About this file

This Request for Statement of Qualifications (RSQ) is issued by Volusia County's Office of Recovery and Resiliency (ORR) for the CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering project. The solicitation seeks qualified firms to design drainage improvements for two urban drainage basins totaling 599 acres, with the goal of addressing chronic flooding issues experienced during recent hurricanes. The project is funded by a U.S. Department of Housing and Urban Development Community Development Block Grant for Disaster Recovery. The RSQ was released on April 8, 2025, with a deadline for questions on April 22, 2025, and responses due by May 6, 2025, at 3:00 pm. The project involves three primary phases: Preliminary Engineering, Final Design and Permitting, and Post-Design services, which include tasks such as survey preparation, utility identification, permitting, conceptual and construction plan development, and support through project completion.

The project aims to replace existing limited-capacity stormwater pump stations with more robust systems: a new 25 cubic feet per second (cfs) pump station for the Industrial Park Basin and a 50 cfs pump station for the Mill Lake Basin. These improvements will discharge to a 60-acre City-owned borrow pit that will serve as a reservoir for floodwaters. The total project will involve approximately 2,800 feet of 30-inch force main and 13,750 feet of 36-inch force main. The County will evaluate proposals based on three primary criteria: qualifications of the firm and assigned employees (30% weight), experience (40% weight), and project approach (30% weight). Scoring will range from 0-5 points, with the lowest price receiving 5 points and other prices calculated proportionally. The contract will be awarded to the firm offering the best overall qualifications, with the potential for multiple awards based on experience and qualifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR STATEMENT OF QUALIFICATIONS

25-SQ-84KW

CDBG-DR ORANGE CITY MILL LAKE AND INDUSTRIAL PARK BASIN

DRAINAGE IMPROVEMENTS DESIGN AND ENGINEERING

County of Volusia

123 W. Indiana Ave.

DeLand, FL 32720

RELEASE DATE: April 8, 2025

DEADLINE FOR QUESTIONS: April 22, 2025

RESPONSE DEADLINE: May 6, 2025, 3:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/volusia

County of Volusia

REQUEST FOR STATEMENT OF QUALIFICATIONS

CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage

Improvements Design and Engineering

I. Introduction II. Purpose and Overview

III. Special Terms and Conditions IV. General Terms and Conditions V. Insurance Requirements

VI. Scope of Work VII. Evaluation Criteria

VIII. Vendor Questionnaire IX. Definitions

Attachments:

A - Required Types and Limits of Insurance

B - DRAFT CONTRACT 25-SQ-84KW, Orange City Mill Lake and Industrial Park Basin

Drainage Improvements

C - Mill Lake Drainage Basin

D - Industrial Park Drainage Basin

E - Proposed Flood Mitigation Improvements

F - VOLUSIA BLUE WETLAND RECHARGE PROJECT

Request For Statement of Qualifications #25-SQ-84KW Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

1. Introduction

1.1. Summary

Volusia County’s Office of Recovery and Resiliency (ORR) is seeking statements of qualifications for this project to design Orange City's proposed drainage improvements to the Mill Lake and Industrial Park basins. This project is intended to aid in the recovery of Volusia County from the damage suffered from

Hurricane Ian in September 2022 and this project is funded by a U.S. Dept. of Housing and Urban

Development (“HUD”) Community Development Block Grant for Disaster Recovery (“CDBG-DR”).

1.2. Background

The 391-acre Mill Lake Basin and the 208-acre Industrial Park Basin are urban drainage areas that encompass residential, commercial, and light industrial land uses, as well as a major roadway corridor

(U.S. Highway 17/92). Both basins are classified as land-locked (closed) drainage basins with limited discharge. Currently, the flood stages in Mill Lake are controlled by a 1.5 cubic feet per second (cfs) [675 gallons per minute (gpm)] stormwater pump station that discharges to the St. Johns River and/or the City owned borrow pit at the western limit of West French Avenue. The permitted stormwater pump station includes several limitations and restrictions which prevent the City from adequately providing flood protection to the basin during extreme storm events. Like Mill Lake, the Industrial Park is currently controlled by a 1.5 cfs stormwater pump station that discharges to an existing depressional area located on City-owned Public Works property. However, since the existing depressional area has limited capacity, the stormwater pump station must be turned off even if flooding still exists within the basin (refer to

Attachments C and D for the Mill Lake and Industrial Park drainage basins and existing stormwater infrastructure, respectively).

Currently, based on the stormwater runoff from the two urban drainage basins, the inadequate flood storage, and the limited pumping capacity, the Mill Lake and Industrial Park basins experience significant structural flooding for moderate to extreme storm events associated with existing residential, commercial, and light industrial buildings. In addition, the depth and duration of flooding of several roadways within both drainage basins create unsafe vehicular conditions and impacts to first responders.

