CCGA_2706 Camden Pumps Drawings.pdf

PDF 2 MB Posted

Attached to
CCGA - 2706 Camden HVAC Pump Replacements
Solicitation number
PE-56300-RFQ-2027-000000029
Issued by
Barrow County, Brooklet City, Georgia

About this file

This is a set of technical drawings for the Camden Pumps project (CCGA-2706) at the College of Coastal Georgia, located at 316 Corporate Parkway in Macon, Georgia. The drawings, prepared by NBP Engineers, Inc. of Kingsland, Georgia, document mechanical and electrical work for upgrades to the heating, ventilation, and air conditioning (HVAC) systems and related infrastructure in Mechanical Room 131H and the facility's yard. The bid set, dated September 30, 2026, includes abbreviations, legends, schedules, and detailed plans for both demolition and new work. The scope encompasses removal of existing chillers, boiler pumps, chilled water pumps, tower pumps, and associated starters, along with installation of new pumps, variable frequency drives (VFDs), and combination starters. The drawings reference post-bid addendum no. 1 dated January 26, 2023, and expire on June 30, 2028, under COA# PEF000774.

The technical specifications include pump schedules detailing equipment such as chilled water supply/return pumps (SP-1 and SP-2) rated at 400 GPM, boiler pumps (BHP-1 and BHP-2) at 180 GPM, heating water pumps (HP-1 and HP-2) at 75 GPM, and tower pumps (TP-1 and TP-2) at 600 GPM, with associated horsepower, efficiency ratings, and manufacturer details. The drawings provide comprehensive piping layouts, control valve arrangements, and electrical single-line diagrams for VFD packages, indicating the coordination required between mechanical and electrical divisions. No pricing information, set-asides, incumbent contractor details, or contract term specifics are documented in these technical drawings.

View the file

Other files

File Type Posted
2706 Camden HVAC Pumps STATEMENT OF BIDDER QU.docx DOCX document
DBB_Full_Document___CCGA_2706 CAMDEN CENTER H.docx DOCX document
2706 Camden HVAC Pumps Invitation to Bid.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

TITLESHEET NO.

316 CORPORATE PARKWAY MACON, GEORGIA

NBP ENGINEERS, INC.

CONSULTANTS

Kingsland, Georgia

COLLEGE OF COASTAL GEORGIA

M301

ABBREVIATIONS, LEGENDS, & SCHEDULES - HVACM001

M002 DETAILS - HVAC

M302

09.30.2026 BID SET

LARGE SCALE - MECHANICAL ROOM 131H & YARD - DEMOLITION - HVAC

LARGE SCALE - MECHANICAL ROOM 131H & YARD - NEW WORK - HVAC

E301

E302

LARGE SCALE - MECHANICAL ROOM 131H & YARD - DEMOLITION - ELEC

LARGE SCALE - MECHANICAL ROOM 131H & YARD - NEW WORK - ELEC

Camden Pumps

CCGA-2706

SEAL

SCALE:

FILE PATH:

P:\26069\26069m001.dgn

DATE PLOTTED

DGN FILE

01-OCT-2026

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\26069\26069m001.dgn

AS SHOWN

26069

K in g s la n d

G e o rg ia

C o ll e g e o f C o a s ta l G e o rg ia

09.30.2026

WSH

LTF

WSH

B

ID

S E

T

EXPIRES: 06.30.2028

COA#PEF000774

NBP ENGINEERS, INC.

