The document is a Centrifugally Cast Concrete Pipe (CCCP) Specification for the City of Sandy Springs Mountain Creek Culvert Project, prepared by Pond & Company in March 2025. The specification outlines detailed requirements for installing a concrete pipe liner within existing storm sewer pipe structures, with the goal of creating a continuous structural concrete pipe inside the current infrastructure. The project involves installing CCCP liners that will provide an equal or greater opening area compared to the proposed plans, with measurement and payment calculated by linear foot of installed liner.

The specification includes comprehensive technical requirements for materials, including specific performance standards for compressive strength, flexural strength, tensile strength, bond strength, and abrasion resistance. The CCCP liner geopolymer mortar must be composed of at least 70% Pozzolanic material and verified through third-party X-ray Fluorescence testing. The contract includes provisions for installation conditions, such as temperature restrictions (between 45°F and 100°F), surface preparation, drainage maintenance, and use of a curing compound. Payment terms stipulate that no compensation will be provided for liners that cannot be successfully installed due to existing structure conditions, and the contractor is responsible for all preparatory and remediation work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF SANDY SPRINGS MOUNTAIN CREEK CULVERT PROJECT

POND & COMPANY CENTRIFUGALLY CAST CONCRETE PIPE SPECIFICATION

MARCH 2025 1

CENTRIFUGALLY CAST CONCRETE PIPE SPECIFICATION

PART 1� GENERAL

1.1 SUMMARY

A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents, and shall include furnishing and installation of the following centrifugally cast concrete pipe (CCCP) liner on existing storm sewer pipe structures. The

CCCP liner shall extend over the specified length forming a continuous structural concrete pipe within a pipe. The installed CCCP liner shall provide an opening area equal or greater than the proposed opening area shown on the plans.

1.2 MEASUREMENT AND PAYMENT

A. Under this item, the Contractor shall install centrifugally cast concrete pipe in accordance with the plans, specifications, and directions of the Owner�s Representative.

Work shall include selection, transporting, cleaning, siting, setting, and adjusting site furnishings. CCCP liner will be measured by the linear foot, complete in place.

B. The accepted quantities of CCCP liner will be paid for at the contract unit price per linear foot for existing structure in which the liner is installed. The installed liner shall provide an opening area equal to or greater than the proposed opening area shown on the plans.

Price shall include all accessories, including fixtures, fastenings, and machinery required for installation.

C. The cost of repairing jagged edges or deformities to the existing structure, filling cavities around the existing structure with pea gravel, flowable backfill, grout, or invert repair mortar, rights of entry, maintenance and removal of temporary fence, removing debris and foreign material from the existing structure, cleaning the existing structure, preparation of a work plan, providing design calculations, presence of the manufacturer�s representative, testing, corrective actions and all other incidentals shall be included in the cost of the CCCP liner.

D. There will be no payment for the installation or removal of any liner that cannot be successfully installed due to the condition of the existing structure.

E. If the existing structure or other objects not designated for removal are damaged while performing the work, it shall be considered unauthorized work and repaired or replaced.

MARCH 2025 2

1.3 SUBMITTALS

A. All submittals shall conform to the requirements in this and other sections of the

Contract Documents. The following minimum shall be required:

B. Reference Submittals

1. Lining System�s �Applicator Certification� along with minimum three years� experience of qualified Technical Representative on site for the duration of the project.

2. Third-party references of qualified installation experience in pipeline structures.

C. Product and Materials

1. Provide manufacturer�s data for all furnishings listed in this section including;

a. Repair mortar material including technical data sheet.

b. Lining material including technical data sheet and third-party testing completed.

2. Provide supporting documentation from the manufacturer to validate all claims of recycled content and regional materials.

D. Maintenance Data Samples: Provide manufacturer's recommended maintenance instructions with address and phone number of source of supply.

E. Warranty: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

1.4 QUALITY ASSURANCE, CONTROL AND ACCEPTANCE

A. Installer Qualifications: Firm with at least three years of successful installation experience on projects with furnishing work similar to that required for this project.

B. Manufacturer's Qualifications: Firms regularly engaged in the manufacture of furnishing types and sizes required, whose products have been in satisfactory use in similar service for not less than five years.

C. The Contractor shall have a manufacturer�s representative at the site during the mixing and application of the pipe lining material.

D. The Contractor shall measure the new span and rise per every 5 ft of structure length and shall provide these measurements along with the pre-installation measurements to the Engineer. Acceptance will be based on verification that the thickness of the installed

CCCP liner is in accordance with the plans by comparison of the pre-installation and post-installation span and rise measurements along with a visual inspection to verify a leak-free, uniform appearance. A plan of corrective action shall be submitted for approval upon notification from the Engineer of any unacceptable areas of the CCCP liner.