To address the current chronic flooding concerns that have occurred as recently as Hurricane Ian

(September 2022) and Hurricane Milton (October 2024), the following is the proposed drainage improvements (refer to attached Attachment E for the proposed improvements):

A. Replace the existing 1.5 cfs stormwater pump station and install a new 25 cfs stormwater pump station for Industrial Park and discharge to proposed Mill Lake pump station. The proposed connection from Industrial Park to Mill Lake will be accomplished by 2,800 feet of a 30-inch force main within the South Thorpe Avenue right-of-way to East Blue Springs Boulevard.

B. Replace the existing 1.5 cfs stormwater pump station and install a new 50 cfs stormwater pump station for Mill Lake and discharge it to the City’s existing borrow pit located south of West

French Avenue and east of Blue Spring State Park. The proposed connection from Mill Lake to the borrow pit will be accomplished by 13,750 feet of a 36-inch force main within the West Blue

Springs Avenue right-of-way, as well as the existing Florida Department of Transportation

(FDOT) easement that runs parallel to the railroad right-of-way or along the route of the current

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

10-inch force main that currently runs from W. Blue Springs directly to the borrow pit via Cedar

Lane.

C. Regarding the borrow pit, the City purchased the 60-acre parcel to serve as a reservoir to accommodate the pumped floodwaters from Mill Lake and Industrial Park. The borrow pit is approximately 35-feet deep and provides significant capacity for the proposed project, as well as future flood mitigation projects such as the unnamed lake associated with East Graves

Avenue and Marshall Pond located west of U.S. Highway 17/92. The borrow pit will also provide excellent recharge capabilities to benefit Blue Spring. Lastly, the borrow pit allows the City to no longer pump to the St. Johns River which eliminates future pollutant loads to the river and associated SJRWMD Permit restrictions to flood discharges.

The City’s Public Works Stormwater Division will be responsible for the required operation and maintenance of the proposed stormwater pump stations, force mains, and generators.

1.3. Contact Information

Project Contact:

Kathy Williams

Procurement Manager

123 W. Indiana Avenue

Room 302

DeLand, FL 32720

Email: kwilliams@volusia.org

Phone: (386) 626-6625

Procurement Contact:

Kathy Williams

Procurement Manager

123 W. Indiana Avenue

Room 302

DeLand, FL 32720

Email: kwilliams@volusia.org

Phone: (386) 626-6625

Department:

Recovery and Resiliency

1.4. Timeline

Release Project Date April 8, 2025

Question Submission Deadline April 22, 2025, 11:59pm mailto:kwilliams@volusia.org tel:(386)626-6625 mailto:kwilliams@volusia.org tel:(386)626-6625

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

Proposal Submission Deadline May 6, 2025, 3:00pm

Solicitation Opening Information May 6, 2025, 3:01pm

Microsoft Teams meeting

Join on your computer, mobile app or room device https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting

Meeting ID: 213 233 692 064

Passcode: gPYNoU

Or call in (audio only)

+1 386-456-3387,,628672925# United States, Daytona Beach

Phone Conference ID: 628 672 925#

2. Purpose and Overview

2.1. Purpose and Overview

The purpose of this request for statement of qualifications (RSQ) is to select the most highly qualified firm(s) to provide the requested services. It is anticipated that one (1) firm or multiple firms will be awarded a basic contract to provide the necessary services for a period of NO VALUEmay be allowable exercisable at the option of the County and as approved by the Volusia County Council and mutually agreed upon.

Authorization for performance of services by the selected firm(s) under the basic contract shall be in the form of written task assignments signed by the firm, executed and issued by the County. Each project shall be negotiated at the time of the development of the scope of work. Each task assignment shall describe the services required, state the commencement and completion date of work and establish the amount and method of payment. The task assignment will be issued under, and incorporate the terms of the basic contract. The County makes no covenant or promise as to the number of available projects or that the firm will perform any project for the County during the life of the basic contract. The basic contract does not authorize the performance of any work or require the County to place orders for work. Expiration of the term of the basic contract will have no effect upon task assignments issued pursuant to the basic contract and prior to the expiration date. Obligations entered therein by both parties shall remain in effect until completion of the work authorized by the task assignment.

This solicitation is made in accordance with the provisions of Chapter 287.055, Laws of Florida, known as the Consultants’ Competitive Negotiation Act (CCNA).

3. Special Terms and Conditions https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

3.1. Closing Date and Pre-Solicitation Conference

A. Request for Statement of Qualifications (RSQ) Closing Date

Response must be received through the County's eProcurement Portal before 3:00 pm on Tuesday, May

6, 2025. Responses received after this time will not be considered.

B. No Pre-solicitation Conference will be held.

3.2. Authorized Official

The Solicitation response and all required forms must be submitted/signed by an official authorized to legally bind the Respondent to all Solicitation provisions. A Memorandum of Authority may be submitted, to document that the individual is authorized to commit the firm to a contract.