C a m d e n P u m p s

C C

G A -2

M001

CHS CHR

HWS HWR

CR

D

SPF

HTWS HTWR

DTS DTR

CHILLED WATER SUPPLY CHILLED WATER RETURN

HEATING WATER SUPPLY HEATING WATER RETURN

CONDENSER WATER SUPPLY CONDENSER WATER RETURN

CONDENSATE DRAIN

FIRE PROTECTION MAIN STANDPIPE

HIGH TEMP. SUPPLY HIGH TEMP. RETURN

DUAL TEMP. SUPPLY DUAL TEMP. RETURN

R REFRIGERANT PIPING

RL REFRIGERANT LIQUID

CONDENSATE DRAIN

CS

RS REFRIGERANT SUCTION

RG REFRIGERANT HOT GAS

HIGH PRESSURE STEAM

LOW PRESSURE STEAM

(15 PSIG. MAX)

CR CONDENSATE RETURN (LP)

PC PUMPED CONDENSATE

50#

STEAM

(PRESSURE INDICATED)

SOLENOID VALVE RELIEF VALVE

GATE VALVE WITH

3/4" HOSE END

NEEDLE VALVE

OS&Y GATE VALVE .

GAS COCK

AUTOMATIC AIR VENTAAV

GAUGE WITH COCK

BOILER DRAIN PIPE TEST PLUG

FLEX. PIPE CONN. BACKFLOW PREVENTER

MANUAL AIR VENT

STRAINER

ELBOW UP ELBOW DOWN

BRANCH OUT BOTTOM BRANCH OUT TOP

TEE OUT BOTTOM TEE OUT TOP

SCREWED UNION FLANGED UNION

PIPE CAP BLIND FLANGE

PIPE SLEEVE

CONCENTRIC REDUCER

PIPE ANCHOR

HVAC LEGEND

BALANCE VALVE

SCREWED & FLANGED

SCREWED & FLANGED

SCREWED & FLANGED

SCREWED & FLANGED

SCREWED & FLANGED

GLOBE VALVE

CHECK VALVE

2-WAY CONTROL VALVE

CONTROL VALVE

PLAN VIEW

ECCENTRIC REDUCER

GAUGE COCK

3-WAY MIXING

VALVE IN VALVE BOX

CONTROL VALVE

HPS

THERMOMETER IN WELL

SEPARABLE SOCKET WELL

LPS

PLUG VALVE

MARK SERVICE TYPE GPM

MAX. MIN.

EFF. %2

MANUFACTURERS

REMARKS

DYNAMIC MIN.

HEAD

SHUT OFF

TACO

RPM

HP B&G PATTERSONFT. H O

PUMP SCHEDULE

SCHEDULE - HVAC

LEGEND, &

ABBREVIATIONS,

1 01.26.23POST BID ADDENDUM NO. 1

SP-1

SP-2

BHP-1

BHP-2

HP-1

HP-1

BLDG CHW

BLDG CHW

BLR-1

BLR-2

BLDG HW

BLDG HW

ES

ES

VIL

VIL

VIL

VIL

3BD

3BD

3x3x7C

2x2x9.50C

3x3x7C

2x2x9.50C

4x3x9.5

3x3x7.25

2x2x9.5

4x3x9.5

3x3x7.25

2x2x9.5

4x3x9.5

3x3x7.25

2x2x9.5

4x3x9.5

3x3x7.25

2x2x9.5

60 65 1750 15 75TP-1 & 2 VT 600 12LD 1 STAGE PUMPS---- ----

MARK SERVICE TYPE GPM

MAX. MIN.

EFF. %2

LAYOUT BASIS:

REMARKS

HP B&GFT. H O

TP-1

TP-2

VT

VT

TOWER PUMP SCHEDULE

COOLING TOWER

COOLING TOWER

COOLING TOWER

APPROXIMATE

10RJMC

10RJMC

A COMPRESSED AIR

AAV AUTOMATIC AIR VENT

AF AIR FOIL

-AFF ABOVE FINISHED FLOOR

AV ACID VENT

AVD AUTOMATIC VOLUME DAMPER

AW ACID WASTE

-AC ABOVE CEILING

AH- AIR HANDLING UNIT

BBD BOILER BLOW DOWN

BE BOTTOM ELEVATION

BOL BOTTOM OF LINE (UNINSULATED)

