CCGA_2705 Coffin Gym Air Handler Unit Replacement
This is a bid set of mechanical and electrical design drawings for the College of Coastal Georgia, prepared by NBP Engineers, Inc. of Macon, Georgia, for the Coffin Gym Air Handler Replacement project (CCGA-2705). The project involves the replacement of an air handling unit (AH-G-1) with associated heating coils (HC-G-1 and HC-G-2), a cooling coil, a fan array with five 5-horsepower fans, and related HVAC piping and controls. The drawings are dated September 30, 2026, with a certificate of authority (COA#PEF000774) expiring June 30, 2028. The bid set includes five sheets: abbreviations and legends (M001), HVAC details and schedules (M002), large-scale mechanical room plans and sections for demolition and new work (M301), HVAC flow diagrams (M401), and electrical plans including equipment removal and replacement (E301). The project requires removal of existing HVAC equipment, including the current air handler unit, pump, starter, ductwork components, and emergency lighting fixtures, with installation of new equipment and four LED strip light fixtures.
The design calls for specific HVAC specifications including an air handling unit with a fan array capable of 20,250 CFM maximum, heating coils sized at 5,750 MBH each, and a variable frequency drive (VFD) for fan control. The electrical work includes removal and replacement of fluorescent strip fixtures with LED equivalents and installation of new emergency lighting with 90-minute nickel cadmium battery backup. Direct digital control (DDC) system integration is detailed in the flow diagram, specifying inputs, outputs, and control logic for the HVAC system. The drawings note that existing duct smoke detectors should be protected during construction and reinstalled in new locations as indicated on the plans. The project requires coordination between HVAC demolition, new HVAC installation, and associated electrical work within the Coffin Gym mechanical room.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DBB_Full_Document_CCGA _ 2705 Coffin Gym AHU .docx | DOCX document | |
| 2705 Coffin Gym Air Handler INVITATION TO BID.docx | DOCX document | |
| 2705 Coffin Gym AHU STATEMENT OF BIDDER QUALI.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
SHEET NO. TITLE
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
College of Coastal Georgia
BOR CCGA-2705
M001 ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC
M002
M301
M401 FLOW DIAGRAM - HVAC
DETAILS - HVAC
E301
LARGE SCALE PLANS - MECH. RM. & SECTION - DEMOLITION & NEW WORK - HVAC
LARGE SCALE PLANS - MECH. RM. & SECTION - DEMOLITION & NEW WORK - ELEC
09.30.2026 BID SET
Coffin Gym Air Handler Replacement
P:\26016\26016m001.dgn
DATE PLOTTED
DGN FILE
01-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26016\26016m001.dgn
AS SHOWN
09.30.2026
26016
C o ll e g e o f C o a s ta l G e o rg ia
WSH
LTF
WSH
B O
R C
C G
A -2
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
B
ID
S E
T
C o ff in G y m A ir H a n d le r
R e p la c e m e n t
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
F DEGREES FAHRE C DEGREES CENTI
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
SINGLE LINE DUCT LEGEND
DUCT (SUPPLY, RETURN & EXHAUST)
SUPPLY DUCT UP
SUPPLY DUCT DOWN
RETURN OR EXHAUST DUCT UP
RETURN OR EXHAUST DUCT DOWN
DUCT RISE
DUCT DOWN
VOLUME DAMPER (MANUAL UNLESS INDICATED A.V.D.)
TRANSITION
DUCT TAKE-OFF (SEE SPEC. PERTAINING TO DEFLECTROLS)
TRANSITION (FLAT ON TOP)
TRANSITION (FLAT ON BOTTOM)
TRANSITION (TOP OR BOTTOM ONLY)
SUPPLY CEILING DIFFUSER
RETURN OR EXHAUST CEILING GRILLE
SIDEWALL SUPPLY
SIDEWALL RETURN
FLEXIBLE CONNECTION (DUCT)
RELIEF AIR SUPPLY TO TOILET
DUCT SPLIT WITH SPLITTER DAMPER
FLEX. DUCT WITH SCREW ON COLLAR, TAKE-OFF
DUCT WITH DUCT LINER
SQUARE ELBOW WITH TURNING VANES
RADIUS ELBOW (SEE SPECS. PERTAINING TO TURNING VANES)
AUTOMATIC VOLUME DAMPER
DN
R
12\10 SPLIT
OR
OR
SCD
FOB
T OR B
RAS
AVD
FD/SCD
FD
SMOKE CONTROL DAMPER
COMBINATION FIRE/SMOKE CONTROL DAMPER
FIRE DAMPER (FD)
FIRE DAMPER
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALL VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
BALL VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
SCHS
SCHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
CHILLED WATER FLOW
CHILLED WATER RETURN
CHS
CHR
WATER SUPPLY
SECONDARY CHILLED
WATER RETURN
SECONDARY CHILLED
CV
CVA
CONSTANT VOLUME
ADJUSTABLE
CONSTANT VOLUME
CFM
PRESSURE SENSOR
M001
SCHEDULES - HVAC
LEGENDS, &
ABBREVIATIONS,
TOTAL MIN. O.A. EXT. S.P.