MARCH 2025 3

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver, handle, and store equipment to project site in accordance with manufacturer's recommendations.

1. Deliver materials to site in manufacturer�s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer.

2. Storage: Store materials in clean, dry area elevated above grade in accordance with manufacturer�s instructions. Keep materials in manufacturer�s original, unopened containers, and packaging until installation.

3. Handling: Protect materials and finish during handling and installation to prevent damage.

1.6 WARRANTY

A. Unless otherwise noted, products will be free from defects in material and/or workmanship for a period of three years from the date of invoice.

B. The warranty does not apply to damage resulting from accident, alteration, misuse, tampering, negligence, or abuse.

C. Warrantor shall, at its option, repair, replace, or refund the purchase price of any items found defective upon inspection by an authorized service representative.

D. Scratches, nicks, and dents are to be considered normal wear and tear and are not the responsibility of the manufacturer.

PART 2� PRODUCTS AND MATERIALS

2.1 MATERIALS

A. Materials shall be in accordance with the following:

Properties Test Method Duration Requirements

Compressive Strength ASTM C 39 or C 109 1 Day

28 Day

2,500 psi

8,000 psi

Flexural Strength ASTM C 78 7 Day

28 Day

1,100 psi

1,500 psi

Tensile Strength ASTM C 496 28 Day 800 psi

Shrinkage RH ASTM C 1090 28 Day 0% at 65%

Modulus of Elasticity ASTM C 469 1 Day

28 Day

3,000,000 psi

5,800,000 psi

MARCH 2025 4

Bond Strength ASTM C 882 Type II 1 Day

28 Day

900 psi

2,500 psi

Freeze Thaw Durability ASTM C 666 300 Cycles Zero Loss

Set Time ASTM C 807 Initial Final Less Than 75 min.

Less Than 120 min.

Abrasion Resistance ASTM C 1138 5 Cyl.28 Day Less Than 3% Loss

B. The CCCP liner geopolymer mortar shall be composed of at least 70% Pozzolanic material consisting of SiO2, MgO, Al2O3, or Fe2O3 and shall be verified by third party certified X-ray Fluorescence, XRF, testing.

C. The maximum aggregate particle size shall consist of 100% of material, excluding fibers, passing the No.8 (2.36 mm) sieve.

D. Additional materials including chemical grouts and hydraulic cements necessary to stop infiltration and create a surface for the geopolymer lining to be applied to may be necessary and shall be in accordance with GDOT standards.

E. All materials used shall be compatible with the geopolymer lining and are subject to approval.

F. A type C certification in accordance with 916 shall be provided for geopolymer mortars.

The applicable specifications shall be referred to in the certifications.

PART 3- EXECUTION

3.1 LAYING OUT THE WORK

A. Mark the location of all centrifugally cast concrete pipe elements, including adjacent hard surfaces, walls, fences, and structures.

B. Mark the layout before starting any work.

1. If conflicts or obstructions exist, notify the Owner�s Representative.

2. Do not proceed until revised drawings have been provided, showing corrected layout, and obstructions have been removed.

3.2 EXAMINATION

A. Before beginning installation, verify that the site is ready for installation in accordance with manufacturer�s installation instructions, and that surface elevations have been confirmed and that finished grade will be achieved when surfacing is in place.

MARCH 2025 5

B. Verify items provided by other sections of work are properly sized and located, and that built-in items are in proper location. A temporary fence shall be installed as required to prevent encroachment of the public or livestock into the work area. Upon completion of the work, disturbed areas on private property shall be restored.

C. If conditions are the responsibility of another installer, notify Owner�s Representative of unsatisfactory preparation before proceeding.

D. Any installation damage to location facilities will be repaired at Contractor's expense.

3.3 PRE-INSTALLATION

A. Before beginning the installation operation, three copies of a work plan that includes design calculations shall be submitted to the Engineer. The design calculations shall be signed and sealed by a professional engineer and shall certify the proposed CCCP liner thickness. The work plan shall also include:

1. The location and characteristics of cavities around the existing structure.

2. The anticipated coverage area and volume of invert repair mortar needed per existing structure.

3. If used, the identification, location and quantity of additional materials, such as pea gravel or flowable backfill that will be used for filling cavities.

4. The location of any deformities such as jagged edges that might impact the liner installation or its function, and plan to correct the conditions.

5. A log of the existing span and rise for every 5 ft of existing structure length. The thickness of the installed liner shall be verified by a comparison of the post construction span and rise dimensions.