BOD BOTTOM OF DUCT

BP- BOOSTER PUMP

BTUH BRITISH THERMAL UNIT PER HOUR

-BF BELOW FLOOR

BFP BACK FLOW PREVENTOR

C CONDUIT

CC COOLING COIL

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CR CONDENSER WATER RETURN

CS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CAB CABINET FAN

CF CENTRIFICAL FAN

CFM CUBIC FEET PER MINUTE

CFP CHEMICAL FEED PUMP

CFT CHEMICAL FEED TANK

CH CABINET HEATER

CHR CHILLER

CL CENTER LINE

CO CLEANOUT

CP CHILLER PUMP

CPHB CHROME PLATED HOSE BIBB

CT COOLING TOWER

CU COPPER

CV- CONVECTOR

Cv VALVE COEFFICIENT

D DRAIN

DDC DIRECT DIGITAL CONTROL

DHW DOMESTIC HOT WATER

DN DOWN

DP DIFFERENTIAL PRESSURE

DS DOWN SPOUT

DSO DOWN SPOUT OVER FLOW

DX DIRECT EXCHANGE

EAD EXHAUST AIR DAMPER

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB

EWB ENTERING WET BULB

ESP END SUCTION PUMP

ESP EXTERNAL STATIC PRESSURE

ELL ELBOW

ET EXPANSION TANK

EQT EQUIPMENT TRAP SET

EWT ENTERING WATER TEMPERATURE

EX EXPANSION TANK LINE

EXT EXTERNAL

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

F&BP FACE & BYPASS

FC FAN COIL UNIT

BPD BYPASS DAMPER

EAL EXHAUST AIR LOUVER

ECH ELECTRIC CABINET HEATER

ABBREVIATIONS

FD FLOOR DRAIN

FF FOULING FACTOR

FF- FLY FAN

FF FINISHED FLOOR

FF FINAL FILTER

FFM FIRE FLOW METER

FLEX FLEXIBLE

FM FIRE MAIN

FMS FLOW METER STATION

FOF FUEL OIL FLOW

FOR FUEL OIL RETURN

FOV FUEL OIL VENT

FOP FUEL OIL PUMP

FP FIRE PUMP

FP- FAN POWERED

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRT FLOW RATE TRANSMITTER

FT FEET

G LOW PRESSURE GAS

GA GAUGE

GPM GALLONS PER MINUTE

GT GREASE TRAP

GTH GRAND TOTAL HEAT

H HEIGHT

HC HEATING COIL

HB HOSE BIBB

HBT HORIZONTAL BLOW THROUGH

HD HUB DRAIN

HDT HORIZONTAL DRAW THROUGH

HP HORSEPOWER/HIGH PRESSURE

HPA HIGH PRESSURE AIR

HPG HIGH PRESSURE GAS

HPS HIGH PRESSURE STEAM

HPWS HEAT PUMP WATER SUPPLY

HPWR HEAT PUMP WATER RETURN

HSC HORIZONTAL SPLIT CASE

HWG HOT WATER GENERATOR

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

ILC IN-LINE CENTRIFICAL

IT INTERVAL TIMER

IN INCHES

INV INVERT

JB JUNCTION BOX

L LENGTH

LR LONG RADIUS

LAT LEAVING AIR TEMPERATURE

LCP LOCAL CONTROL PANEL

LDB LEAVING DRY BULB

LN LIQUID NITROGEN

LWB LEAVING WET BULB

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM

MAV MANUAL AIR VENT

MVD MANUAL VOLUME DAMPER

MAX MAXIMUM

MBH ONE THOUSAND BTUH PER HOUR

MCC MOTOR CONTROL CENTER

MIN MINIMUM

MH MAN HOLE

MP SUMP (MUD) PUMP

MPS MEDIUM PRESSURE STEAM

MPR MEDIUM PRESSURE RETURN

MTS MEDIUM TEMPERATURE SUPPLY

MTR MEDIUM TEMPERATURE RETURN