IN H O2
AIR HANDLING UNIT SCHEDULE
MAX. COIL
FACE VEL.
SENSIBLE TOTAL
M.B.H.
ENTERING AIR LEAVING AIR
MAX. MAX.
MOTOR
HP
ACCESSORIES
VALVE
CV
COOLING COIL
APPROX.
T.S.P.
IN H O2
MAX.
MARK
TYPE
FAN
NOTES:
EWT LWT WPD (FT.)APD (IN.)MBH
FPM
DB WB DB WB GPMCFM CFM
MARK
SIZE
PIPE RUN
CV
VALVE
MBH EAT LAT EWT LWT GPM
APD
MAX.
CFM
MAX.
DUCT MOUNTED HEATING COIL SCHEDULE
5 FAN ARRAY.
5 HP PER FAN.
1.25 3.00 500 575 946 54.5 54.0 160 1.00 125745716981255,00020,250FAN ARRAY 1AH-G-1
36x36HC-G-1 5,750 1 •"7.617130160100602500.25
36x36HC-G-2 5,750 1 •"7.617130160100602500.25
NOTES:
WxH
MIN. SIZE
P:\26016\26016m002.dgn
DGN FILE
01-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26016\26016m002.dgn
AS SHOWN
09.30.2026
26016
C o ll e g e o f C o a s ta l G e o rg ia
WSH
LTF
WSH
B O
R C
C G
A -2
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
T
C o ff in G y m A ir H a n d le r
R e p la c e m e n t
M002
DETAILS - HVAC
ƒ" CHAMFER
ALL SIDES UNLESS OTHERWISE NOTED
EQUIPMENT
4" MINIMUM ALL SIDES
6" X 6", 10\10 WELDED WIRE
FABRIC AT MID-DEPTH OF
PAD (UNLESS OTHERWISE NOTED)
SLAB, FLOOR, OR SUPPORTING STRUCTURE.
ROUGH UP WHERE CONCRETE DOES NOT HAVE
BROOM FINISH OR ROUGHER
6" THICK CONCRETE
(INERTIA PAD IDENTICAL)
HOUSEKEEPING PAD DETAIL
A
B
DRAIN LINE SHALL BE
AT LEAST THE SAME
SIZE AS THE NIPPLE
ON THE DRAIN PAN
DRAIN
PAN
1"
ADAPTER
CLEAN OUT
SEDIMENT BUCKET
LOOSE CAP
GRATE
REMOVABLE
FITTING
LOOSE
THIS SIDE
FLOOR DRAIN (REFER TO DIVISION 220000)
FLOOR
PER FOOT SLOPE
MINIMUM 1/8 INCH
SLOPE TO DRAIN AT
1" (MIN)
DRAIN PIPE AS SPECIFIED
2" MAX.
REQUIRED BY CONDITIONS
DRAIN TERMINATION AS
UNIT TYPE
WHERE X = STATIC PRESSURE IN PAN IN INCHES - H2O
A B
BLOW THRU 1" MIN. 1.5"X
NOT TO SCALE
DRAW THRU 2" PLUS X X
AIR HANDLING UNIT DRAIN TRAP
NOT TO SCALE
TYPICAL DRAIN VALVE CONNECTION
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
ƒ" GATE VALVE
ADAPTER TO ƒ" HOSE THREAD
PROVIDE HOSE CAP NUT
NOTES:
DRAIN ALL LOW POINTS AS INDICATED ABOVE.1.
