CDC P-964_00_CUBA_SID - INTERIORS.pdf
PDF 1 MB Posted
- Solicitation number
- W912ER21R0001
About this file
This document package includes a structural interior design scope of work and color boards for a consolidated utility building addition on Naval Support Activity Bahrain under solicitation number W912ER21R0001. The scope involves adding 86 square meters to an existing consolidated utility building to accommodate a third reverse osmosis water treatment train, along with associated finishes. The structural interior design scope specifies neutral paint colors and durable materials. Product data includes color boards displaying paint, epoxy, and striping samples. The related federal contract opportunity is a design-bid-build project to construct shore-to-ship utility systems on NSA II Bahrain to support littoral combat ships and other visiting vessels. Facilities include hotel service stations, electrical distribution infrastructure, a consolidated utility building addition, and a storage building.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSOLIDATED UTILITY BUILDING ADDITION
(CUBA)
STRUCTURAL INTERIOR DESIGN
CONTRACT DOCUMENTS COMPLETE (CDC)
SEPTEMBER 14, 2020
P964 Shore To Ship Utilities
Naval Support Activity (NSA)
Bahrain
PREPARED BY:
TABLE OF CONTENTS
STRUCTURAL INTERIOR DESIGN
Design Narrative Tab 1
Finish Plans/Room Finish Schedule/Material Legend/Details Tab 2
Reflected Ceiling Plan Tab 3
Interior Color/Sample Boards Tab 4
Exterior Color/Sample Boards Tab 5
DESIGNER OF RECORD:
CH2M
777 MAIN STREET, FORT WORTH, TX 76102
CONTACT: JERI CHAMPINE
PROJECT:
NSA II
P964, SHORE TO SHIP UTILITIES
BA-474976
BAHRAIN
Page | 1
NSA
P964, SHORE TO SHIP UTILITIES
BA-474976 – BAHRAIN
CONSOLIDATED UTILITY BUILDING ADDITION
INTERIOR DESIGN NARRATIVE
GENERAL DESCRIPTION:
The Shore to Ship Utility Services include comprehensive utility distribution systems and operational facility to provide dedicated quayside Shore to Ship Utility Services for the LCSs and other mission-critical homeported and deployed ships berthed on NSA II at Mina Salman. The new addition will match the previous addition. 86- m2 will be added to the existing consolidated utility building (CUB), which will provide more space for the additional reverse osmosis (RO) train.
COMPREHENSIVE INTERIOR DESIGN:
The Comprehensive Interior Design (CID) package includes Structural Interior Design (SID). The goal of the CID is to provide a functional, durable, visually appealing facility to enhance the shore to ship environment.
Finishes for this project will be new and in compliance with the USACE MED Design Instructions Manual (October 2016).
STRUCTURAL INTERIOR DESIGN:
The Structural Interior Design includes all building finishes.
The new finish palette will be neutral in color and provide a classic look and feel allowing for a timeless appeal verses a trendy design. Finish selections will provide durability, soil hiding properties, ease of maintenance, and sustainability characteristics. Flooring transitions will be provided where appropriate and meet accessibility guidelines. Wall finishes will include neutral field paint throughout. Wall finishes will be specified as low emitting or with low volatile organic compounds (VOCs).
The addition to CUB building will have a high-performance epoxy floor coating. The base is painted from finish floor to 4” high with contrasting color as indicated.
The interior walls will have low or no VOC content paint for sustainability purposes.
There are no ceilings in the CUB addition. The CUB addition will be open to structure above and painted. A painted finish will be applied to the concrete structure. Interior doors will be painted, as well as hollow metal doors with hollow metal frames.
FUNCTIONAL EVALUATION/ENVIRONMENTAL RESPONSE:
The scope of work does not include LEED certification. However, sustainability in accordance with UFC 2- 200-01 will be incorporated into the material selections and indoor air quality certification will be emphasized.
D.1
E
F
G
8.1 9.1 109
TOILET LAB
CHEMICAL
STORAGE
CONTROL
ROOM
SPARE
PARTS
MECHANICAL
RO UNITS
S M
GRAPHIC SCALE
PLAN NORTH
1:100
10m2m 8m6m4m0m
DIM. NOTE & NORTH
KEY PLAN
8.1
G
D.1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
UNLESS OTHERWISE NOTED, LINEAR
DIMENSIONS SHOWN ARE IN MILLIMETERS.