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MZ MULTIZONE

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTSIDE AIR DAMPER

ODT OUTDOOR TEMPERATURE

PC PUMP CONDENSATE

PD PRESSURE DROP

PRV PRESSURE REDUCING VALVE

PWF PROPELLER WALL FAN

R REFRIGERANT

RA RETURN AIR

RAD RETURN AIR DAMPER

RAS RELIEF AIR SUPPLY

RP RECIRCULATING PUMP

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RD ROOF DRAIN

RV RELIEF VALVE

SR SHORT RADIUS

OAL OUTSIDE AIR LOUVER

SAN SANITARY SEWER

SC SILL COCK

SCD SMOKE DAMPER

SD STORM DRAIN

SD SMOKE DETECTOR

SF SQUARE FEET

SDO STORM DRAIN OVERFLOW

SHC SENSIBLE HEAT CAPACITY

SP STAND PIPE

SP SUMP PUMP

SPS STATIC PRESSURE SENSOR

STA STATION

TR TEMPERED WATER RETURN

UG UNDERGROUND

VAC VACUUM PIPING

VDT VERTICAL DRAW THROUGH

VTR VENT THROUGH ROOF

WB WET BULB

O2 OXYGEN

F DEGREES FAHRE C DEGREES CENTI

WM WATER METER

WL WATER LINE

WH WATER HEATER

WG WATER GAUGE

W WIDTH

W WASTE

VT VERTICAL TURBINE

VFD VARIABLE FREQUENCY DRIVE

VB VACUUM BREAKER

VAV VARIABLE AIR VOLUME

V VENT

UC UNDERCUT (DOOR - 3/4")

V- VALVE

TOS TOP OF STRUCTURE

TB THRUST BLOCK

T TEMPERED WATER

STR STRAINER

SP STATIC PRESSURE

SP SPRINKLER PIPE

SG SPECIALTY GAS

EUH ELECTRIC UNIT HEATER

RECIRCULATING

DHR DOMESTIC HOT WATER

TRANSMITTER

DPT DIFFERENTIAL PRESSURE

PER MINUTE

SCIM STANDARD CUBIC INCHES

TEMPERATURE

SST SATURATED SUCTION

(UNINSULATED)

TE TOP ELEVATION

(TOWER) PUMP

TP CONDENSER WATER

FSD FIRE/SMOKE DAMPER

EA EXHAUST AIR

MA MIXED AIR

AE ADJUSTABLE AIR EXTRACTOR

RAO RETURN AIR OPENING

AD AREA DRAIN/ACCESS DOOR

SEAL

SCALE:

FILE PATH:

P:\26069\26069m002.dgn

DATE PLOTTED

DGN FILE

01-OCT-2026

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\26069\26069m002.dgn

AS SHOWN

26069

K in g s la n d

G e o rg ia

C o ll e g e o f C o a s ta l G e o rg ia

09.30.2026

WSH

LTF

WSH

T

EXPIRES: 06.30.2028

COA#PEF000774

NBP ENGINEERS, INC.

C a m d e n P u m p s

C C

G A -2

M002

DETAILS - HVAC

BRANCH CIRCUIT FROM

PANELBOARD,SWITCHGEAR,OR MCC

(2600)

SYSTEM SHOWN IN NORMAL (VFD NOT BYPASSED)

NUMBERS IN PARENTHESES INDICATE DIVISION

UNDER WHICH WORK OR EQUIPMENT IS SPECIFIED.

NOT TO SCALE

MODE, MOTOR RUNNING.

OVERLOAD

CIRCUIT

BREAKER

VFD SINGLE LINE DIAGRAM

VFD PACKAGE

RECTIFIER AND

INVERTER

NOTES:(THIS DETAIL ONLY)

TYPICAL END SUCTION PUMP

ELEVATION

FLEXIBLE CONNECTION

FLEXIBLE COUPLING AND

COUPLING GUARD

PIPE INSULATION

PRESSURE GAUGE

TEST PLUG

‚" BALL VALVE, TYPICAL

ADJUSTABLE FOOT

FULL SIZE BLOWDOWN ‚" DRAIN

TO FLOOR DRAIN

PAN (CHILLED WATER

PUMP(S) ONLY

18 GA. S.S. DRIP

2"

