CDRL_DD Form 1423 - NIIN 016795138.pdf

PDF 82 KB Posted

Attached to
BOAST RFOP - Firing Mechanism Gun, NSN: 1010-01-679-5138
Solicitation number
PANDTA26P0000029689
Issued by

About this file

This is a DD Form 1423 specifying technical data and documentation requirements for contract EH6C0055EH, a Firing Pin development effort. The contracting officer is preparing technical data deliverables for a Test Data Package (TDP) category item with a contract award date of February 3, 2026. The contractor is to be determined (TBD), and the requiring office is identified with a question mark, indicating incomplete contract setup.

The contract requires six primary data deliverables as follows: (A001) Engineering Change Proposal (ECP) documentation per DI-SESS-80639E with four copies distributed to the Procuring Contracting Officer, Contract Specialist, Administrative Contracting Office, and Engineering POC; (A002) Request for Variance (RFV) per DI-SESS-80640E with identical distribution; (A003) Notice of Revision (NOR) per DI-SESS-80642E with the same distribution; (A004) Acceptance Inspection Equipment (AIE) Report per DI-MGMT-81979 requiring three copies submitted prior to production or First Article Test initiation, with 45-day government disposition timeline; (A005) First Article Test Report (FATR) per DI-NDTI-80809B requiring three copies with 15 calendar days advance notice before testing; and (A006) Start of Work Meeting Minutes per DI-ADMN-81505 requiring three copies within 30 days of contract award with 7 calendar days advance notice. All submissions are as-required (ASREQ), must be in Microsoft Office or PDF format, and directed electronically to specified Army email addresses including DEVCOM-ACE and RDAR-EIQ-P offices.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423 INFORMATION EH6C0055EH

A. CONTRACT LINE ITEM NO.:

B. EXHIBIT:

C. CATEGORY: TDP

D. SYSTEM/ITEM: Firing Pin

E. CONTRACT/PR NO.: EH6C0055EH

F. CONTRACTOR: TBD

G. PREPARED BY: Michelle Lerro, FCDD-ACE-SP

H: DATE: 2/3/2026

I: APPROVED BY:

J: DATE: 2/3/2026

1. DATA ITEM NO: A001

2. TITLE: Engineering Change Proposal (ECP)

3. SUBTITLE: x

4. AUTHORITY: DI-SESS-80639E

5. CONTRACT REFERENCE: SOW SECTION C

6. REQUIRING OFFICE: ?

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: SEE ITEM 16

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: SEE ITEM 16

A. ADDRESSEE: (1) PCO

A. ADDRESSEE: (2) CS

A. ADDRESSEE: (3) ACO

A. ADDRESSEE: (4) ENG

B. Copies DRAFT: 0 B. Copies FINAL REG: 4

B. Copies FINAL REG REPRO: 0

15. TOTAL COPIES: 4

16. REMARKS:

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO: A002

2. TITLE: Request For Variance (RFV)

3. SUBTITLE: x

4. AUTHORITY: DI-SESS-80640E

5. CONTRACT REFERENCE: SOW SECTION C

6. REQUIRING OFFICE: ?

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: SEE ITEM 16

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

ITEM 9: UNLESS OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE ECP SHALL BE THE MOST

RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE ECP.

SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT XXXX@ARMY.MIL AND CONTRACT SPECIALIST AT XXXX@ARMY.MIL; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING OFFICE AT XXXX@ARMY.MIL AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil.

DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.1 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1692 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/.