3.3. Payment Terms

1. The County will remit full payment on all undisputed invoices within forty-five (45) days from receipt by the appropriate person(s) (to be designated at time of Agreement) of the invoice(s) or receipt of all products or services ordered.

2. Pursuant to Chapter 218, Florida Statutes, the County will pay interest not to exceed one percent (1%) per month on all undisputed invoices not paid within thirty (30) days after the due date.

3. The County has the capability of Electronic Funds Transfer (EFT). List any discounts for prompt payment and/or willingness to accept Electronic Funds Transfer (EFT) and the discount to be applied to such payments. Contractors offering prompt payment discounts, for example 1% - net 10, the discount shall be taken if the check issue date is within specified time period from date of invoice.

By submitting a Response to the County of Volusia, Florida, the Respondent expressly agrees that, if awarded an Agreement, the County may withhold from any payment monies owed by the Respondent to the County for any legal obligation between the Respondent and the County, including, but not limited to, real property taxes, personal property taxes, fees, and commissions.

3.4. Award Term

The County is looking to promote partnership relationships within the policies and procedures of public procurement. Pursuant toward that end, the successful Respondent shall be awarded an Agreement until project completion. Any renewals will be contingent upon mutual written agreement and, when applicable, approval of County Council.

3.5. Damages

Due to the nature of the services to be provided and the potential impact to the County for loss, the awarded Respondent cannot disclaim consequential or special damages related to the performance of this Agreement. The awarded Respondent shall be responsible and accountable for any and all damages, directly or indirectly, caused by the actions or inaction of its employees, staff, or Subcontractors. There are no limitations to this liability. This section does not apply to the extent precluded or prohibited by applicable law.

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

3.6. Compliance with FEMA 2 CFR 200.318-326 and Appendix II Contract Provisions

This Agreement and the products/services provided may be utilized in the event of declared State/Federal

Emergency, and awarded Respondent(s) shall comply with the applicable sections of the Federal Contract

Provisions as exhibited with this Solicitation.

3.7. Evaluation Method

The County will appoint a committee consisting of County and City staff to evaluate the proposals and to make a recommendation to the County Council. The County will be the sole judge of its own best interests, the proposals, and the resulting Contract, if any. The County’s decisions will be final. Award will be made to the proposal, which presents the best value to the County based on the entire evaluation process and all the information gathered. The County may require the short-listed firm(s), if applicable, to do an oral presentation or have discussions by the proposed team relative to their specific experience on similar projects. The selection process shall be in accordance to CCNA process.

Note: Respondents are prohibited from contacting any of the committee members, other than the

Procurement Analyst prior to the recommendation of award from the committee.

3.8. Presentations by Respondents

1. The County of Volusia, at its sole discretion, may ask individual Respondents to make oral presentations and/or demonstrations without charge to the County.

2. The County reserves the right to require any Respondent to demonstrate to the satisfaction of the

County that the Respondent has the fiscal and managerial abilities to properly furnish the services proposed and required to fulfill the requirements of the RSQ. The demonstration must satisfy the County and the County shall be the sole judge of compliance.

3. Respondents are cautioned not to assume that presentations will be required and should include all pertinent and required information in their original proposal package.

3.9. Proposal Acceptance/Rejection

The County reserves the right to accept or reject any or all proposals received as a result of this Solicitation, or to negotiate separately with competing Respondents, and to waive any informalities, defects, or irregularities in any proposal, or to accept that proposal or proposals, which in the judgment of the proper officials, is in the best interest of the County.

3.10. Proposal Acceptance Period

Any Proposal in response to this RSQ shall be valid through September 30, 2025. At the end of this time the proposal may be withdrawn at the written request of the Respondent if no award has been made. If the Proposal is not withdrawn at that time it remains in effect until an award is made or the solicitation is canceled regardless of the status of the proposal bond. The County reserves the right to request an extension of the proposals if a Contract has not been executed by September 30, 2025.

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

3.11. Termination

1. The performance of Work or Services under a Contract may be terminated by the County in accordance with this clause in whole or from time to time in part, upon at least thirty (30) days prior written notice to

Consultant whenever the County shall determine that such termination is in the best interest of the

County. Any such termination shall be effected by delivery to the Consultant of a Notice of Termination specifying the extent to which performance of work under a Contract is terminated, and the subsequent date upon which such termination becomes effective.

2. County may terminate a Contract in whole or part for convenience at will or for non-appropriation of funds by County. Upon receipt of such notification, Consultant shall inform County of the extent to which performance is completed and unless notified in writing by the County otherwise, the Consultant shall take no further steps towards completion of the Project. Upon payment by County, Consultant shall deliver to County any and all completed Deliverables and Deliverables-in-progress that then exist for the

Project. If the County terminates the Project due to the Consultant’s failure to meet a completion deadline as set forth in a Contract, the County may seek the services for the Project from another consultant and no sums shall be due to the Consultant as a result of any work or services that have been performed by the Consultant for the Project.