P L
O T
D A
T E
F
IL
E N
A M
E
B A
H R
A
IN
C:\Users\jonesc8\Documents\BA-474976A-A-DM-CUBA_JonesC8.rvt
9/9/2020 6:47:52 PM
/9
/2
:4
:5
P M
I-110
N S
A I
I
W
E
R
R
P
S H
O R
E T
O S
H
IP
U T
IL
IT
IE
S
B A
-4
A
B A
-4
A
-I -1
P N
M
ID
D L E
E A
S T
D
IS
T R
IC
T
P .O
B
O X
W
IN
C H
E S
T E
R
V A
-1
C O
N S
O L
ID
A
T E
D U
T
IL
IT
Y
B U
IL
D
IN
G
A D
D
IT
IO
N
IN
T
E R
IO
R
S F
IN
IS
H P
L A
N A
N D
S C
H E
D U
L E
J
C H
A M
P
IN
E
C
J O
N E
S
R
S E
D E
R
S
W
IL
H O
IT
E
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
NAME AREA
FLOORING WALLS CEILING
COMMENTSFINSH BASE
NORTH WALL EAST WALL SOUTH WALL WEST WALL
MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
RO UNITS 74.84 m² EP-1 PT-2 CMU PT-1 CMU PT-1 CMU PT-1 EXISTING TO
REMAIN
EXISITING TO
REMAIN
EXPOSED OTS-1 PAINT NEW COLUMNS,
PT-1
36 PT-5, APPLY VERTICAL STRIPING TO RAISED VERTICAL SIDE OF
CONCRETE PAD
1 : 100A1
FINISH FLOOR PLAN - INTERIORS
MATERIAL FINISH SCHEDULE
ITEM CODE DESCRIPTION MANUFACTURER COLOR
BASE PT-2 4" PAINTED BASE PANTONE PAINT WALL BASE PANTONE, WARM GRAY
6C
DOORS PT-2 HOLLOW METAL DOORS & FRAMES PAINT PANTONE PANTONE, WARM GRAY 6C
EXTERIOR
FINISH
EX-1 PAINTED CMU AND CAST IN PLACE CONCRETE
- EXTERIOR WALLS
PANTONE PT-3, PANTONE 146 C
EXTERIOR
FINISH
EX-2 PAINTED METAL - DOOR FRAMES PANTONE PT-4, PANTONE 188 C
EXTERIOR
FINISH
EX-3 ANODIZED ALUMINUM - WINDOW FRAMES PANTONE PT-4, PANTONE 188 C
EXTERIOR
FINISH
EX-5 PREFINISHED METAL - DOWN SPOUTS &
SCUPPERS
PANTONE PT-4, PANTONE 188 C
VERTICAL
STRIPING
PT-5 3" WIDE ALTERNATING VERTICAL STRIPING PANTONE PANTONE 7549 C / PANTONE 419 C
WALLS PT-1 INTERIOR FIELD PAINT PANTONE PANTONE, WARM GRAY 2C
FLOORING EP-1 5 LAYERS OF HIGH PERFORMING EPOXY CLEAR
CEILINGS OTS-1 PAINTED OPEN STRUCTURE PANTONE PANTONE, COOL GRAY 1C
A ALL FINISHES ARE TO BE INSTALLED/ APPLIED IN ACCORDANCE
WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
B FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING FINISH
MATERIALS.
C DOORS AND FRAMES SCHEDULED TO BE PAINTED SHALL HAVE A
SEMI GLOSS FINISH UON.
D REFER TO REFLECTED CEILING PLANS FOR ADDITIONAL
INFORMATION.
E REFER TO ARCHITECTURE DRAWINGS FOR EXTERIOR FINISHES.
SHEET KEYNOTES
GENERAL SHEET NOTES
R F
P R
E Q
U E
S T
F O
R P
R O
P O
S A
L S
E P
T
JonesC8 Snapshot
D.1
E
F
G
8.1 9.1 109
143143109
LABTOILET
CHEMICAL
STORAGE
CONTROL
ROOM
SPARE
PARTS
MECHANICAL
RO UNITS
143143
4460 3990 2290
LIGHT FIXTURE; REFER TO ELECTRICAL
DRAWINGS.
SUPPLY AIR DIFFUSERS; REFER TO
MECHANICAL DRAWINGS.
RETURN AIR GRILLE; REFER TO
MECHANICAL DRAWINGS.
EXIT LIGHT FIXTURE; CEILING MOUNTED;
REFER TO ELECTRICAL DRAWINGS.
SPRINKLERS, SMOKE DETECTORS, AND
SPEAKER STROBES; REFER TO FIRE
PROTECTION DRAWINGS.
REFLECTED CEILING PLAN
LEGEND
AREA NOT IN SCOPE
SM
GRAPHIC SCALE
PLAN NORTH
1:100
10m2m 8m6m4m0m
DIM. NOTE & NORTH
KEY PLAN
8.1
G
D.1
US Army Corps of Engineers ®
SHEET ID
US
A
R M
Y C
O
RP
S O
F
EN
G
IN
EE
RS
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D
AT
E
File Path:
Plot Date:
M
AR
K D
ES
C
R
IP
TI
O
N
UNLESS OTHERWISE NOTED, LINEAR
DIMENSIONS SHOWN ARE IN MILLIMETERS.