1"

SUCTION DIFFUSER

WITH STRAINER

CONCRETE BASE AS SPECIFIED

BALL OR BUTTERFLY

•" DRAIN TAPPING

PIPE TO FLOOR DRAIN

CIRCUIT SETTER

NOT TO SCALE

(2600)

(2300)

MOTOR (2300)

18 GA. S.S. DRIP PAN

(CHILLED WATER PUMP(S)

ONLY)

TEST PLUGS

1/2" SCH. 40 TO DRAIN (CHILLED

WATER PUMP(S) ONLY

LIQUID TIGHT,NEOPRENE COATED

FLEXIBLE CONDUIT

RIGID CONDUIT STUB

TO 3" ABOVE BASE

CONCRETE BASE

AS SPECIFIED

BEVEL

4"

4" 4"

NOT TO SCALE

END SUCTION PUMP

PLAN

WALL

AS SYSTEM PIPE.

MANUAL AIR VENT

TERMINATE DRAIN WITH HOSE END

CONNECTION 18" ABOVE FLOOR.

WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE

CEILING. LOCATE VALVE AND TERMINATE DRAIN

HERE, UNLESS NOTED OTHERWISE AND POSITION

VALVE FOR VERTICAL DOWN DISCHARGE.

•" PIPE SAME MATERIAL

2•"

VERTICAL

PIPE

SUPPORT

WELDED PIPETHREADED / BRAISED

PIPING

BALL VALVE (EXPOSED) OR

GATE VALVE (CONCEALED)

ARRANGEMENT FOR LOCATIONS

WITH LIMITED CLEARANCE

6"MAX.

NOT TO SCALE

UPCONC. LOADING DOCK

MECHANICAL

ROOM

131H

PLAN

ROOM

131G

TOILET

131J

ELECTRICAL

ROOM

131I

46 47 48 49

R

S

T

Q

U

SEAL

SCALE:

FILE PATH:

P:\26069\26069m301.dgn

DATE PLOTTED

DGN FILE

01-OCT-2026

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\26069\26069m301.dgn

AS SHOWN

26069

K in g s la n d

G e o rg ia

C o ll e g e o f C o a s ta l G e o rg ia

09.30.2026

WSH

LTF

WSH

T

EXPIRES: 06.30.2028

COA#PEF000774

NBP ENGINEERS, INC.

C a m d e n P u m p s

C C

G A -2

M301

SCALE:

= 1'-0

4 0 2 4 8

6"

6"

CHR-1

REFRIGERANT MONITOR

EXISTING FAN SF-4

INTERLOCK WITH

CHR-2

6"

6"

BLR-1

WH

FUTURE CHILLERCP-1SP-1

FUT. CP

VFD-3

AH-4

T

SAF-4

UH-1

FILTER F-3

10"{

EF-12

EF-13

T

G

T

225KVA

T

30KVA

HLS

ATS-Q

ES

HX

C

HGQ

B

A

MAIN

LX

LM

LGQ

HX

XLGQ

XLM

EXISTING PIPES-IN

CAP ON ROOF

16"{ UP TO

FD

AP

FM

FM

FM

FM

3"

3"DN

M U

W

MUW

B.E. @12'0"

FRT

6" DN

6" DN

PLG.

GAS IN

AP

FD

P L

U M

B

IN

G

F P

SD

FD

24"x16" OPENING w/FD

C H S

C H

R

C S

C S

C R

C S

C R

H W

S

H W

R

R V

R V

C S

C S

C R

"H

W S

2" CHR

2" CHS

4"HWR

4"HWS

8"CHR

"C

H R

"C

H S

H W

R

6"CHS

8"CHR

"C

H S

GAS METER

T UH-1

SAF-4

PURGE SWITCH

EXISTING MANUAL

REFRIGERANT LEAK INDICATOR

EXISTING SURFACE MOUNTED REMOTE

RA

36/18 RA

SEE FIRE

C H S

CP-2

ATS-LS

SWITCHBOARD

MAIN

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

EXISTING

EXISTING

ACP-CH/HW

STARTERS(2)