3. After receipt of a Notice of Termination as set forth in above, and except as otherwise directed by the

County, the Consultant shall:

3.1. Stop work under a Contract on the date and to the extent specified in the Notice of Termination.

3.2. Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of such portion of the work under a Contract, as it is not terminated.

3.3. Terminate all orders and subcontracts pursuant to this Article to the extent that they relate to the performance of Work or Services terminated by the Notice of Termination.

3.4. Assign to the County, in the manner, at the times and to the extent directed by the County, all of the right, title, and interest of the Consultant under the orders and subcontracts so terminated, in which case the County shall have the right, in its discretion, to settle or pay any or all claims arising out of the termination of such orders and subcontracts.

3.5. With the approval of the County and to the extent required by the County, settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts. County's approval of such settlements shall be final for all the purposes of a termination under the Article. In addition, Consultant shall transfer title and deliver to the County, in the manner, at the times, and to the extent, if any, directed by the County:

3.5.1. The sketches, calculations, reports, models, studies and other Work-in-process, completed Work or

Services, supplies, and other materials produced as a part of, or acquired in connection with the performance of the Work or Services terminated by the Notice of Termination; and,

3.5.2. The completed or partially completed designs, plans, drawings, information, and other property, which, if the Contract has been completed, would have been required to be furnished to the County.

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

4. Consultant shall complete performance of such part of the Work or Services as shall not have been terminated by the Notice of Termination.

5. After receipt of a Notice of Termination, the Consultant shall submit to the County its termination claim, in the form and with a certification as prescribed by the County. Such claim shall be submitted promptly but in no event later than thirty (30) days from the effective date of termination, unless one (1) or more extensions in writing are granted by the County, upon request of the Consultant made in writing within such thirty (30) day period or authorized extension thereof. Upon failure of the Consultant to submit its termination claim within the time allowed, the County may determine on the basis of information available to it, the amount, if any, due to the Consultant by reason of the termination and shall there upon pay to the Consultant the amount so determined.

6. Subject to the provisions of set forth above, the Consultant and the County may agree upon the whole or any part of the amount or amounts to be paid to the Consultant by reason of the total or partial termination of work pursuant to this Article which amount or amounts may include a reasonable allowance for profit on work done; provided, that such agreed amount or amounts exclusive of settlement costs, shall not exceed the total contract price or Compensation as reduced by the amount of payments otherwise made and as further reduced by the contract price of Compensation for Work not terminated.

As such, the Contract shall be amended accordingly and the Consultant shall be paid the agreed amount.

Nothing herein, prescribing the amount to be paid to the Consultant in the event of failure of the

Consultant and the County to agree upon the whole amount to be paid to the Consultant by reason of the termination of Work or Services pursuant to this clause, shall be deemed to limit, restrict, or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Consultant.

7. In the event of the failure of the Consultant and the County to agree as provided in Section 6. above upon the whole amount to be paid to the Consultant by reason of the termination of work pursuant to this Article, the County shall pay to the Consultant the amounts determined by the County as follows, but without duplication of any amounts already agreed upon by the parties.

7.1. For completed Work or Services accepted by the County, the price or prices or Compensation specified in the Contract for such work, less any payments previously made.

7.1.1. Notwithstanding Fixed Fee or Price and Guaranteed Maximum-Not-To-Exceed Compensation the total compensation shall include the total of the following:

7.1.1.1. The costs incurred by the Consultant in the performance of the Work and Services terminated, including initial costs and preparatory expenses allocable thereto, but exclusive of any costs attributable to the Work and Services paid or to be paid for under Sections 6. and 7.1. hereof;

7.1.1.2. The cost of settling and paying claims arising out of the termination of Work or Services under subcontracts or orders as provided herein, which are properly chargeable to the terminated portion of the Contract exclusive of amounts paid or payable on account of work or services delivered or furnished by sub-consultants or Sub-subconsultants prior to the effective date of termination, which amounts shall be included in the costs payable herein; and,

8. A Contract may be terminated by the Consultant if the Consultant provides a minimum of ninety (90) days written notice to the County’s Director of Purchasing and Contracts. In the event the Consultant breaches any of the terms and conditions of a Contract and after receipt of notice from the County of said

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering breach and time to cure the same the Consultant fails to cure the breach, the County may take over the

Work and Services and complete the Work or Services; or otherwise, the Consultant shall be liable to the

County for any increased cost of the Project reasonably incurred by the County in the process of completing the Consultant's unfinished Work and Services. As such, County may apply unpaid

Compensation due and owing to the Consultant prior to the default as a set off against the costs incurred by the County for taking over such Work or Services.

