CDC P-964_00_CUBA_SID - INTERIORS.pdf

PDF 1 MB Posted

Attached to
Amendment 0003 - Construction of P-964 Shore to Ship Utilities, Bahrain
Solicitation number
W912ER21R0001
Issued by

About this file

This document package includes a structural interior design scope of work and color boards for a consolidated utility building addition on Naval Support Activity Bahrain under solicitation number W912ER21R0001. The scope involves adding 86 square meters to an existing consolidated utility building to accommodate a third reverse osmosis water treatment train, along with associated finishes. The structural interior design scope specifies neutral paint colors and durable materials. Product data includes color boards displaying paint, epoxy, and striping samples. The related federal contract opportunity is a design-bid-build project to construct shore-to-ship utility systems on NSA II Bahrain to support littoral combat ships and other visiting vessels. Facilities include hotel service stations, electrical distribution infrastructure, a consolidated utility building addition, and a storage building.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSOLIDATED UTILITY BUILDING ADDITION

(CUBA)

STRUCTURAL INTERIOR DESIGN

CONTRACT DOCUMENTS COMPLETE (CDC)

SEPTEMBER 14, 2020

P964 Shore To Ship Utilities

Naval Support Activity (NSA)

Bahrain

PREPARED BY:

TABLE OF CONTENTS

STRUCTURAL INTERIOR DESIGN

Design Narrative Tab 1

Finish Plans/Room Finish Schedule/Material Legend/Details Tab 2

Reflected Ceiling Plan Tab 3

Interior Color/Sample Boards Tab 4

Exterior Color/Sample Boards Tab 5

DESIGNER OF RECORD:

CH2M

777 MAIN STREET, FORT WORTH, TX 76102

CONTACT: JERI CHAMPINE

PROJECT:

NSA II

P964, SHORE TO SHIP UTILITIES

BA-474976

BAHRAIN

Page | 1

NSA

P964, SHORE TO SHIP UTILITIES

BA-474976 – BAHRAIN

CONSOLIDATED UTILITY BUILDING ADDITION

INTERIOR DESIGN NARRATIVE

GENERAL DESCRIPTION:

The Shore to Ship Utility Services include comprehensive utility distribution systems and operational facility to provide dedicated quayside Shore to Ship Utility Services for the LCSs and other mission-critical homeported and deployed ships berthed on NSA II at Mina Salman. The new addition will match the previous addition. 86- m2 will be added to the existing consolidated utility building (CUB), which will provide more space for the additional reverse osmosis (RO) train.

COMPREHENSIVE INTERIOR DESIGN:

The Comprehensive Interior Design (CID) package includes Structural Interior Design (SID). The goal of the CID is to provide a functional, durable, visually appealing facility to enhance the shore to ship environment.

Finishes for this project will be new and in compliance with the USACE MED Design Instructions Manual (October 2016).

STRUCTURAL INTERIOR DESIGN:

The Structural Interior Design includes all building finishes.

The new finish palette will be neutral in color and provide a classic look and feel allowing for a timeless appeal verses a trendy design. Finish selections will provide durability, soil hiding properties, ease of maintenance, and sustainability characteristics. Flooring transitions will be provided where appropriate and meet accessibility guidelines. Wall finishes will include neutral field paint throughout. Wall finishes will be specified as low emitting or with low volatile organic compounds (VOCs).

The addition to CUB building will have a high-performance epoxy floor coating. The base is painted from finish floor to 4” high with contrasting color as indicated.

The interior walls will have low or no VOC content paint for sustainability purposes.

There are no ceilings in the CUB addition. The CUB addition will be open to structure above and painted. A painted finish will be applied to the concrete structure. Interior doors will be painted, as well as hollow metal doors with hollow metal frames.

FUNCTIONAL EVALUATION/ENVIRONMENTAL RESPONSE:

The scope of work does not include LEED certification. However, sustainability in accordance with UFC 2- 200-01 will be incorporated into the material selections and indoor air quality certification will be emphasized.

D.1

E

F

G

8.1 9.1 109

TOILET LAB

CHEMICAL

STORAGE

CONTROL

ROOM

SPARE

PARTS

MECHANICAL

RO UNITS

S M

GRAPHIC SCALE

PLAN NORTH

1:100

10m2m 8m6m4m0m

DIM. NOTE & NORTH

KEY PLAN

8.1

G

D.1

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

UNLESS OTHERWISE NOTED, LINEAR

DIMENSIONS SHOWN ARE IN MILLIMETERS.

