION, THE REPORT IS TO
INCLUDE MATERIAL CERTIFICATIONS AND ALL OTHER PERTINENT OBJECTIVE QUALITY
EVIDENCE. THE REPORT MUST BE APPROVED BY NUWC DIVISION NEWPORT
CONTRACTING OFFICER BEFORE FINAL ACCEPTANCE OF THE LOT.
BLK 12 & 13: DATE OF SUBSEQUENT SUBMISSION – NLT 30 DAYS AFTER LOT
ACCEPTANCE TESTING OF SECOND LOT AND BEYOND.
BLK 14: The Contractor shall submit this deliverable via email to the Government Point of Contact (POC) listed below.
Distribution Address / POC:
Naval Undersea Warfare Center (NUWC), Division Newport
15. TOTAL
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM:
Failure Analysis/Corrective Action Report
3. SUBTITLE
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-SESS-81315B
5. CONTRACT REFERENCE
SOW Task Number 4.1.2
6. REQUIRING OFFICE
NUWC Division Newport
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
LT
9. DIST STATEMNT
14. DISTRIBUTION
D See Block
See Block 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQNT
SUBMISSION
a. ADDRESSEE Draft Final
N/A See Block 16 Reg Repro
16. REMARKS NUWC NPT
Code 85
0 1 0
BLK 10: FREQUENCY IS DETERMINED BY NUMBER OF /LAT FAILURES.
BLK 12: DATE OF FIRST SUBMISSION – NLT AN INTERIM REPORT IS DUE NLT 10 DAYS
AFTER NOTIFICATION OF LOT FAILURE. A FINAL REPORT IS DUE 30 DAYS AFTER
NOTIFICATION OF LOT FAILURE.
BLK 13: DATE OF SUBSEQUENT SUBMISSION – NLT 10 DAYS AFTER FA COMPLETION
OF SECOND FAILED LOT AND BEYOND.
BLK 14: The Contractor shall submit this deliverable via email to the Government Point of Contact (POC) listed below.
Distribution Address / POC:
Naval Undersea Warfare Center (NUWC), Division Newport
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM:
Ammo Data Card (ADC)
3. SUBTITLE
17. PRICE GROUP
4. AUTHORITY (Date Acquisition Document No.)
DI-MISC-80043B
5. CONTRACT REFERENCE
SOW Task Number 4.2.3
6. REQUIRING OFFICE
NUWC Division Newport
18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ
DD
9. DIST STATEMNT
14. DISTRIBUTION
D ASREQ ASREQ b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQNT
SUBMISSION
a. ADDRESSEE Draft Final
A N/A When Revised Reg Repro
16. REMARKS NUWC NPT
Code 85
0 1 0
BLK 4: DATA CARD SHALL BE PREPARED IN ACCORDANCE WITH MIL-STD-1168, AS
CHANGED BY ADL EXCEPTIONS AND THE DOCUMENT CONTRACT LIST BY ACCESING
THE WORLDWIDE AMMUNITION-DATA REPOSITORY (WARP) WHICH IS LOCATED:
https://mhpwarp.redstone.army.mil. AN ACCESS REQUEST FORM MUST BE
COMPLETED BEFORE WARP CAN BE ACCESSED. QUESTIONS SPECIFIC TO WARP
SHOULD BE ADDRESSED TO ONE OF THE RESPECTIVE POCs AS LISTED ON THE
WEBSITE.
BLK 10, 12, 13: DATA CARDS PROVIDED TO NAVSEA PMS-404 AND THOSE SEND WITH
SHIPMENTS SHALL BE HARDCOPY PRINTOUTS GENERATED WITH THE WARP
PROGRAM AND SHALL BE SIGNED AND DATED BY THE GOVERNMENT INSPECTOR.
NAVSEA PMS-404 SUDMISSIONS SHALL ALSO INCLUDE HARDCOPY PRINTOUT OF
SAMPLES CARDS 9SEE MIL-STD-1168, PARA 4.3.1.4)
BLK 14: The Contractor shall submit this deliverable via email to the Government Point of Contact (POC) listed below.
Distribution Address / POC:
Naval Undersea Warfare Center (NUWC), Division Newport
File details come from the government source that posted it. Updated .