STACKED

METAL PLENUM

LOUVER w/12" DEEP

EXISTING 24"x24"

CR

OAL ABOVE DOOR

EXISTING 72"X42"

EXISTING

EXISTINGEXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

BLR-2

CONC. PAD

EXISTING

EXISTING HW BYPASS FEED

CT CHEM TREAT

EXISTING

EXISTING

EXPANSION TANK

EXISTING CHW

EXISTING CH BYPASS FEED

OA DUCT

EXISTING 12"{

EXISTING MVD

EXISTING

EXISTING

EXISTING HW EXPANSION TANK

EXISTING STARTER

REMOVE CHW PUMP SP-1

REMOVE EXISTING

CHW PUMP SP-2

REMOVE EXISTING

EXISTING AIR SEPARATOR

REMOVE EXISTING COMBINATION STARTERS

HP-1 & 2HW PUMPS

REMOVE EXISTING

BHP-1 & BHP-2

BOILER PUMPS

REMOVE EXISTING

H W

S

H W

R

COMBINATION STARTERS

TOWER PUMP

REMOVE EXISTING

CT-2

CT-1

6"CR

6"CR

"C

R "C

R

C R

CONC. SUMP

EXISTING

VFD-4

SUPPORT

2"{ PIPE

LARGE SCALE - MECHANICAL ROOM 131 H & YARD - DEMOLITION - HVAC

TOWER PUMP TP-2

REMOVE EXISTING

TOWER PUMP TP-1

REMOVE EXISTING

DEMOLITION - HVAC

ROOM 131H & YARD-

MECHANICAL

LARGE SCALE -

UPCONC. LOADING DOCK

MECHANICAL

ROOM

131H

PLAN

ROOM

131G

TOILET

131J

ELECTRICAL

ROOM

131I

46 47 48 49

R

S

T

Q

U

SEAL

SCALE:

FILE PATH:

P:\26069\26069m302.dgn

DATE PLOTTED

DGN FILE

01-OCT-2026

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\26069\26069m302.dgn

AS SHOWN

26069

K in g s la n d

G e o rg ia

C o ll e g e o f C o a s ta l G e o rg ia

09.30.2026

WSH

LTF

WSH

T

EXPIRES: 06.30.2028

COA#PEF000774

NBP ENGINEERS, INC.

C a m d e n P u m p s

C C

G A -2

6"

6"

CHR-1

REFRIGERANT MONITORCHR-2

6"

6"

BLR-1

WH

FUTURE CHILLERCP-1

FUT. CP

VFD-3

AH-4

T

SAF-4

UH-1

FILTER F-3

10"{

EF-12

EF-13

T

G

T

225KVA

T

30KVA

HLS

ATS-Q

ES

HX

C

HGQ

B

A

MAIN

LX

LM

LGQ

HX

XLGQ

XLM

EXISTING PIPES-IN

CAP ON ROOF

16"{ UP TO

FD

AP

FM

FM

FM

FM

3"

3"DN

M U

W

MUW

B.E. @12'0"

FRT

6" DN

PLG.

GAS IN

AP

FD

P L

U M

B

IN

G

F P

SD

FD

24"x16" OPENING w/FD

C H S

C H

R

C S

C S

C R

C S

C R

H W

S

H W

R

R V

R V

C S

C S

C R

"H

W S

2" CHR

2" CHS

4"HWR

4"HWS

8"CHR

"C

H R

"C

H S

H W

R

6"CHS

8"CHR

"C

H S

GAS METER

T UH-1

SAF-4

PURGE SWITCH

EXISTING MANUAL

REFRIGERANT LEAK INDICATOR

EXISTING SURFACE MOUNTED REMOTE

RA

36/18 RA

SEE FIRE

C H S

CP-2

ATS-LS

SWITCHBOARD

MAIN

EXISTING

EXISTING

ACP-CH/HW

STARTERS(2)