2.WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
NOT TO SCALE
TEST PLUG
STRAINER
CIRCUIT SETTER
CHECK VALVE
PIPES SUPPORT
PRESSURE GAUGE
GAUGE COCK
VERTICAL IN-LINE PUMP DETAIL
VERTICAL INLINE PUMP
NOT TO SCALE
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL)
ƒ" GATE VALVE W/
HOSE END ADAPTER (TYPICAL)
BALL OR BUTTERFLY VALVE
BUTTERFLY VALVE
CIRCUIT SETTER
BUTTERFLY VALVE
TEST PLUG (TYP)
THERMOMETER
SUPPLY
RETURN
BALL VALVE
w/ HOSE ADAPTORUNION
COIL
(PROVIDE M.A.V. IF COIL IS NOT SELF VENTING)
STACKED COILS PROVIDED WITH UNIT)
(PROVIDE CONNECTIONS FOR NUMBER OF
N.O.
AIR
F
LO
W
NOT TO SCALE
AIR HANDLING UNIT PIPING ISOMETRIC COOLING COIL
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
UPPER LEVEL - MECH. RM. - DEMOLITIION - HVAC
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
84/42
HC-G-1
AHU-G-1
36/96
36"{
96/36
AHU-G-1
ELEC.
36"{
ACCESS DOOR BELOW
INSULATED SHEETMETAL BLANK
R S
CD
ROOF
GRADE
CH PIPIES
34/34
2"
BELOW
24/120
HW
D N
HWS
HWR PIPES DOWN
K
HWS
K
AP
AP
42/24 OA DUCT-UP W/MAX OAD-1
RAG
M301
SA DUCT
FLOOR
VFD
HC-G-1
ACP-G-1
CD
C D
AHU-G-1
AP
M301
M301
NEW WORK - HVAC
DEMOLITION &
MECH. RM. & SECTION -
LARGE SCALE PLANS -
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
LINE LEGEND
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
SCALE:
= 1'-0
4 0 2 4 8
UPPER LEVEL - MECH. RM. - NEW WORK - HVAC
LARGE SCALE -
SECTION @ AH-G-1 - NEW WORK - HVAC
M301
M301
REMOVE
LOWER LEVEL - GYM MECH. RM. 156 - DEMOLITIION - HVAC
LARGE SCALE -
LOWER LEVEL - GYM MECH. RM. 156 - NEW WORK - HVAC
LARGE SCALE -
REMOVE
AP
REMOVE
METAL PLENUM
REMOVE LINED
ACCESS DOOR
REMOVE 60"x18"
TO REMAIN
REMOVE EXISTING PUMP STARTER
REMOVE EXISTING HW PUMP
EXISTING
REMOVE
BUTTERFLY VALVES IN VERTICAL
REMOVE CHWR/S PIPING TO EXISTING
INSULATED SHEET METAL BLANK TO REMAIN
INSULATED METAL PLENUM TO REMAIN
REPLACE EXISTING ACTUATOR
42/24 OA DUCT-UP w/MAX. OAD-2 TO REMAIN
PAD TO REMAIN
EXISTING CONCRETE
REPLACE EXISTING ACTUATOR
30/24 OA DUCT-UP w/MIN. OAD TO REMAIN
36/36 DN
36/36 DN
REMOVE SMOKE DETECTOR
REMOVE
C O
O L
IN
G
C O
IL
F
IL
T E
R
HEAVY DUTY
REMOVE SMOKE DAMPER -
REMOVE SMOKE DETECTOR
REMOVE AP ON BOTH SIDES
OA DAMPER TO REMAIN
OA LOUVER TO REMAIN
PLENUM TO REMAIN
INSULATED METAL
TO REMAIN
RAD/SMOKE DAMPER
AIR DUCT TO REMAIN
LINED MIXED
36/36 UP
36/36 UP
PAD TO REMAIN
EXISTING CONCRETE
REMOVE EXISTING HW PUMP STARTER
AP
CD
F
IL
T E
R
C O
IL
C O
O L
IN
G
36/36
AP
AP
NEW
NEW
NEW AH-G-1
M
IX
X
AH-G-1NEW
BELOW
M
IX
X
F
IL
T E
R
C O
IL
C O
O L
IN
G
A R
R A
Y
F A
N
AH-G-1NEW
36/36
SECTION @ AH-G-1 - DEMOLITIION - HVAC
CP-G-1REMOVE EXISTING
HP-G-1
H W
S
FAN ARRAY
4" CHR
4" CHS
CP-G-1
H W
R
H W
S
HWR
SD
SD
P:\26016\26016m301.dgn
DATE PLOTTED
DGN FILE
01-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26016\26016m301.dgn
AS SHOWN
09.30.2026
26016
C o ll e g e o f C o a s ta l G e o rg ia
WSH
LTF
WSH
B O
R C
C G
A -2
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
T
C o ff in G y m A ir H a n d le r
R e p la c e m e n t
36/96
36"{
96/36
ELEC.
36"{
ACCESS DOOR BELOW
INSULATED SHEETMETAL BLANK
R S
ROOF
GRADE
CH PIPIES
2"
24/120
HW
D N
HWS
HWR PIPES DOWN
K
HWS
K
42/24 OA DUCT-UP W/MAX OAD-1
RAG
SA DUCT
FLOOR
ACP-G-1
CD
C D
TO REMAIN
INSULATED SHEET METAL BLANK TO REMAIN
INSULATED METAL PLENUM TO REMAIN
REPLACE EXISTING ACTUATOR
42/24 OA DUCT-UP w/MAX. OAD-2 TO REMAIN
PAD TO REMAIN
EXISTING CONCRETE
REPLACE EXISTING ACTUATOR
30/24 OA DUCT-UP w/MIN. OAD TO REMAIN
36/36 DN
36/36 DN
OA DAMPER TO REMAIN
OA LOUVER TO REMAIN
PLENUM TO REMAIN
INSULATED METAL
TO REMAIN
RAD/SMOKE DAMPER
AIR DUCT TO REMAIN
LINED MIXED
36/36 UP
36/36 UP
PAD TO REMAIN
EXISTING CONCRETE
P:\26016\26016m401.dgn
DGN FILE
01-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26016\26016m401.dgn
AS SHOWN
09.30.2026
26016
C o ll e g e o f C o a s ta l G e o rg ia
WSH
LTF
WSH
B O
R C
C G
A -2
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
T
C o ff in G y m A ir H a n d le r
R e p la c e m e n t
M401
HVAC
FLOW DIAGRAM -
AFMS 1
OA 2
OA 1
TT 6
TT 7
TT 8
LL 1
DDC PANEL
INPUT/OUTPUT
SUMMARIES
ACP
DP 1
VLV 1
VLV 2
T
SYSTEMS
T
NOT TO SCALE
S.A. FAN
S.D.
R .A
S.A.
O.A.
S.D.
R
R.A. AVD
MIN. O.A. AVD
MAX. O.A. AVD
HWR
HWS
AHU AHU AHU
HC
OAT
OA
ZONE
COND.
C
O
O
C
C
C
R.A. TEMP.
R.A.-RH
TAG
FAR
TT 5
HT
MIN. O.A. DAMPER
S Y
S T
M
R
A P
H
IC
D
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
P
A
K E
U P
S E
T P
O
T
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
R E
L A
T
IV
U
M
ID
IT
Y
P R
E S
S U
R E
S T
A T
U S
IN
T E
R L
O C
K
H
IG
H
L
W
L
IM
IT
R
N
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
F A
IL
U
D E (S
T E S
A
N D
N O
T E S
C U
R R
E
L A
Y
D R
IV
E
S
T A
T U
S
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
E
W
IT
C H
C O
IR
F
O W
C A
L C
U L
A T
IN
T
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E N
C L
O S
S
IT
IO
N
NOTES:
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
OUTPUTS INPUTS SOFTWARE
DIGITAL ANALOG ANALOG ALARM DDC ENERGY MGMT.DIGITAL
TT
AI
FAR
SAF
VFD
VFD FAR
CCFIL
TTLL
TT
OA
RA
FAR
TT
HT
AFMS
EA
VLV
DI AIA0D0
CEA 1 ECONOMIZER RELIEF DAMPER
T R
E
G
RELIEF AVD
ECONOMIZER
EXISTING
OAT GLOBAL OUTDOOR TEMP.
DP
AI
EXTERIOR WALL
AI
GLOBAL
FLOW DIAGRAM AH-G-1
ACTUATOR
REUSE EXISTING
ON ROOF
RELIEF AIR HOOD
HP-G-1
AH-G-1
VLV
CP-G-1
HC-1
HC-2
LOUVER
OA INTAKE
AH-G-1
AH-G-1
SA-VFD 1,2 S.A. FAN-VFD
HC CONTROL VALVE
BUILDING PRESSURE
MIN. O.A. AFMS
ZONE - SPACE TEMP.
MAX. O.A. DAMPER
R.A. DAMPER
M.A. TEMP.
CC-L.A.T.
S.A.-TEMP.
L.L.-TEMP.
F.A. RELAY
RA 1
CC CONTROL VALVE
1,2
SCALE:
= 1'-0
4 0 2 4 8
AHU-G-1
VFD
ACP-G-1
CP-G-1
E301
NEW WORK - ELEC
DEMOLITION &
MECH. RM. & SECTION -
LARGE SCALE PLANS -
SCALE:
= 1'-0
4 0 2 4 8
REMOVE
LOWER LEVEL - GYM MECH. RM. 156 - DEMOLITION - ELEC
LARGE SCALE -
LOWER LEVEL - GYM MECH. RM. 156 - NEW WORK - ELEC
LARGE SCALE -
REMOVE EXISTING
REMOVE EXISTING HW PUMP
EXISTING
REMOVE
PAD TO REMAIN
EXISTING CONCRETE
M
IX
X
F
IL
T E
R
C O
IL
C O
O L
IN
G
A R
R A
Y
F A
N
HM-1
HM IN NEW WORK
REUSE FEEDER FROM
HM-5
REUSE FEEDER FROM HM IN NEW WORK
REMOVE EXISTING HW PUMP STARTER
HM-3
REUSE FEEDER FROM HM IN NEW WORK
REMOVE EXISTING PUMP STARTER
HM-3
HM-5
LM HM
NOTES:(THIS SHEET ONLY)
OF HVAC DAMPERS AND ACTUATORS.
PROVIDE ELECTRICAL SUPPORT AS REQUIRED FOR REPLACEMENT
CONSTRUCTION.
REMOVE EXISTING DUCT SMOKE DETECTORS (2). PROTECT DURING
INDICATED ON HVAC PLANS/FLOW DIAGRAM.
REINSTALL EXISTING DUCT SMOKE DETECTORS IN LOCATIONS
PROVIDE NEW FEEDER FROM STARTER TO PUMP, 4#10,ƒ"C.
BOX ON THE AHU,ƒ"C, 4#6.
PROVIDE NEW FEEDER FROM VFD TO AHU FAN ARRAY POWER
OR APPROVED EQUAL.
ELITE 4 OEC LED 3000L/4000L/5000L DIM10 MVOLT 35K/40K/50K 85K
LSI SDL4 LED 40L FL UNV DIM1 35 80CRI
LITHONIA ZLIN L48 SMR 5000LM FST MVOLT 35K 80CRI WH
METALUX 4SNLED-LD5-50SL-LW-UNV-L835-CD1
WITH 4 NEW LED STRIP FIXTURES. MFRS AND MODELS:
REMOVE 4 EXISTING FLUORESCENT STRIP FIXTURES AND REPLACE
MFRS: DUAL-LITE, SURE-LITE, LITHONIA, COOPER/EATON, OR APPROVED EQUAL.
CHARGING LED. TEST BUTTON. NICKEL CADMIUM BATTERY.
WITH NEW. 90 MIN BACKUP. WHITE FINISH. DAMP RATED. WIREGUARD.
REMOVE EXISTING EMERGENCY LIGHTING WALL PACK AND REPLACE
P:\26016\26016e301.dgn
DATE PLOTTED
DGN FILE
01-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26016\26016e301.dgn
AS SHOWN
09.30.2026
26016
C o ll e g e o f C o a s ta l G e o rg ia
SHD
BCO
SHD
B O
R C
C G
A -2
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
T
C o ff in G y m A ir H a n d le r
R e p la c e m e n t
LM HM
NEW
NEW
NEW AH-G-1
HP-G-1
CP-G-1
| 26016aCov |
| 26016m001 |
| 26016m002 |
| 26016m301 |
| 26016m401 |
| 26016e301 |