3.4 OBSTRUCTION REMOVAL

A. The Contractor shall clear the existing structure of all obstructions such as but not limited to solids, dropped joints, roots, protruding laterals, or collapsed pipes that will prevent

CCCP liner installation. All other foreign materials shall be removed from the existing structure and disposed of in accordance with GDOT Standards. Headwalls and taps shall be cut back to be flush with the existing structure. If inspection reveals an obstruction that cannot be removed by conventional sewer cleaning equipment, the Contractor may make a point repair excavation to remove or repair the obstruction.

B. Areas of water seepage shall be sealed off by an approved method. Pools of water shall be removed; however, a dry surface is not required.

C. Prior to lining, all drop inlets or taps shall be temporarily plugged to prevent water

MARCH 2025 6

discharge onto newly placed mortar and to prevent mortar from entering the inlet or tap. Lines with active flow shall be temporarily plugged with a device that sufficiently prevents water from discharging onto the newly placed CCCP liner.

D. The interior surface of the existing structure shall be cleaned with a high-pressure water-blast sufficient to remove all laitance and loose material and flush debris from the structure. Upon final inspection the existing structure shall be free of sand, dirt and all other laitance that may impede the placement or adhesion of the CCCP liner to the structure.

3.5 INSTALLATION

A. The Contractor shall carry out operations in strict accordance with all applicable OSHA standards. Particular attention is drawn to those safety requirements involving entering confined spaces.

B. Drainage shall be maintained during the installation and during operations in a manner that does not damage adjacent property. The Contractor shall provide for the diversion of flow around the existing structure where the CCCP liner is being installed. Pump and bypass lines shall be of adequate capacity to handle the flow.

C. Maintenance of traffic shall be in accordance with the Plans and GDOT standards.

D. The existing structure surface shall be saturated surface-dry before application begins.

The CCCP liner shall be installed by using a high speed, rotating applicator device as recommended by the manufacturer of the mortar. Mortar mixers, compressors and pumps shall also be of a type recommended by the mortar manufacturer. The mortar shall be mixed and agitated according to the mortar manufacturer�s instructions. If recommended by the mortar manufacturer, working time may be extended by mixing the material with cool water or ice-cooled water.

E. The mortar shall not be applied when ambient or existing structure surface temperatures are 100°F or above or when ambient temperatures are expected to fall below 45°F within 72 hours of placement. Both ambient and existing structure surface temperatures shall be at least 45°F at the time of placement. The CCCP liner shall be protected from freezing.

F. A curing compound in accordance with ASTM C 309 shall be used. It shall be applied at the time and rate recommended by the mortar manufacturer.