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: SEE ITEM 16

A. ADDRESSEE: (1) PCO

A. ADDRESSEE: (2) CS

A. ADDRESSEE: (3) ACO

A. ADDRESSEE: (4) ENG

B. Copies DRAFT: 0 B. Copies FINAL REG: 4

B. Copies FINAL REG REPRO: 0

15. TOTAL COPIES: 4

16. REMARKS:

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO: A003

2. TITLE: Notice Of Revision (NOR)

3. SUBTITLE: x

4. AUTHORITY: DI-SESS-80642E

5. CONTRACT REFERENCE: SOW SECTION C

6. REQUIRING OFFICE: ?

7. DD250 REQ: LT

8. APP CODE: N/A

9. DIST. STATEMENT REQ: SEE ITEM 16

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: ASREQ

13. DATE OF SUBS. SUBMISSION: ASREQ

14. DISTRIBUTION: SEE ITEM 16

A. ADDRESSEE: (1) PCO

A. ADDRESSEE: (2) CS

A. ADDRESSEE: (3) ACO

A. ADDRESSEE: (4) ENG

B. Copies DRAFT: 0 B. Copies FINAL REG: 4

B. Copies FINAL REG REPRO: 0

15. TOTAL COPIES: 4

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

ITEM 9: UNLESS OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE RFV SHALL BE THE MOST

RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE RFV.

SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT XXXX@ARMY.MIL AND CONTRACT SPECIALIST AT XXXX@ARMY.MIL; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING OFFICE AT XXXX@ARMY.MIL AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil.

DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.2 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1694 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/.

16. REMARKS:

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO: A004

2. TITLE: Acceptance Inspection Equipment (AIE) Report

3. SUBTITLE: Special Inspection Equipment Descriptive Documentation

4. AUTHORITY: DI-MGMT-81979

5. CONTRACT REFERENCE: SOW SECTION C.6 and E.1

6. REQUIRING OFFICE: RDAR-EIQ-P

7. DD250 REQ: no

8. APP CODE: A

9. DIST. STATEMENT REQ: D

10. FREQUENCY: ASREQ

11. AS OF DATE: Date of Contract Award

12. DATE OF FIRST SUBMISSION: ASREQ (See Item 16)

13. DATE OF SUBS. SUBMISSION: ASREQ (See Item 16)

14. DISTRIBUTION:

A. ADDRESSEE: (1) PCO

A. ADDRESSEE: (2) (Engineering) usarmy.pica.devcom-ac.mbx.qesa-qew-aie@army.mil A. ADDRESSEE: (3) (Quality) usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil

A. ADDRESSEE: (4)

B. Copies DRAFT: 0 B. Copies FINAL REG: 3

B. Copies FINAL REG REPRO: 0

15. TOTAL COPIES: 3

16. REMARKS: ITEM 12: PRIOR TO INITIATION OF PRODUCTION OR FIRST ARTICLE TEST, IF CONTRACTUALLY REQUIRED (SEE NOTE 1).

ITEM 13: WHENEVER ANY REVISION THERETO IS NEEDED FOR ANY REASON.

NOTE 1: THE GOVT WILL FURNISH DISPOSITION WITHIN 45 CALENDAR DAYS AFTER RECEIPT.

NOTE 2: MICROSOFT OFFICE 97 DRAWINGS: AUTOCAD-RELEASE 14 (EXPRESS MAILED HARD COPIES WILL BE ACCEPTED)

FILES MAY BE COMPRESSED USING ZIP PROGRAM.

WARNING: LARGE PACKAGES MAY CAUSE DELAYS IN DELIVERY USING MAIL INTERNET. EMAIL SUBJECT LINE MUST

CONTAIN END ITEM NOMENCLATURE.

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

ITEM 9: UNLESS OTHERWISE SPECIFIED THE DISTRIBUTION STATEMENT ASSIGNED TO THE NOR SHALL BE THE MOST

RESTRICTIVE DISTRIBUTION STATEMENT OF THE AFFECTED ITEMS IDENTIFIED IN THE NOR.

SUBMIT ELECTRONICALLY TO THE PROCURING CONTRACTING OFFICER AT XXXX@ARMY.MIL AND CONTRACT SPECIALIST AT XXXX@ARMY.MIL; COPY FURNISH TO THE ADMINISTRATIVE CONTRACTING OFFICE AT XXXX@ARMY.MIL AND ENGINEERING POC AT usarmy.pica.devcom-ac.mbx.ecp-document@army.mil.