STACKED

METAL PLENUM

LOUVER w/12" DEEP

EXISTING 24"x24"

CR

OAL ABOVE DOOR

EXISTING 72"X42"

EXISTING

EXISTINGEXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

BLR-2

CONC. PAD

EXISTING

EXISTING HW BYPASS FEED

CT CHEM TREAT

EXISTING

EXISTING

EXPANSION TANK

EXISTING CHW

EXISTING CH BYPASS FEED

OA DUCT

EXISTING 12"{

EXISTING MVD

EXISTING

EXISTING

EXISTING HW EXPANSION TANK

EXISTING AIR SEPARATOR

H W

S

H W

R

CT-2

CT-1

6"CR

6"CR

"C

R "C

R

C R

CONC. SUMP

EXISTING

VFD-4

SUPPORT

2"{ PIPE

M302

SCALE:

= 1'-0

4 0 2 4 8

LARGE SCALE - MECHANICAL ROOM 131 H & YARD - NEW WORK - HVAC

NEW WORK - HVAC

ROOM 131H & YARD -

MECHANICAL

LARGE SCALE -

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

PUMP TP-2

NEW TOWER

PUMP TP-1

NEW TOWER

FOR TOWER PUMPS

STARTERS/DISCONNECTS

COMBINATION

PROVIDE NEW

HP-1 & 2NEW

STACKED

BHP-1 & BHP-2

NEW BOILER PUMPS

NEW COMBINATION STARTERS FOR NEW PUMPS

PUMP SP-2

NEW CHW

PUMP SP-1

NEW CHW

NEW VFD'S

UPCONC. LOADING DOCK

MECHANICAL

ROOM

131H

PLAN

ROOM

131G

TOILET

131J

ELECTRICAL

ROOM

131I

46 47 48 49

R

S

T

Q

U

SEAL

SCALE:

FILE PATH:

P:\26069\26069e301.dgn

DATE PLOTTED

DGN FILE

01-OCT-2026

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\26069\26069e301.dgn

AS SHOWN

26069

K in g s la n d

G e o rg ia

C o ll e g e o f C o a s ta l G e o rg ia

09.30.2026

SHD

BCO

SHD

T

EXPIRES: 06.30.2028

COA#PEF000774

NBP ENGINEERS, INC.

C a m d e n P u m p s

C C

G A -2

E301

CHR-1

REFRIGERANT MONITORCHR-2

BLR-1

WH

FUTURE CHILLER

FUT. CP

VFD-3

AH-4

SAF-4

UH-1

EF-12

EF-13

G

T

225KVA

T

30KVA

HLS

ATS-Q

ES

HX

C

HGQ

B

A

MAIN

LX

LM

LGQ

HX

XLGQ

XLM

GAS IN

P L

U M

B

IN

G

F P

GAS METER

REFRIGERANT LEAK INDICATOR

EXISTING SURFACE MOUNTED REMOTE

SEE FIRE

CP-2

ATS-LS

SWITCHBOARD

MAIN

LINE LEGEND

EXISTING TO REMAIN

DEMOLITION

EXISTING

EXISTING

ACP-CH/HW

EXISTING

EXISTINGEXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

BLR-2

EXISTING

CP-1

EXISTING

EXISTING CT CHEM. TREAT

EXPANSION TANK

EXISTING HW

EXISTING

EXISTING CH BYPASS FEED

EXPANSION TANK

EXISTING CHW

EXISTING

SCALE:

= 1'-0

4 0 2 4 8

LARGE SCALE - MECHANICAL ROOM 131 H & YARD - DEMOLITION - ELEC

CT-2

CT-1

CONC. SUMP

COMBINATION STARTERS

TOWER PUMP

REMOVE EXISTING

VFD-4

EXISTING

EXISTING HW BYPASS FEED

REMOVE EXISTING COMBINATION STARTERS

HP-1 & 2HW PUMPS

REMOVE EXISTING

BHP-1 & BHP-2

BOILER PUMPS

REMOVE EXISTING

CHW PUMP SP-1

REMOVE EXISTING

PURGE SWITCH

EXISTING MANUAL

STARTERS(2)