END OF SECTION

015000 FL - Temporary Facilities and Controls
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.
B. Related Requirements:
1.2 USE CHARGES
A. Installation, removal, and use charges for temporary facilities to be included in the Contract Sum unless otherwise indicated. Allow other entities engaged in the Project to use temporary services and facilities without cost, including, but not limited to, Owner's construction forcestesting agencies, and authorities having jurisdiction.
B. Sewer Service: Paysewer-service use charges for sewer usage by all entities for construction operations.
C. Water Service: Paywater-service use charges for water used by all entities for construction operations.
D. Electric Power Service: Payelectric-power-service use charges for electricity used by all entities for construction operations.
E. Water and Sewer Service from Existing System: Water from Owner's existing water system is available for use with meteringProvide connections and extensions of services [and metering] as required for construction operations.
F. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use with meteringProvide connections and extensions of services and metering as required for construction operations.
1.3 INFORMATIONAL SUBMITTALS
1.4 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.
B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.
C. Accessible Temporary Egress: Comply with applicable provisions in the DOJ's "2010 ADA Standards for Accessible Design"
1.5 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Chain-Link Fencing: Minimum 2-inch (50-mm), 0.148-inch- (3.8-mm-) thick, galvanized-steel, chain-link fabric fencing; minimum 6 feet (1.8 m) high with galvanized-steel pipe posts; minimum 2-3/8-inch- (60-mm-) OD line posts and 2-7/8-inch- (73-mm-) OD corner and pull posts, with 1-5/8-inch- (42-mm-) OD top rails
B. Portable Chain-Link Fencing: Minimum 2-inch (50-mm), 0.148-inch- (3.8-mm-) thick, galvanized-steel, chain-link fabric fencing; minimum 6 feet (1.8 m) high with galvanized-steel pipe posts; minimum 2-3/8-inch- (60-mm-) OD line posts and 2-7/8-inch- (73-mm-) OD corner and pull posts, with 1-5/8-inch- (42-mm-) OD top and bottom rails. Provide concrete bases for supporting posts.
2.2 TEMPORARY FACILITIES
2.3 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.
PART 3 - EXECUTION
3.1 TEMPORARY FACILITIES, GENERAL
A. Conservation: Coordinate construction and use of temporary facilities with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.
3.2 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.
3.3 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.
B. Water Service:
C. Sanitary Facilities: Provide temporary toilets, wash facilities, safety shower and eyewash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.
D. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.
3.4 SUPPORT FACILITIES INSTALLATION
3.5 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Protection of Existing Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities.
B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
C. Temporary Erosion and Sedimentation Control:
D. Stormwater Control: Comply with requirements of authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains.
E. Tree and Plant Protection:
F. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.
G. Temporary Egress: Provide temporary egress from existing occupied facilities as indicated and as required by authorities having jurisdiction. Provide signage directing occupants to temporary egress.
H. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA 241; manage fire-prevention program.
3.6 MOISTURE AND MOLD CONTROL
3.7 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal.
C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.
D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.
015639 FL - Temporary Tree and Plant Protection
PART 1 - GENERAL
1.1 SUMMARY
A. The Work of this Section Includes: General protection and pruning of existing trees and plants that are affected by execution of the Work, whether temporary or permanent construction.
B. Related Requirements:
1.2 DEFINITIONS
A. Caliper: Diameter of a trunk measured by a diameter tape at a height 6 inches (150 mm) above the ground for trees up to and including 4-inch (100-mm) size at this height and as measured at a height of 12 inches (300 mm) above the ground for trees larger than 4-inch (100-mm) size.
B. Caliper (DBH): Diameter breast height; diameter of a trunk as measured by a diameter tape at a height 54 inches (1372 mm) above the ground line for trees with caliper of 8 inches (200 mm) or greater as measured at a height of 12 inches (300 mm) above the ground.
C. Plant-Protection Zone: Area surrounding individual trees, groups of trees, shrubs, or other vegetation to be protected during construction and indicated on Drawings.
D. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and indicated on Drawings
E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
1.3 PREINSTALLATION MEETINGS
1.4 ACTION SUBMITTALS
A. Product Data:
B. Shop Drawings:
C. Samples: For each type of the following:
D. Maintenance Recommendations: From arborist, for care and protection of trees affected by construction during and after completing the Work.
E. Mitigation Requirements: As required by jurisdiction or as developed by arborist, for mitigation of damage to trees and other plantings. Include the following:
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Statements: For arborist and tree service firm.
B. Certification: From arborist, certifying that trees indicated to remain have been protected during construction in accordance with recognized standards and that trees were promptly and properly treated and repaired when damaged.
C. Maintenance Recommendations: From arborist, for care and protection of trees affected by construction during and after completing the Work.
D. Existing Conditions: Documentation of existing trees and plantings indicated to remain, which establishes preconstruction conditions that might be misconstrued as damage caused by construction activities.