DOCUMENTATION SHALL BE IN ACCORDANCE WITH PARAGRAPH 3.3.4 OF SAE-EIA-649-1 (CURRENT REVISION) USING DD FORM 1695 (CURRENT REVISION) LOCATED AT http://www.dtic.mil/whs/directives/infomgt/forms/.

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO: A005

2. TITLE: First Article Test Report (FATR)

3. SUBTITLE: Test/Inspection Report

4. AUTHORITY: DI-NDTI-80809B

5. CONTRACT REFERENCE: SOW SECTION C.6 and F.1

6. REQUIRING OFFICE: RDAR-EIQ-P

7. DD250 REQ: no

8. APP CODE: A

9. DIST. STATEMENT REQ: D

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: SEE ITEM 16

13. DATE OF SUBS. SUBMISSION: SEE ITEM 16

14. DISTRIBUTION:

A. ADDRESSEE: (1) PCO

A. ADDRESSEE: (2) (Engineering) usarmy.pica.devcom-ac.mbx.qesa-qew-aie@army.mil A. ADDRESSEE: (3) (Quality) usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil

A. ADDRESSEE: (4)

B. Copies DRAFT: 0 B. Copies FINAL REG: 3

B. Copies FINAL REG REPRO: 0

15. TOTAL COPIES: 3

16. REMARKS:

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

1. DATA ITEM NO: A006

2. TITLE: Report

3. SUBTITLE: Start Of Work Meeting Minutes

4. AUTHORITY: DI-ADMN-81505

5. CONTRACT REFERENCE: SOW SECTION C

6. REQUIRING OFFICE: RDAR-EIQ-P

7. DD250 REQ: no

8. APP CODE: A

9. DIST. STATEMENT REQ: N/A

10. FREQUENCY: ASREQ

11. AS OF DATE: N/A

12. DATE OF FIRST SUBMISSION: SEE ITEM 16

13. DATE OF SUBS. SUBMISSION: N/A

14. DISTRIBUTION:

A. ADDRESSEE: (1) PCO

A. ADDRESSEE: (2) RDAR-EIQ-P

A. ADDRESSEE: (3) QAR

A. ADDRESSEE: (4)

B. Copies DRAFT: 0 B. Copies FINAL REG: 3

B. Copies FINAL REG REPRO: 0

REQUIRED BY THE AUTHORITY IN ITEM 4, PARA 10.2 AND ITS SUBPARAGRAPHS.

CONTRACTOR FORMAT IS ACCEPTABLE.

The FATR shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic.

Evidence of the QAR's verification will be provided.

ITEM 12: THE CONTRACTOR SHALL PROVIDE TO THE PROCURING CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 15 CALENDAR DAYS ADVANCE NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF

15. TOTAL COPIES: 3

16. REMARKS:

17. PRICE GROUP:

18. ESTIMATED TOTAL PRICE:

ITEM 4: CONTRACTOR FORMAT IS ACCEPTABLE.

ITEM 12: MEETING SHALL BE HELD WITHIN 30 DAYS OF CONTRACT AWARD. MEETING MINUTES SHALL BE COMPLETED AND FORWARDED TO QAR, PCO, AND QUALITY ASSURANCE WITHIN 7 CALENDAR DAYS AFTER MEETING. THE CONTRACTOR SHALL PROVIDE TO THE PROCURING CONTRACTING OFFICER, QAR, AND RDAR-EIQ-P AT LEAST 7 CALENDAR DAYS ADVANCE NOTICE (IN WRITING) OF THE SCHEDULED DATE, TIME AND LOCATION OF START OF MEETING

MEETING MINUTES SHALL BE SENT ELECTRONICALLY TO QUALITY ASSURANCE: USARMY.RIA.ARDEC.MBX.RDAR-

QEP2@ARMY.MIL

TACOM print List

File details come from the government source that posted it. Updated .