STACKED

EXISTING

CHW PUMP SP-2

REMOVE EXISTING

CONC. PAD

EXISTING

EXISTING STARTER

REMOVE

TOWER PUMP TP-2

REMOVE EXISTING

TOWER PUMP TP-1

REMOVE EXISTING

DEMOLITION - ELEC

ROOM 131H & YARD-

UPCONC. LOADING DOCK

MECHANICAL

ROOM

131H

PLAN

ROOM

131G

TOILET

131J

ELECTRICAL

ROOM

131I

46 47 48 49

R

S

T

Q

U

SEAL

SCALE:

FILE PATH:

P:\26069\26069e302.dgn

DATE PLOTTED

DGN FILE

01-OCT-2026

SHEET NUMBER:

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

DESIGNED:

DATE:

PROJECT NUMBER:

P R

O J E

C T

T

IT

L E

SHEET TITLE:

CONSULTANTS

THIS DRAWING IS THE PROPERTY OF THE

ENGINEER AND MAY NOT BE REPRODUCED

OR USED IN WHOLE OR IN PART

WITHOUT HIS WRITTEN PERMISSION. IT IS

TO BE USED FOR THE PROJECT

SPECIFICALLY IDENTIFIED HEREIN AND TO

BE RETURNED UPON REQUEST.

P:\26069\26069e302.dgn

AS SHOWN

26069

K in g s la n d

G e o rg ia

C o ll e g e o f C o a s ta l G e o rg ia

09.30.2026

SHD

BCO

SHD

T

EXPIRES: 06.30.2028

COA#PEF000774

NBP ENGINEERS, INC.

C a m d e n P u m p s

C C

G A -2

CHR-1

REFRIGERANT MONITORCHR-2

BLR-1

WH

FUTURE CHILLER

FUT. CP

VFD-3

AH-4

SAF-4

UH-1

EF-12

EF-13

G

T

225KVA

T

30KVA

HLS

ATS-Q

ES

HX

C

HGQ

B

A

MAIN

LX

LM

LGQ

HX

XLGQ

XLM

GAS IN

P L

U M

B

IN

G

F P

GAS METER

REFRIGERANT LEAK INDICATOR

EXISTING SURFACE MOUNTED REMOTE

SEE FIRE

CP-2

ATS-LS

SWITCHBOARD

MAIN

EXISTING

EXISTING

ACP-CH/HW

EXISTING

EXISTINGEXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

EXISTING

BLR-2

EXISTING

CP-1

EXISTING

EXISTING CT CHEM. TREAT

EXPANSION TANK

EXISTING HW

EXISTING

EXISTING CH BYPASS FEED

EXPANSION TANK

EXISTING CHW

EXISTING

CT-2

CT-1

CONC. SUMP

VFD-4

EXISTING

EXISTING HW BYPASS FEED

PURGE SWITCH

EXISTING MANUAL

STARTERS(2)

STACKED

EXISTING

CONC. PAD

EXISTING

PUMP TP-2

NEW TOWER

PUMP TP-1

NEW TOWER

FOR TOWER PUMPS

STARTERS/DISCONNECTS

COMBINATION

PROVIDE NEW

HP-1 & 2NEW

STACKED

BHP-1 & BHP-2

NEW BOILER PUMPS

NEW COMBINATION STARTERS FOR NEW PUMPS

PUMP SP-2

NEW CHW

PUMP SP-1

NEW CHW

NEW VFD'S

E302

SCALE:

= 1'-0

4 0 2 4 8

LARGE SCALE - MECHANICAL ROOM 131 H & YARD - NEW WORK - ELEC

LINE LEGEND

POINT OF CONNECTION

EXISTING TO REMAIN

NEW WORK

NEW WORK - ELEC

ROOM 131H & YARD -

26069aCov
26069m001
26069m002
26069m301
26069m302
26069e301
26069e302

File details come from the government source that posted it. Updated .