E. Quality-control program.
1.6 QUALITY ASSURANCE
1.7 FIELD CONDITIONS
A. The following practices are prohibited within protection zones:
B. Do not direct vehicle or equipment exhaust toward protection zones.
C. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones and organic mulch.
D. Take precautions to protect plants from airborne contaminants, such as paint or fireproofing overspray.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Backfill Soil: Stockpiled soil mixed with planting soil of suitable moisture content and granular texture for placing around tree; free of stones, roots, plants, sod, clods, clay lumps, pockets of coarse sand, concrete slurry, concrete layers or chunks, cement, plaster, building debris, and other extraneous materials harmful to plant growth.
B. Protection-Zone Fencing: Fencing fixed in position and meeting one of the following requirements: Previously used materials may be used when approved by Owner
PART 3 - EXECUTION
3.1 EXAMINATION
A. Erosion and Sedimentation Control: Examine the site to verify that temporary erosion- and sedimentation-control measures are in place. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.
B. Prepare written report, endorsed by arborist, listing conditions detrimental to tree and plant protection.
3.2 PREPARATION
A. Locate and clearly identify trees, shrubs, and other vegetation to remain. Flag each tree trunk at 54 inches (1372 mm) above the ground.
B. Protect tree root systems from damage caused by runoff or spillage of noxious materials while mixing, placing, or storing construction materials. Protect root systems from ponding, eroding, or excessive wetting caused by dewatering operations.
3.3 TREE PROTECTION
A. Tree-Protection Zones: Mulch areas inside tree-protection zones and other areas indicated. Do not exceed indicated thickness of mulch.
3.4 PROTECTION ZONES
A.
3.5 EXCAVATION
A. General: Excavate at edge of protection zones and for trenches indicated within protection zones in accordance with requirements in Section 312000 "Earth Moving" unless otherwise indicated.
B. Trenching within Protection Zones: Where utility trenches are required within protection zones, excavate under or around tree roots by hand or with air spade, or tunnel under the roots by drilling, auger boring, or pipe jacking. Do not cut main lateral tree roots or taproots; cut only smaller roots that interfere with installation of utilities. Cut roots as required for root pruning. If excavating by hand, use narrow-tine spading forks to comb soil and expose roots.
3.6 ROOT PRUNING
A. Prune tree roots that are affected by temporary and permanent construction. Prune roots as follows:
B. Root Pruning at Edge of Protection Zone: Prune tree roots 12 inches (300 mm) outside of the protection zone by cleanly cutting all roots to the depth of the required excavation.
3.7 CROWN PRUNING
3.8 REGRADING
A. Lowering Grade: Where new finish grade is indicated below existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.
B. Lowering Grade within Protection Zone: Where new finish grade is indicated below existing grade around trees, slope grade away from trees as recommended by arborist unless otherwise indicated.
C. Raising Grade: Where new finish grade is indicated above existing grade around trees, slope grade beyond the protection zone. Maintain existing grades within the protection zone.
D. Minor Fill within Protection Zone: Where existing grade is 2 inches (50 mm) or less below elevation of finish grade, fill with backfill soil. Place backfill soil in a single uncompacted layer and hand grade to required finish elevations.
3.9 FIELD QUALITY CONTROL
A. Inspections: Engage a qualified arborist to direct plant-protection measures in the vicinity of trees, shrubs, and other vegetation indicated to remain and to prepare inspection reports.
3.10 REPAIR AND REPLACEMENT
A. General: Repair or replace trees, shrubs, and other vegetation indicated to remain or to be relocated that are damaged by construction operations, in a manner approved by Architect.
B. Trees: Remove and replace trees indicated to remain that are more than 25 percent dead or in an unhealthy condition before the end of the corrections period or are damaged during construction operations that Architect determines are incapable of restoring to normal growth pattern.
015723 FL - Temporary Storm Water Pollution Control
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
1.2 SUMMARY
A. Section Includes:
1.3 EROSION AND SEDIMENT CONTROL PLAN
A. The Erosion and Sediment Control Plan (ESCP) is part of the Contract Documents and is bound into this Project Manual.
1.4 PREINSTALLATION MEETINGS
1.5 INFORMATIONAL SUBMITTALS
1.6 QUALITY ASSURANCE
A. Erosion and Sediment Control Plan (ESCP) Coordinator: Experienced individual or firm with a record of successful water pollution control management coordination of projects with similar requirements.
B. Installers: Trained as indicated in the ESCP.
PART 2 - PRODUCTS
2.1 TEMPORARY STORMWATER POLLUTION CONTROLS
A. Provide temporary stormwater pollution controls as required by the ESCP.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with all best management practices, general requirements, performance requirements, reporting requirements, and all other requirements included in the ESCP.
B. Locate stormwater pollution controls in accordance with the ESCP.
C. Conduct construction as required to comply with the ESCP and that minimize possible contamination or pollution or other undesirable effects.
D. Remove ESCP controls at completion of construction and restore and stabilize areas disturbed during construction.
017419 FL - Construction Waste Management and Disposal
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
1.2 SUMMARY
A. Section includes administrative and procedural requirements for the following:
B. Related Requirements:
1.3 DEFINITIONS