9. In the event that there is a partial termination of a Contract by the County or Consultant because of non-appropriation by County, subject to Term of Contract and Contract Price and Compensation, Consultant shall be paid in accordance with terms of this Article, to the date of termination on a prorated basis for any task, milestone, or Deliverable started but not completed which were designated for payment on a payment schedule provided to the County prior to the commencement of work on the task, milestone or Deliverable which is the subject of the partial termination. County’s obligation to pay

Consultant under a Contract is limited to the budgeted amount for the fiscal year approved by the Volusia

County Council for the then current fiscal year of a Contract and is otherwise limited to legally available non-ad valorem tax revenues. Consultant shall have no right to compel the Volusia County Council to appropriate funds for any fiscal year to pay the compensation set forth in Contract Price and

Compensation. Consultant and County shall be obligated to continue performance under a Contract for the work or services within the Scope of Work or Services under a Contract which is not the subject of the partial termination by non-appropriation.

10. If termination of a Contract occurs for any reason:

10.1. The County shall continue to have the unfettered right to use or access any license, designs, plans, or exhibits, any of the Deliverables or work products from tasks or milestones, arising under that Contract and produced pursuant to the Contract Documents for which the County has paid prior to termination of a Contract or for which County makes payment after termination of a Contract.

11. Except as otherwise provided in a Contract, Consultant shall return to the County all County

Confidential Information in Consultant’s possession and Consultant shall certify in a written document signed by the Consultant that all such information has been returned.

12. Except as otherwise provided in a Contract, the County shall return to Consultant or destroy all

Consultant’s Confidential Information in the County’s possession (including, without limitation, all devices, records, data, notes, reports, proposals, lists, correspondence, specifications, drawings, blueprints, sketches, materials, equipment or other documents or property relating to such Consultant’s

Confidential Information and all copies of any of the foregoing (in whatever medium recorded)) and all

Third-Party Products in its possession not yet accepted and not yet paid for in full together with all copies of documentation and other material related thereto, and shall certify in a written document signed by the County Project Manager that all such information and material has been returned or destroyed.

13. For all undisputed outstanding invoices submitted to the County prior to the effective date of the termination and subject to Term of Contract, Contract Price and Compensation, and this Article, the

County shall cause payments to be made to Consultant within forty five (45) days of receipt of invoice.

Consultant shall invoice the County for any sums Contactor claims to be owed by County under a Contract for work performed from the last invoice to the effective date of termination. County shall review such invoice for payment and County shall pay any undisputed amount within forty-five (45) days.

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

14. In the event of termination by the County for non-appropriation, for all items or products ordered by

Consultant before receipt by Consultant of the Notice of Termination which Consultant could not cancel without imposition of a fee, the County shall cause payments to be made to Consultant within forty-five

(45) days of receipt of an undisputed invoice for all cancellation, restocking or residual fees resulting from the cancellation or return of third party products ordered from or shipped by the vendor thereof prior to the effective date of the termination.

15. All provisions of a Contract which imposes or contemplates continuing obligations on a party will survive the expiration or termination of a Contract.

4. General Terms and Conditions

4.1. Submission of Offers

The County of Volusia is requesting proposals for the service and/or product(s) detailed within this solicitation. If your company is interested in submitting a proposal to provide this service and/or product(s), please provide the requested information in this solicitation, complete the included forms, and submit these documents with your response through OpenGov Procurement, at https://procurement.opengov.com/portal/volusia, by the date and time posted. The submission of responses prior to the specified date and time is solely and strictly the responsibility of the Respondent.

Responses received after the posted date and time will not be considered. Additional information may be submitted with the response. No offer may be modified after acceptance. Terms and conditions differing from those in this solicitation may be cause for disqualification of the Response. Failure to provide the required information may result in the Response not being considered.

Responses submitted in OpenGov will remain locked and inaccessible by County purchasing staff until the Submission deadline.

Do not submit confidential information, proprietary information and/or trade secrets.

4.2. Respondent's Responsibility

The Respondent, by submitting a Response, represents that:

A. The Respondent has read and understands the Solicitation in its entirety and that the Response is made in accordance therewith;

B. The Respondent possesses the capabilities, resources, and personnel necessary to provide efficient and successful service to the County;

C. The Respondent has made all investigations and examinations necessary to ascertain site and/or local conditions and requirements affecting the full performance of the Agreement and to verify any representations made by the County of Volusia, Florida, upon which the Respondent will rely.

If the Respondent receives an award because of its Response, failure to have made such investigations and examinations will in no way relieve the Respondent from its obligations to comply in every detail with all provisions and requirements of the Agreement, nor will a plea of

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering ignorance of such conditions and requirements be accepted as a basis for any claim by the

Respondent for additional compensation or relief; and, D. The Respondent will be held responsible for any and all discrepancies, errors, etc., in discounts or rebates which are discovered during the Agreement term or up to and including three (3) fiscal years following the County’s annual audit.