PL
O
T D
AT
E:
FI
LE
N
AM
E:
BA
H
R
AI
N
C:\Users\malekn\Documents\BA-474976A-A-DM-CUBA_n-malek.rvt
9/9/2020 2:30:28 PM
9/ 9/
:3
0:
PM
A-111
N
SA
II
W
2E R
R
P9
, S H
O R
E
TO
S H
IP
U
TI
LI
TI
ES
BA
-4
A
BA
-4
6A -A
-1
PN
M
ID
D
LE
E
AS
T D
IS
TR
IC
T
P.
O
. B O
X
W
IN
C
H
ES
TE
R
, V A
4-
C O
N
SO
LI
D
AT
ED
U
TI
LI
TY
B U
IL
D
IN
G
A D
D
IT
IO
N
AR
C
H
IT
EC
TU
R
AL
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
N . M
AL
EK
N . R
AN
D
AL
L
R . S
ED
ER
S.
W
IL
H
O
IT
E
REQUEST FOR PROPOSAL
1 : 100A3 CEILING PLAN
SHEET KEYNOTES
15 EXISTING BEAM TO REMAIN; REFER STRUCTURAL
46 PLUMBING VENT; REFER PLUMBING
49 WALL MOUNTED MIRROR (MM) FOR CHEMICAL FEED
MONITORING; FIELD VERIFY MOUNTING HEIGHT TO AVOID
CONFLICTS WITH PIPES AND PANS; REFER PROCESS
MECHANICAL THE LOCATION
109 50mm EXPANSION JOINT; REFER TO SHEET E7/SA507
140 ELECTRICAL EQUIPMENT; REFER ELECTRICAL
142 EMERGENCY LIGHT FIXTURE; SEE ELECTRICAL
143 EXPOSED TO STRUCTURE ABOVE. (PAINT)
168 SALVAGED RELOCATED EXTERIOR LIGHT. CENTER ABOVE
DOOR 300mm; REPAINT AS NEEDED. REFER ELECTRICAL 169 50mm CEILING EXPANSION JOINT COVER; REFER SHEET
E1/SA502
A REFER TO A-110 FOR FLOOR PLANS
B AT CONDITIONS WHERE LIGHTS, SPRINKLERS, OR
OTHER DEVICES ARE COINCIDENT ON PLAN, FIXTURES
ARE AT DIFFERENT LOCATIONS. REFER TO ELECTRICAL
AND FIRE PROTECTION FOR FIXTURE MOUNTING
HEIGHTS
C EXPOSED STRUCTURE TO BE PAINTED
GENERAL SHEET NOTES
R
FP
R
EQ
U E S
T
FO
R P
R O
P O
SA
L
SE
PT
NSA II – P964, CONSOLIDATED UTILITY BUILDING ADDITION
BAHRAIN
STRUCTURAL INTERIOR DESIGN COLOR/SAMPLE BOARDS
PT-1 PAINT – FIELD COLOR
PANTONE
WARM GRAY 2 C
GENERAL FINISHES - PAINT/STAIN
PT-2 PAINT – BASE PAINT
PANTONE
WARM GRAY 6 C
OTS-1 OPEN TO STRUCTURE
PANTONE
COOL GRAY 1 C
SID-1
EP-1 – EPOXY COATING
5 LAYERS OF HIGH PERFORMING EPOXY
CLEAR
PT-5 PAINT – VERTICAL STRIPING
PANTONE
7549 C / 419 C
GENERAL FINISHES - PAINT/STAIN
SID-1
NSA – P964, CONSOLIDATED UTILITY BUILDING ADDITION
BAHRAIN
STRUCTURAL INTERIOR DESIGN COLOR/SAMPLE BOARDS
PT-3 PAINT – FIELD COLOR (DESERT PUMPKIN)
PANTONE
146 C
EXTERIOR FINISHES
EX SID-1
PT-4 PAINT – ACCENT COLOR
PANTONE
188 C
CMU – EXTERIOR WALL
| 1 - COVER SID (1) |
| 2 - Table of Contents |
| 3 - Interior Design Narrative (P-964) - Formatted (3) |
| 4 - FINISH PLAN & SCHEDULE |
| Sheets |
| I-110 - FINISH PLAN & SCHEDULE |
| 6 - CONSOLIDATED UTILITY BLDG ADDITION- INTERIOR - SID Colorboard |
| 7 - CONSOLIDATED UTILITY BLDG ADDITION - EXTERIOR - SID Colorboard |
File details come from the government source that posted it. Updated .