P L

O T

D A

T E

F

IL

E N

A M

E

B A

H R

A

IN

C:\Users\jonesc8\Documents\BA-474976A-A-DM-CUBA_JonesC8.rvt

9/9/2020 6:47:52 PM

/9

/2

:4

:5

P M

I-110

N S

A I

I

W

E

R

R

P

S H

O R

E T

O S

H

IP

U T

IL

IT

IE

S

B A

-4

A

B A

-4

A

-I -1

P N

M

ID

D L E

E A

S T

D

IS

T R

IC

T

P .O

B

O X

W

IN

C H

E S

T E

R

V A

-1

C O

N S

O L

ID

A

T E

D U

T

IL

IT

Y

B U

IL

D

IN

G

A D

D

IT

IO

N

IN

T

E R

IO

R

S F

IN

IS

H P

L A

N A

N D

S C

H E

D U

L E

J

C H

A M

P

IN

E

C

J O

N E

S

R

S E

D E

R

S

W

IL

H O

IT

E

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

NAME AREA

FLOORING WALLS CEILING

COMMENTSFINSH BASE

NORTH WALL EAST WALL SOUTH WALL WEST WALL

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

RO UNITS 74.84 m² EP-1 PT-2 CMU PT-1 CMU PT-1 CMU PT-1 EXISTING TO

REMAIN

EXISITING TO

REMAIN

EXPOSED OTS-1 PAINT NEW COLUMNS,

PT-1

36 PT-5, APPLY VERTICAL STRIPING TO RAISED VERTICAL SIDE OF

CONCRETE PAD

1 : 100A1

FINISH FLOOR PLAN - INTERIORS

MATERIAL FINISH SCHEDULE

ITEM CODE DESCRIPTION MANUFACTURER COLOR

BASE PT-2 4" PAINTED BASE PANTONE PAINT WALL BASE PANTONE, WARM GRAY

6C

DOORS PT-2 HOLLOW METAL DOORS & FRAMES PAINT PANTONE PANTONE, WARM GRAY 6C

EXTERIOR

FINISH

EX-1 PAINTED CMU AND CAST IN PLACE CONCRETE

- EXTERIOR WALLS

PANTONE PT-3, PANTONE 146 C

EXTERIOR

FINISH

EX-2 PAINTED METAL - DOOR FRAMES PANTONE PT-4, PANTONE 188 C

EXTERIOR

FINISH

EX-3 ANODIZED ALUMINUM - WINDOW FRAMES PANTONE PT-4, PANTONE 188 C

EXTERIOR

FINISH

EX-5 PREFINISHED METAL - DOWN SPOUTS &

SCUPPERS

PANTONE PT-4, PANTONE 188 C

VERTICAL

STRIPING

PT-5 3" WIDE ALTERNATING VERTICAL STRIPING PANTONE PANTONE 7549 C / PANTONE 419 C

WALLS PT-1 INTERIOR FIELD PAINT PANTONE PANTONE, WARM GRAY 2C

FLOORING EP-1 5 LAYERS OF HIGH PERFORMING EPOXY CLEAR

CEILINGS OTS-1 PAINTED OPEN STRUCTURE PANTONE PANTONE, COOL GRAY 1C

A ALL FINISHES ARE TO BE INSTALLED/ APPLIED IN ACCORDANCE

WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS.

B FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH

MATERIALS.

C DOORS AND FRAMES SCHEDULED TO BE PAINTED SHALL HAVE A

SEMI GLOSS FINISH UON.

D REFER TO REFLECTED CEILING PLANS FOR ADDITIONAL

INFORMATION.

E REFER TO ARCHITECTURE DRAWINGS FOR EXTERIOR FINISHES.

SHEET KEYNOTES

GENERAL SHEET NOTES

R F

P R

E Q

U E

S T

F O

R P

R O

P O

S A

L S

E P

T

JonesC8 Snapshot

D.1

E

F

G

8.1 9.1 109

143143109

LABTOILET

CHEMICAL

STORAGE

CONTROL

ROOM

SPARE

PARTS

MECHANICAL

RO UNITS

143143

4460 3990 2290

LIGHT FIXTURE; REFER TO ELECTRICAL

DRAWINGS.

SUPPLY AIR DIFFUSERS; REFER TO

MECHANICAL DRAWINGS.

RETURN AIR GRILLE; REFER TO

MECHANICAL DRAWINGS.

EXIT LIGHT FIXTURE; CEILING MOUNTED;

REFER TO ELECTRICAL DRAWINGS.

SPRINKLERS, SMOKE DETECTORS, AND

SPEAKER STROBES; REFER TO FIRE

PROTECTION DRAWINGS.

REFLECTED CEILING PLAN

LEGEND

AREA NOT IN SCOPE

SM

GRAPHIC SCALE

PLAN NORTH

1:100

10m2m 8m6m4m0m

DIM. NOTE & NORTH

KEY PLAN

8.1

G

D.1

US Army Corps of Engineers ®

SHEET ID

US

A

R M

Y C

O

RP

S O

F

EN

G

IN

EE

RS

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D

AT

E

File Path:

Plot Date:

M

AR

K D

ES

C

R

IP

TI

O

N

UNLESS OTHERWISE NOTED, LINEAR

DIMENSIONS SHOWN ARE IN MILLIMETERS.