E. The Respondent shall examine the drawings, specifications, and other Contract Documents (as applicable) carefully and inform itself thoroughly regarding any and all conditions and requirements, including the construction schedule that may in any manner affect the Work to be performed under the Agreement. Ignorance on the part of the Contractor shall in no way relieve itself of the obligations and responsibilities assumed under the Agreement.

4.3. Opening

Pursuant to Section 119.071, Florida Statutes, responses and the completed tabulation will be available for inspection within thirty (30) days of Solicitation opening. Contact the Purchasing and Contracts Office during regular business hours to inspect responses and the completed tabulation or go to the County's eProcurement Portal for inspection of the completed tabulation. The foregoing notwithstanding, if, prior to the County’s making responses available for inspection, the County rejects all responses and concurrently provides notice of the County’s intent to reissue the solicitation, then the County may avail itself of the exemption for rejected responses set forth in Section 119.071, Florida Statutes, to the extent such Section may apply.

Solicitation openings and public meetings may be attended either in person or remotely. Solicitation openings may be accessed remotely as described in the introduction timeline section of this Solicitation.

In accordance with the American Disabilities Act and Section 286.26, Florida Statutes, persons with disabilities needing a special accommodation to participate in the proceedings, or an interpreter to participate in any proceedings, should contact the County’s ADA Coordinator at 386-248-1760 for assistance at least two (2) business days before any meeting date.

Assisted listening system receivers are available for the hearing impaired and can be obtained from the

Deputy Clerk by contacting the County’s ADA Coordinator at 386-248-1760. Read the full ADA Notice under The American with Disabilities Act (Title II), atwww.volusia.org/core/fileparse.php/4175/urlt/ADANotice.pdf. Read the County of Volusia Grievance

Procedure under The Americans with Disabilities Act (Title II).

4.4. Public Records Law

Pursuant to section 119.0701(2)(a), Florida Statutes, the County is required to provide Contractor with this statement and establish the following requirements as contractual obligations pursuant to the

Agreement:

IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER

119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC

RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC

https://www.volusia.org/core/fileparse.php/4175/urlt/ADANotice.pdf

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

RECORDS AT 386-736-5935, purchasing@volusia.org, by mail, Purchasing and

Contracts Division, Attn: Public Records Custodian, 123 W. Indiana Ave. Rm. 302

DeLand, FL 32720.

By entering into a Contract, Contractor acknowledges and agrees that any records maintained, generated, received, or kept in connection with, or related to the performance of services provided under a Contract are public records subject to the public records disclosure requirements of section 119.07(1), Florida

Statutes, and Article I, section 24 of the Florida Constitution. Pursuant to section 119.0701, Florida

Statutes, any Contractor entering into a Contract for services with the County is required to:

A. Keep and maintain public records required by the County to perform the Services and Work provided pursuant to the Contract.

B. Upon request from the County’s custodian of public records, provide the County with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes, or as otherwise provided by law.

C. Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the

Contract term and following completion or termination of the Contract if the Contractor does not transfer the records to the County.

D. Upon completion or termination of the Contract, transfer, at no cost, to the County all public records in the possession of the Contractor or keep and maintain public records required by the

County to perform the service. If the Contractor transfers all public records to the County upon completion or termination of the Contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion or termination of the Contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the County, upon request from the County’s custodian of public records, in a format that is compatible with the information technology systems of the County.

Requests to inspect or copy public records relating to the County’s Contract for Services must be made directly to the County. If Contractor receives any such request, Contractor shall instruct the requestor to contact the County. If the County does not possess the records requested, the County shall immediately notify the Contractor of such request, and the Contractor must provide the records to the County or otherwise allow the records to be inspected or copied within a reasonable time.

Contractor acknowledges that failure to provide the public records to the County within a reasonable time may be subject to penalties under section 119.10, Florida Statutes. Contractor further agrees not to release any records that are statutorily confidential or otherwise exempt from disclosure without first receiving prior written authorization from the County. Contractor shall indemnify, defend, and hold the

County harmless for and against any and all claims, damage awards, and causes of action arising from the

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

Contractor’s failure to comply with the public records disclosure requirements of section 119.07(1), Florida Statutes, or by Contractor’s failure to maintain public records that are exempt or confidential and exempt from the public records disclosure requirements, including, but not limited to, any third party claims or awards for attorneys' fees and costs arising therefrom. Contractor authorizes County to seek declaratory, injunctive, or other appropriate relief against Contractor from a Circuit Court in Volusia

County on an expedited basis to enforce the requirements of this section.

4.5. Confidential Information and Infringement

A. Confidential Information and/or Trade Secret do not include the following:

1. Information already known or independently developed the party in possession; or

2. Information in the public domain through no wrongful act of the party in possession; or

3. Information received by the party in possession from a third party who was free to disclose it; or

4. Information regularly disclosed to third parties without restriction on disclosure; or

5. Information required to be disclosed by law or an order of a court of competent jurisdiction.

B. Confidential Information and Infringement. If Contractor is licensing, or developing software

(including derivative works) for use by the County, Contractor grants County a perpetual, fully-paid, non-assignable, non-exclusive, royalty-free license to use Contractor’s software deliverables developed or licensed under a Contract. Said license includes software owned by Contractor which is furnished under a Contract, for County’s internal use with such use to include the right to modify such deliverable(s) and to create derivative works for such internal use including without limitation the right to use such deliverable(s).