A. Construction Waste: Building, structure, and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.
B. Demolition Waste: Building, structure, and site improvement materials resulting from demolition operations.
C. Disposal: Removal of demolition or construction waste and subsequent salvage, sale, recycling, or deposit in landfill, incinerator acceptable to authorities having jurisdiction, or designated spoil areas on Owner’s property.
D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.
E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.
F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition and construction waste become property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.
1.5 ACTION SUBMITTALS
1.6 INFORMATIONAL SUBMITTALS
1.7 QUALITY ASSURANCE
A. Waste Management Coordinator Qualifications: Experienced firm, or individual employed and assigned by General Contractor, with a record of successful waste management coordination of projects with similar requirements. Superintendent may serve as Waste Management Coordinator.
B. Regulatory Requirements: Comply with transportation and disposal regulations of authorities having jurisdiction.
PART 2 - PRODUCTS
PART 3 - EXECUTION
3.1 PLAN IMPLEMENTATION
A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
B. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
3.2 SALVAGING DEMOLITION WASTE
A. Salvaged Items for Reuse in the Work: Salvage items for reuse and handle as follows:
B. Salvaged Items for Sale and Donation: Not permitted on Project site.
C. Salvaged Items for Owner's Use: Salvage items for Owner's use and handle as follows:
3.3 DISPOSAL OF WASTE
A. General: Except for items or materials to be salvaged or recycled, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
B. General: Except for items or materials to be salvaged or recycled, remove waste materials and legally dispose of at designated spoil areas on Owner’s property.
C. Burning: Do not burn waste materials.
311000 FL - Site Clearing
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
B. Related Requirements:
C. Related Requirements:
1.3 DEFINITIONS
A. Subsoil: Soil beneath the level of subgrade; soil beneath the topsoil layers of a naturally occurring soil profile, typified by less than 1 percent organic matter and few soil organisms.
B. Surface Soil: Soil that is present at the top layer of the existing soil profile. In undisturbed areas, surface soil is typically called "topsoil," but in disturbed areas such as urban environments, the surface soil can be subsoil.
C. Topsoil: Top layer of the soil profile consisting of existing native surface topsoil or existing in-place surface soil; the zone where plant roots grow.
D. Tree-Protection Zone: Area surrounding individual trees or groups of trees to be protected during construction and indicated on Drawings
E. Vegetation: Trees, shrubs, groundcovers, grass, and other plants.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site
1.5 MATERIAL OWNERSHIP
A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.
1.6 INFORMATIONAL SUBMITTALS
A. Existing Conditions: Documentation of existing trees and plantings, adjoining construction, and site improvements that establishes preconstruction conditions that might be misconstrued as damage caused by site clearing.
B. Topsoil stripping and stockpiling program.
C. Rock stockpiling program.
D. Record Drawings: Identifying and accurately showing locations of capped utilities and other subsurface structural, electrical, and mechanical conditions.
E. Burning: Documentation of compliance with burning requirements and permitting of authorities having jurisdiction. Identify location(s) and conditions under which burning will be performed.
1.7 QUALITY ASSURANCE
A. Topsoil Stripping and Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work. Include dimensioned diagrams for placement and protection of stockpiles.
B. Rock Stockpiling Program: Prepare a written program to systematically demonstrate the ability of personnel to properly follow procedures and handle materials and equipment during the Work. Include dimensioned diagrams for placement and protection of stockpiles.
1.8 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.
B. Improvements on Adjoining Property: Authority for performing site clearing indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.
C. Salvageable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises.
D. Utility Locator Service: Notify Call Before You Dig for area where Project is located before site clearing.
E. Do not commence site clearing operations until temporary erosion- and sedimentation-control and plant-protection measures are in place.
F. Tree- and Plant-Protection Zones: Protect according to requirements in Section 015639 "Temporary Tree and Plant Protection."
G. Soil Stripping, Handling, and Stockpiling: Perform only when the soil is dry or slightly moist.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Satisfactory Soil Material: Requirements for satisfactory soil material are specified in Section 312000 "Earth Moving."
B. Antirust Coating: Fast-curing, lead- and chromate-free, self-curing, universal modified-alkyd primer complying with MPI #23 (surface-tolerant, anticorrosive metal primer)or SSPC-Paint 20 or SSPC-Paint 29 zinc-rich coating
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect and maintain benchmarks and survey control points from disturbance during construction.
B. Verify that trees, shrubs, and other vegetation to remain or to be relocated have been flagged and that protection zones have been identified and enclosed according to requirements in Section 015639 "Temporary Tree and Plant Protection."
C. Protect existing site improvements to remain from damage during construction.
3.2 TEMPORARY EROSION AND SEDIMENTATION CONTROL
A. Provide temporary erosion- and sedimentation-control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, according to erosion- and sedimentation-control Drawings and requirements of authorities having jurisdiction.
B. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross protection zones.
C. Inspect, maintain, and repair erosion- and sedimentation-control measures during construction until permanent vegetation has been established.
D. Remove erosion and sedimentation controls, and restore and stabilize areas disturbed during removal.
3.3 TREE AND PLANT PROTECTION
A. Protect trees and plants remaining on-site according to requirements in Section 015639 "Temporary Tree and Plant Protection."
B. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations according to requirements in Section 015639 "Temporary Tree and Plant Protection."
3.4 EXISTING UTILITIES
A. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.
B. Locate, identify, and disconnect utilities indicated to be abandoned in place.
C. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others, unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
D. Excavate for and remove underground utilities indicated to be removed.
3.5 CLEARING AND GRUBBING
A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.
B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.
3.6 TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.
B. Strip topsoil to depth of 6 inches (150 mm) in a manner to prevent intermingling with underlying subsoil or other waste materials.
C. Stockpile topsoil away from edge of excavations without intermixing with subsoil or other materials. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.
3.7 STOCKPILING ROCK
A. Remove from construction area naturally formed rocks that measure more than 1 foot (300 mm) > across in least dimension. Do not include excavated or crushed rock.
B. Stockpile rock away from edge of excavations without intermixing with other materials. Cover to prevent windblown debris from accumulating among rocks.
3.8 SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.
B. Remove slabs, paving, curbs, gutters, and aggregate base as indicated.
3.9 DISPOSAL OF SURPLUS AND WASTE MATERIALS
A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Owner's property.
B. Burning tree, shrub, and other vegetation waste is permitted according to burning requirements and permitting of authorities having jurisdiction. Control such burning to produce the least smoke or air pollutants and minimum annoyance to surrounding properties. Burning of other waste and debris is prohibited.
C. Separate recyclable materials produced during site clearing from other nonrecyclable materials. Store or stockpile without intermixing with other materials, and transport them to recycling facilities. Do not interfere with other Project work.
312000 FL - Earth Moving
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
B. Related Requirements:
1.2 UNIT PRICES
1.3 DEFINITIONS
A. Backfill: Soil material or controlled low-strength material used to fill an excavation.
B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
C. Bedding Course: Aggregate layer placed over the excavated subgrade in a trench before laying pipe.
D. Borrow Soil: Satisfactory soil imported from off-site for use as fill or backfill.
E. Drainage Course: Aggregate layer supporting the slab-on-grade that also minimizes upward capillary flow of pore water.
F. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.
G. Fill: Soil materials used to raise existing grades.
H. Rock:
I. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other fabricated stationary features constructed above or below the ground surface.
J. Subbase Course: Aggregate layer placed between the subgrade and base course for hot-mix asphalt pavement, or aggregate layer placed between the subgrade and a cement concrete pavement or a cement concrete or hot-mix asphalt walk.
K. Subgrade: Uppermost surface of an excavation or the top surface of a fill or backfill immediately below subbase, drainage fill, drainage course, or topsoil materials.
L. Utilities: On-site underground pipes, conduits, ducts, and cables as well as underground services within buildings.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct preexcavation conference at Project site.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of the following manufactured products required:
B. Samples for Verification: For the following products, in sizes indicated below:
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For qualified testing agency.
B. Material Test Reports: For each on-site and borrow soil material proposed for fill and backfill as follows:
C. Seismic survey report from seismic survey agency.
D. Preexcavation Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by earth-moving operations. Submit before earth moving begins.
1.7 QUALITY ASSURANCE
A. Geotechnical Testing Agency Qualifications: Qualified according to ASTM E329 and ASTM D3740 for testing indicated.
1.8 FIELD CONDITIONS
A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during earth-moving operations.
B. Improvements on Adjoining Property: Authority for performing earth moving indicated on property adjoining Owner's property will be obtained by Owner before award of Contract.
C. Utility Locator Service: Notify "Call Before You Dig" for area where Project is located before beginning earth-moving operations.
D. Do not commence earth-moving operations until temporary site fencing and erosion- and sedimentation-control measures specified in Section 311000 "Site Clearing" are in place.
E. The following practices are prohibited within protection zones:
F. Do not direct vehicle or equipment exhaust towards protection zones.
G. Prohibit heat sources, flames, ignition sources, and smoking within or near protection zones.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.
B. Satisfactory Soils: Soil Classification Groups GW, GP, GM, SW, SP, and SM according to ASTM D2487, or a combination of these groups; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.
C. Unsatisfactory Soils: Soil Classification Groups GC, SC, CL, ML, OL, CH, MH, OH, and PT according to ASTM D2487, or a combination of these groups.
D. Subbase Material: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.