PL

O

T D

AT

E:

FI

LE

N

AM

E:

BA

H

R

AI

N

C:\Users\malekn\Documents\BA-474976A-A-DM-CUBA_n-malek.rvt

9/9/2020 2:30:28 PM

9/ 9/

:3

0:

PM

A-111

N

SA

II

W

2E R

R

P9

, S H

O R

E

TO

S H

IP

U

TI

LI

TI

ES

BA

-4

A

BA

-4

6A -A

-1

PN

M

ID

D

LE

E

AS

T D

IS

TR

IC

T

P.

O

. B O

X

W

IN

C

H

ES

TE

R

, V A

4-

C O

N

SO

LI

D

AT

ED

U

TI

LI

TY

B U

IL

D

IN

G

A D

D

IT

IO

N

AR

C

H

IT

EC

TU

R

AL

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

N . M

AL

EK

N . R

AN

D

AL

L

R . S

ED

ER

S.

W

IL

H

O

IT

E

REQUEST FOR PROPOSAL

1 : 100A3 CEILING PLAN

SHEET KEYNOTES

15 EXISTING BEAM TO REMAIN; REFER STRUCTURAL

46 PLUMBING VENT; REFER PLUMBING

49 WALL MOUNTED MIRROR (MM) FOR CHEMICAL FEED

MONITORING; FIELD VERIFY MOUNTING HEIGHT TO AVOID

CONFLICTS WITH PIPES AND PANS; REFER PROCESS

MECHANICAL THE LOCATION

109 50mm EXPANSION JOINT; REFER TO SHEET E7/SA507

140 ELECTRICAL EQUIPMENT; REFER ELECTRICAL

142 EMERGENCY LIGHT FIXTURE; SEE ELECTRICAL

143 EXPOSED TO STRUCTURE ABOVE. (PAINT)

168 SALVAGED RELOCATED EXTERIOR LIGHT. CENTER ABOVE

DOOR 300mm; REPAINT AS NEEDED. REFER ELECTRICAL 169 50mm CEILING EXPANSION JOINT COVER; REFER SHEET

E1/SA502

A REFER TO A-110 FOR FLOOR PLANS

B AT CONDITIONS WHERE LIGHTS, SPRINKLERS, OR

OTHER DEVICES ARE COINCIDENT ON PLAN, FIXTURES

ARE AT DIFFERENT LOCATIONS. REFER TO ELECTRICAL

AND FIRE PROTECTION FOR FIXTURE MOUNTING

HEIGHTS

C EXPOSED STRUCTURE TO BE PAINTED

GENERAL SHEET NOTES

R

FP

R

EQ

U E S

T

FO

R P

R O

P O

SA

L

SE

PT

NSA II – P964, CONSOLIDATED UTILITY BUILDING ADDITION

BAHRAIN

STRUCTURAL INTERIOR DESIGN COLOR/SAMPLE BOARDS

PT-1 PAINT – FIELD COLOR

PANTONE

WARM GRAY 2 C

GENERAL FINISHES - PAINT/STAIN

PT-2 PAINT – BASE PAINT

PANTONE

WARM GRAY 6 C

OTS-1 OPEN TO STRUCTURE

PANTONE

COOL GRAY 1 C

SID-1

EP-1 – EPOXY COATING

5 LAYERS OF HIGH PERFORMING EPOXY

CLEAR

PT-5 PAINT – VERTICAL STRIPING

PANTONE

7549 C / 419 C

GENERAL FINISHES - PAINT/STAIN

SID-1

NSA – P964, CONSOLIDATED UTILITY BUILDING ADDITION

BAHRAIN

STRUCTURAL INTERIOR DESIGN COLOR/SAMPLE BOARDS

PT-3 PAINT – FIELD COLOR (DESERT PUMPKIN)

PANTONE

146 C

EXTERIOR FINISHES

EX SID-1

PT-4 PAINT – ACCENT COLOR

PANTONE

188 C

CMU – EXTERIOR WALL

1 - COVER SID (1)
2 - Table of Contents
3 - Interior Design Narrative (P-964) - Formatted (3)
4 - FINISH PLAN & SCHEDULE
Sheets
I-110 - FINISH PLAN & SCHEDULE
6 - CONSOLIDATED UTILITY BLDG ADDITION- INTERIOR - SID Colorboard
7 - CONSOLIDATED UTILITY BLDG ADDITION - EXTERIOR - SID Colorboard

File details come from the government source that posted it. Updated .