C. If Contractor is licensing, providing or developing software, including derivative works for use by the County, Contractor agrees to protect and indemnify and hold harmless the County, its agents, elected officials and employees of the County from and against any and all claims, demands, actions, and causes of action which may arise asserting that all or any part of the Contractor licensed applications provided under any software owned by Contractor and licensed to County or provided by Contractor for use thereof by the County, infringes or misappropriates any third party’s United States patent, copyright or any trade secret protected under United States law.

1. In addition to the foregoing indemnification provision, Contractor shall also take the following steps to assure that County can continually use the software which Contractor has directly licensed to County or provided for use thereof by the County in substantially the same manner delivered or subsequently enhanced or modified by:

a. Promptly replace the allegedly infringing or misappropriated item or items with compatible, functionally equivalent itemswhich are not alleged to be infringing or misappropriated; or

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

b. Promptly modify the alleged infringing or misappropriated item or items to eliminate the alleged infringement or misappropriation without impairing County's intended use of the licensed applications and/or sublicensed applications in any manner; or

c. Promptly procure the right for the County to continue to use the licensed applications and/or sublicensed applications without modification; and

d. Unless otherwise agreed by the parties, promptly shall mean for the purposes of this section that the events described herein shall occur in no less than sixty (60) days from the date that notice of the claim is received by Contractor unless otherwise agreed by the parties.

D. In the event that Contractor does not enable the County to use that which Contractor has delivered through accomplishing one or more of the alternatives set forth in above within aforementioned time period set forth herein during the term of a Contract, Contractor shall be in material default of a Contract and subject to Termination.

E. If Contractor is granting a license or develops software for the County under this Contract, it hereby represents that:

1. Contractor is the sole owner of all right, title, and interest in and to the Contractor licensed software, user manuals and documentation, including all patents, copyrights, copyright rights, trade secrets, trademarks, trade names and all proprietary and intellectual rights and confidential information contained therein, and that it is authorized to enter into a Contract and grant County a perpetual license; and

2. No portion of any licenses or right granted to the County to use Contractor's software pursuant to the terms of the applicable software license contract of Contractor for any Work performed under a Contract violates or is protected by right, title, interest or similar right of any third person or entity.

4.6. Clarification, Correction of Entry, Minor Irregularities

The County of Volusia reserves the right to allow for the clarification of questionable entries and the correction of obvious mistakes. The County reserves the right to waive minor irregularities in Responses, providing such action is in the best interest of the County. Minor irregularities are defined as those that have no adverse effect on the County’s best interests, and will not affect the outcome of the selection process by giving the Respondent an advantage or benefit not enjoyed by other Respondents.

4.7. Revisions, Addenda, Questions & Answers

A. It is incumbent upon each Respondent to carefully examine the specifications, Scope of

Work/Service, terms, conditions and draft contract of this Solicitation. The posting of answers through the County's eProcurement Portal is the only official methods by which interpretation, clarification, or additional information can be given. Questions and exceptions concerning any

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering section of this Solicitation or the draft contract shall be submitted through the question and answer section of the County's eProcurement Portal.

B. If it becomes necessary for the County to revise or clarify any part of this Solicitation or the draft contract it will be updated on the County's eProcurement Portal by one of the following methods:

the posting of answers to questions received; the revision of Solicitation/contract language/documentation. It is each Respondent's responsibility to check the County's eProcurement Portal for any posted answers, and/or Solicitation/contract changes. Each

Respondent shall ensure that they have reviewed all questions & answers and/or changes to this

Solicitation/contract before submitting their Response. By submitting a Response, Respondents acknowledge that they have reviewed all posted answers, and/or Solicitation/contract changes prior to the posted closing date and time.

C. Each answer issued by the County shall become a material part of this Solicitation. Answers posted by the County, and/or changes made to the Solicitation/contract are authoritative and shall be considered an addendum to the Solicitation.

D. All information in this Solicitation, including information provided through the Question & Answer feature are incorporated into the Solicitation or any Contract resulting from this Solicitation.

E. Questions and exceptions shall be submitted before 11:59 pm on Tuesday, April 22, 2025.

Thereafter, no further questions or exceptions will be accepted or reviewed by the County and

Respondents’ right to submit questions or exceptions will terminate and any questions or exceptions not previously made shall be deemed waived. Oral representations will not be binding on the County.

4.8. Incurred Expenses

The County has no obligation to make an award as a result of this Solicitation, nor shall the County be responsible for any cost or expense which may be incurred by any Respondent in preparing and submitting a Response, or any cost or expense incurred by any Respondent prior to the execution of a Purchase Order or Contract/Agreement.

4.9. Disadvantaged Businesses

The County Council has adopted policies, which assure and encourage the full participation of

Disadvantaged Business Enterprises (DBE) in the provision of goods and services. The County encourages joint ventures between majority-owned firms and qualified disadvantaged, minority, and/or women-owned firms.

4.10. Consideration of Responses

A. For the purpose of award, after the Responses are unsealed and read, the correct summation of the lump sum prices and/or of the products of the estimated quantities shown in the Response and the unit prices will be considered the Response. The amounts will then be compared and the results of such comparison made available to the public. Until the final award of the Contract, the

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering right will be reserved to reject any and all responses and to waive technical errors and irregularities as may be deemed best for the interest of the County.

B. Responses which contain modifications, incomplete, unbalanced, conditional, obscure, or which contain additions not requested, or irregularities of any kind, or which do not comply in every respect with the instructions to Respondents and the Contract documents may be rejected at the option of the County. The County does not bind itself to accept the minimum Response stated herein, but reserves the right to accept any Response, the County deems to be the lowest responsive and responsible Respondent, and which in the judgment of the County will best serve the needs and interests of the County.

4.11. Withdrawal of Response

A Response may be withdrawn i) prior to the Solicitation opening via the County's eProcurement Portal or ii) after one hundred twenty (120) days from Solicitation opening. In the second instance (‘ii’), this only applies to Respondents notified by the County in letter form that their Response will not be accepted.

4.12. FOB Destination

The FOB point for this Agreement and for all purchases made under it shall be the destination specified by the requesting division, in Volusia County, Florida. Delivery will not be complete until the requesting division has accepted each item. Delivery to a common carrier shall not constitute delivery to Volusia

County. All disputes shall be between the Contractor and the carrier.

4.13. Payment Terms

Unless otherwise stated in the Special Terms and Conditions section, the County will remit full payment on all undisputed invoices within forty-five (45) days from receipt by the appropriate person(s) (to be designated at time of Agreement) of the correct invoice(s) or receipt of all products or services ordered in accordance with F.S.S. 218.74.

4.14. Unusual Costs

The Contractor may petition the County at any time for an additional rate adjustment on the basis of extraordinary and unusual changes in the costs of operation that could not reasonably be foreseen by a prudent operator and which, by all reasonable expectations, will continue for at least one (1) year. If the

Contractor petitions for such an increase, the Contractor shall also petition for a rate reduction on the basis of extraordinary and unusual changes in the costs of operation that could not reasonably be foreseen by a prudent operator and which, by all reasonable expectations, will continue for at least one (1) year;

failure to make such petition may be grounds for Agreement termination.

The Contractor’s request shall contain substantial proof and justification to support the need for the rate adjustment. The County may request from the Contractor, and the Contractor shall provide, such further information as may be reasonably necessary in making its determination. The County shall approve or deny the request, in whole or in part, within sixty (60) days of receipt of the request and all other additional information required by the County. Any price redetermination shall be solely based upon the documentation provided and the County reserves the right to rescind any price relief granted should the circumstances change and prices go down.

Title: CDBG-DR Orange City Mill Lake and Industrial Park Basin Drainage Improvements Design and Engineering

4.15. Additional Terms & Conditions

The County of Volusia reserves the right to reject offers containing terms or conditions contradictory to those requested in this Solicitation.

4.16. Taxes

County is exempt from Manufacturers’ Federal Excise Tax (Exemption# 49-6000-885) and Florida sales tax

(Exemption# 85- 8012622393C-9). Certificates are available at www.volusia.org/purchasing. After accessing the foregoing website, select, “Doing Business with Volusia County” and “Consumer Certificate of Exemption” from the available menu screens to see a copy of the certificates.

4.17. Meets/Minimum Specifications

The specifications listed in the Scope of Work are the minimum required performance specifications for this Solicitation; they are not intended to limit competition nor specify any particular Respondent, but to ensure that the County receives quality services. The Respondent represents that all offers to this

Solicitation shall meet or exceed the minimum requirements specified.

4.18. Silence of Specifications

The apparent silence of these specifications or any supplemental specifications as to details or the omission from same of any detailed description concerning any point, shall be regarded as meaning that only the best commercial practices are to prevail and that only materials of first quality and correct type, size, and design are to be used. All workmanship shall be first quality. All interpretations of specifications shall be made upon the basis of this statement.

4.19. Change in Scope of Work/Service

A. The County may order changes in the Work/Service consisting of additions, deletions, or other revisions within the general scope of the Agreement. No claims may be made by the Contractor that the scope of the project or of the Contractor’s services has been changed, requiring changes to the amount of compensation to the Contractor or other adjustments to the Agreement,…