E. Base Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; with at least 95 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.
F. Engineered Fill: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; with at least 90 percent passing a 1-1/2-inch (37.5-mm) sieve and not more than 12 percent passing a No. 200 (0.075-mm) sieve.
G. Bedding Course: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D2940/D2940M; except with 100 percent passing a 1-inch (25-mm) sieve and not more than 8 percent passing a No. 200 (0.075-mm) sieve.
H. Drainage Course: Narrowly graded mixture of washed crushed stone, or crushed or uncrushed gravel; ASTM D448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2-inch (37.5-mm) sieve and zero to 5 percent passing a No. 8 (2.36-mm) sieve.
I. Filter Material: Narrowly graded mixture of natural or crushed gravel, or crushed stone and natural sand; ASTM D448; coarse-aggregate grading Size 67; with 100 percent passing a 1-inch (25-mm) sieve and zero to 5 percent passing a No. 4 (4.75-mm) sieve.
J. Sand: ASTM C33/C33M; fine aggregate.
K. Impervious Fill: Clayey gravel and sand mixture capable of compacting to a dense state.
2.2 GEOTEXTILES
A. Subsurface Drainage Geotextile: Nonwoven needle-punched geotextile, manufactured for subsurface drainage applications, made from polyolefins or polyesters; with elongation greater than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:
B. Separation Geotextile: Woven geotextile fabric, manufactured for separation applications, made from polyolefins or polyesters; with elongation less than 50 percent; complying with AASHTO M 288 and the following, measured per test methods referenced:
2.3 CONTROLLED LOW-STRENGTH MATERIAL
A. Controlled Low-Strength Material: Self-compacting flowable concrete material produced from the following:
2.4 ACCESSORIES
A. Detectable Warning Tape: Acid- and alkali-resistant, polyethylene film warning tape manufactured for marking and identifying underground utilities, a minimum of 6 inches (150 mm) wide and 4 mils (0.1 mm) thick, continuously inscribed with a description of the utility, with metallic core encased in a protective jacket for corrosion protection, detectable by metal detector when tape is buried up to 30 inches (750 mm) deep; colored as follows:
PART 3 - EXECUTION
3.1 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth-moving operations.
B. Protect and maintain erosion and sedimentation controls during earth-moving operations.
C. Protect subgrades and foundation soils from freezing temperatures and frost. Remove temporary protection before placing subsequent materials.
3.2 DEWATERING
A. Provide dewatering system of sufficient scope, size, and capacity to control hydrostatic pressures and to lower, control, remove, and dispose of ground water and permit excavation and construction to proceed on dry, stable subgrades.
B. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.
C. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.
D. Dispose of water removed by dewatering in a manner that avoids endangering public health, property, and portions of work under construction or completed. Dispose of water and sediment in a manner that avoids inconvenience to others.
3.3 EXPLOSIVES
A. Explosives:
3.4 EXCAVATION, GENERAL
A. Unclassified Excavation: Excavate to subgrade elevations regardless of the character of surface and subsurface conditions encountered. Unclassified excavated materials may include rock, soil materials, and obstructions. No changes in the Contract Sum or the Contract Time will be authorized for rock excavation or removal of obstructions.
3.5 EXCAVATION FOR STRUCTURES
A. Excavate to indicated elevations and dimensions within a tolerance of plus or minus 1 inch (25 mm). If applicable, extend excavations a sufficient distance from structures for placing and removing concrete formwork, for installing services and other construction, and for inspections.
B. Excavations at Edges of Tree- and Plant-Protection Zones:
3.6 EXCAVATION FOR WALKS AND PAVEMENTS
A. Excavate surfaces under walks and pavements to indicated lines, cross sections, elevations, and subgrades.
3.7 EXCAVATION FOR UTILITY TRENCHES
A. Excavate trenches to indicated gradients, lines, depths, and elevations.
B. Excavate trenches to uniform widths to provide the following clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit unless otherwise indicated.
C. Trench Bottoms:
D. Trenches in Tree- and Plant-Protection Zones:
3.8 UNAUTHORIZED EXCAVATION
A. Fill unauthorized excavation under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill, with 28-day compressive strength of 2500 psi (17.2 MPa), may be used when approved by Architect.
3.9 STORAGE OF SOIL MATERIALS
A. Stockpile borrow soil materials and excavated satisfactory soil materials without intermixing. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust.
3.10 BACKFILL
A. Place and compact backfill in excavations promptly, but not before completing the following:
B. Place backfill on subgrades free of mud, frost, snow, or ice.
3.11 UTILITY TRENCH BACKFILL
A. Place backfill on subgrades free of mud, frost, snow, or ice.
B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and bodies of conduits.
C. Trenches under Footings: Backfill trenches excavated under footings and within 18 inches (450 mm) of bottom of footings with satisfactory soil; fill with concrete to elevation of bottom of footings. Concrete is specified in Section 321313 "Concrete Paving."
D. Trenches under Roadways: Provide 4-inch- (100-mm-) thick, concrete-base slab support for piping or conduit less than 30 inches (750 mm) below surface of roadways. After installing and testing, completely encase piping or conduit in a minimum of 4 inches (100 mm) of concrete before backfilling or placing roadway subbase course. Concrete is specified in Section 321313 "Concrete Paving."
E. Backfill voids with satisfactory soil while removing shoring and bracing.
F. Initial Backfill:
G. Final Backfill: