Summary

This is a Request for Bids (RFB) issued by Dutchess Community College in Poughkeepsie, New York for the CBI Air Handling Unit Replacement project (RFB-DCC-08-2027). The project involves furnishing all labor, materials, equipment, and services necessary to replace air handling units serving the Center for Business and Industry (CBI) building, along with associated work as specified in contract documents and drawings. The work is divided into two separate contracts: an HVAC contract and an Electrical contract. Sealed bids are due by 2:00 pm on November 13, 2026, with a public opening and reading of bids to follow. A pre-bid meeting is scheduled for October 26, 2026 at 10:00 am at Dutchess Community College, Bowne Hall, Room 203. The project is subject to a substantial completion date of October 15, 2027, with final completion required within thirty days thereafter. The College reserves the right to award contracts in part or in whole to the lowest responsive and responsible bidder or bidders. All written communications and clarifications must be directed to Lisa Keto, Associate for Capital Finance and Administration, by end of business on November 3, 2026.

The HVAC contract includes a base bid with a $35,000 allowance for unforeseen conditions, while the Electrical contract includes a base bid with a $15,000 allowance. The Contractor is required to self-perform a minimum of 51% of the total contract value using its own forces, with the Owner reserving the right to review and approve the proposed breakdown of self-performed versus subcontracted work prior to award. This is a public works project subject to New York State Labor Law, including prevailing wage requirements as established by the New York State Department of Labor (Prevailing Wage Rate Schedule PRC# 2026029387). All contractors and subcontractors must register with the NYSDOL and comply with Article 8 of the Labor Law. The Contractor must provide performance and labor/material payment bonds, comprehensive insurance coverage including General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Automobile Liability ($1,000,000), and Excess/Umbrella Liability ($5,000,000), with Dutchess Community College, County of Dutchess, DLR Group, and Accenture Infrastructure and Capital Projects named as additional insured parties. All bids must remain firm for forty-five days after opening, and the successful bidder must submit all required documentation within five days of receiving the Notice of Award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DUTCHESS

COMMUNITY COLLEGE

RFB-DCC-08-2027

CBI Air Handling Unit Replacement

Project Manual Dated: October 19, 2026

General Requirements prepared by:

Lisa Keto, DCC

Drawings and Specifications Prepared by:

DLR Group Architecture and Engineering, P.C.

a New York professional corporation

33 East 33rd Street, Suite 401 New York, NY 10016

Construction Management:

Accenture Infrastructure and Capital Projects, LLC 395 9th Avenue, New York, NY 10001

Bids Due: November 13, 2026

SUBMIT BIDS:

By Mail to:

Dutchess Community College 53 Pendell Road Poughkeepsie, NY 12601 Attention: Michael Maher, Purchasing Agent

Or In person to:

Purchasing Bowne Hall, Room 205

PHONE (845) 431-8305 EMAIL Michael.Maher@sunydutchess.edu

Michael Maher Purchasing Agent

Important Notice Dutchess Community College officially distributes RFB’s from the Purchasing Department or through the Empire BidNet System www.empirestatebidsystem.com. Copies of RFB documents obtained from any other source are not considered official copies. Only those vendors who obtain RFB documents from either the Purchasing Department or the Empire State online bid system are guaranteed to receive addendum information if such information is issued.

http://www.empirestatebidsystem.com./

Dutchess Community College

SECTION 00 0103

PROJECT NOTICE

Project Notice Section 00 0103

Please take notice: These documents and accompanying drawings are for Bid RFB-DCC-08-2027 to cover as follows:

The project shall commence upon Notice of Award. Substantial completion of work for the CBI Air Handling Unit Replacement is to be on or before October 15, 2027. The General Contractor is required to make provisions for all work in the project site, based on these schedules.

Project Contacts:

Bidding and Procurement:

Michael Maher, Purchasing Agent (845) 431-8305 Dutchess Community College 53 Pendell Road michael.maher@sunydutchess.edu

DCC Project Management:

Roberto Cirillo, Associate Vice President of Administration (845) 431-8655 Campus Facilities Dutchess Community College 53 Pendell Road roberto.cirillo@sunydutchess.edu

Contract and Payment Administration:

Lisa Keto, Associate for Capital Finance and Administration (845) 431-8960 Dutchess Community College 53 Pendell Road keto@sunydutchess.edu

Architect:

Yoo Jin Lee, Project Architect (212) 564-8705 DLR Group ylee@dlrgroup.com

Construction Management:

Darren Spitzkoff, Senior Director (908) 875-0532 Accenture Infrastructure & Capital Projects 2 Headquarters Plaza, West Tower, 4th Floor Morristown, NJ 07960 darren.spitzkoff@accenture.com mailto:michael.maher@sunydutchess.edu mailto:roberto.cirillo@sunydutchess.edu mailto:keto@sunydutchess.edu mailto:ylee@dlrgroup.com mailto:darren.spitzkoff@accenture.com

TABLE OF CONTENTS

Table of Contents Section 00 0110 - 1

DIVISION 00 BIDDING AND CONTRACTING REQUIREMENTS

Procurement Requirements 00 0101 Project Title Page 00 0103 Project Notice 00 0110 Table of Contents 00 0115 Index to Drawings with Specifications 00 1100 Notice to Bidders 00 2100 General Information/Conditions for Bidders

Required Forms for Bidding 00 4100 Bid Form 00 4519 Non-Collusive Bidding Certification 00 4520 Certification of Compliance with the Iran Divestment Act 00 4521 Sexual Harassment Prevention Certification 00 4546 Public Work Contractor and Subcontractor Registry

Contracting Requirements 00 5000 Contract Requirements 00 5100 Notice of Award 00 5200 Sample Agreement 00 6113.13 Performance Bond – AIA DOC A312-2010 00 6113.16 Labor and Material Payment Bond – AIA DOC A312-2010 00 6216 Insurance Requirements 00 6276 Payment Application and Closeout

Forms:

Application and Certificate for Payment - AIA DOC G702/G703-1992 Affidavit of Payment of Debts and Claims - AIA DOC G706-1994 Affidavit of Release of Liens - AIA DOC G706A-1994 Consent of Surety to Final Payment, AIA DOC G707 Certificate of Substantial Completion - AIA DOC G704 NYS Labor Law, Section 220-A - Prime Contractor's Certification

00 7200 General Conditions of the Contract 00 7343 General Municipal Law 00 7346 Prevailing Wages

DIVISION 01 PROJECT REQUIREMENTS/SPECIFICATIONS

01 1000 Summary of Work 01 2100 Allowances

End of Table of Contents

Index to Drawings Section 00 0115

SECTION 00 0115

INDEX TO DRAWINGS WITH SPECIFICATIONS

GENERAL

G0.1 Cover Sheet G1.1 General Notes, Symbols and Abbreviations

ARCHITECTURAL

A0.1 General Notes, Architectural Symbols & Abbreviations A0.2 Specifications AD 1.3 Demolition Roof Plan AD 3.2 Level 02 - Demolition Reflected Ceiling Plan A1.3 Roof Plan A3.2 Level 02 - Reflected Ceiling Plan A5.1 Building Sections and Details

STRUCTURAL

S1 Structural Notes, Plans and Details

MECHANICAL

M0.1 Mechanical General Notes & Symbols MD1.2 Mechanical Demo Second Floor Plan MD1.3 Mechanical Demo Roof Plan M1.2 Mechanical Second Floor Plan M1.3 Mechanical Roof Plan M1.4 Mechanical - Testing and Balancing Plan M1.5 Mechanical Piping - Testing and Balancing Plan M0.2 Mechanical Specifications M4.1 Mechanical Sections M4.2 Mechanical Sections M5.1 Controls Diagrams M5.2 Controls Diagrams M7.1 Mechanical Details M8.1 Mechanical Schedules

ELECTRICAL

E0.1 Electrical Symbols, Abbreviations, & Notes E0.2 Electrical Specifications ED1.2 Level 02 - Electrical Demolition Plan ED1.3 Roof Level - Electrical Demolition Plan E1.2 Level 02 - Lighting Plan E2.1 Level 01 - Power Plan E2.3 Roof Level - Power Plan

Index to Drawings Section 00 0115

E3.2 Level 02 - Special Systems Plan E5.1 Electrical Diagrams E6.2 Electrical Details & Schedules

END OF SECTION 00 0115

Notice to Bidders Section 00 1100

NOTICE TO BIDDERS

The Board of Trustees of Dutchess Community College, Poughkeepsie, New York (in accordance with Section 103 of Article 5A of the General Municipal Law) hereby invites the submission of sealed bids on:

RFB-DCC-08-2027:

CBI AIR HANDLING UNIT REPLACEMENT

Beginning immediately, the Bidding Documents including specifications and bid forms may be examined and obtained from the Office of Purchasing at Dutchess Community College, Bowne Hall, Room 205, Poughkeepsie, New York. Official bid copies may be advertised and /or obtained on the following website: http://www.empirestatebidsystem.com

Bids will be received until 2:00 pm on the 13th day of November, 2026 in the Office of Purchasing, Dutchess Community College, Bowne Hall, Room 205, Poughkeepsie, New York, bids will be publicly opened and read aloud at that time in Bowne 203.

A pre-bid meeting will be held on October 26, 2026 at 10:00 am. Interested parties shall meet at Dutchess Community College, Bowne Hall, Room 203. Although not mandatory this visit is recommended.

All communications and any clarifications or interpretations of the Bidding Documents shall be directed, in writing, to Lisa Keto, Associate for Capital Finance and Administration, email to keto@sunydutchess.edu and copy Michael Maher, Purchasing Agent, michael.maher@sunydutchess.edu, by EOB November 3, 2026.

All submitted bids shall be sealed and distinctly marked:

“Proposal for Bid: RFB-DCC-08-2027: CBI Air Handling Unit Replacement” Opening Date November 13, 2026 and shall be mailed or delivered directly to the Office of Purchasing, Dutchess Community College, 53 Pendell Road, Poughkeepsie, New York 12601.

The Board of Trustees reserves the right to waive irregularities and accept or reject any or all bids, or any part of any bid and may re-advertise for new proposals, if the best interest of Dutchess Community College will be served.

Dated: October 19, 2026 Michael Maher Purchasing Agent mailto:keto@sunydutchess.edu mailto:michael.maher@sunydutchess.edu

General Information/Conditions to Bidders Section 00 2100

SECTION 00 2100

GENERAL INFORMATION/CONDITIONS FOR BIDDERS

1. Should the bidder find discrepancies or omissions in the specifications, he shall notify the Purchasing Department, at once, and the Purchasing Department will send written instructions to all bidders. The Purchasing Department will not assume responsibility for any oral instructions, or interpretations of meaning of the specifications or other contract documents to any bidder by any person or persons.

2. All bids shall be made out on the proposal forms attached hereto and all the attached certificates must be completed and signed in compliance with the provisions of the General Municipal Law.

3. All prices shall remain firm for forty-five (45) days unless otherwise stated. No bidder may withdraw a bid within forty-five (45) days after the actual date of the opening thereof. – Any bid may be withdrawn without prejudice prior to the official bid opening time or any publicized postponement thereof.

4. Where the specifications employ a trade name or the name of a product of a particular supplier, it is intended that such name is for descriptive purposes only to indicate the type of product desired and that any equal product will be accepted.

If a bidder offers a substitution (alternate), he shall provide with his bid proposal the necessary catalog tear sheet, literature, specifications, etc., sufficient to enable the College to make a determination as to the acceptability of the proposed substitution (alternate). Failure to provide such information with the bid proposal will be sufficient reason for rejection of bid.

In the event the specifications fail to state a catalog number or brand name, these specifications shall be deemed to require an article of good quality, finish, design, workmanship, durability, and suitability for the use intended. The acceptance of the merchandise is not final until after delivery and testing of the substituted (alternate) items.

5. Equipment and material specified is to be delivered to the areas designated by the College, and the successful bidder is to be responsible for the cost.

6. Any bidder, contractor, or manufacturer who, in the course of his work, uses or supplies products which may be toxic or harmful, shall provide SDS material sheets to the Purchasing Department prior to the use of those products by the College.

7. The Board of Trustees reserves the right to waive irregularities and accept or reject any bid or any part of any bid.

8. Dutchess Community College reserves the right to award contract on the basis of overall advantage to purchaser with respect to the aggregate of separate items and estimated overall requirements, i.e., the right is reserved to award separate items to different vendors. The College reserves the right to accept a combined total bid if the aggregate is beneficial to the College. The College also reserves the right to increase or decrease the quantities of individual items, the total price to be adjusted in accordance with the unit price quoted.

9. In determining the qualifications of a bidder, the College will consider his record in the performance of any contracts for similar services or products in which he may have entered with other public bodies; and the College specifically and expressly reserves the right to reject the bid of such bidder if the record discloses that such bidder, in the opinion of the College, has not properly performed such contracts or has habitually and without just cause neglected the payment of bills or has otherwise disregarded his obligations to employees or the public he serves. The College may make such investigation as it deems necessary to determining the ability of the bidder to perform the terms of the contract and the bidder shall furnish the College all information for this purpose as the College may request. CONDITIONAL BIDS WILL NOT BE

ACCEPTED.

10. Any merchandise provided under the contract which is, or becomes, defective during the guarantee period shall be replaced by the successful bidder free of charge with the specific understanding that all replacements shall carry the same guarantee as the original equipment.

11. SELF-PERFORMANCE REQUIREMENT: The Contractor shall self-perform a minimum of

51% of the total contract value with its own forces. Work that qualifies as self-performed includes direct labor performed by employees of the contractor and materials, equipment, and supervision provided by contractor’s organization. Subcontracted work shall not be counted toward this self-performance requirement. The Owner reserves the right to review and approve the Contractor’s proposed breakdown of self-performed versus subcontracted work prior to award. During construction, the Contractor shall submit periodic reports verifying compliance with this requirement. Failure to meet or maintain this requirement may constitute a material breach of contract and may result in withholding of payment or termination for cause.

12. INDEPENDENT CONTRACTOR: The CORPORATION / CONTRACTOR/ AGENCY / CONSULTANT, is an independent contractor and covenants and agrees that it, its agents, servants and/or employees, will neither hold itself/themselves out as, nor claim to be an employee, servant or agent of the COLLEGE AND/OR THE COUNTY, and that it, its agents and employees will not make claim, demand or application to or for any right or privilege applicable to an officer or employee of the COLLEGE AND/OR THE COUNTY including, but not limited to, Worker’s Compensation coverage, unemployment insurance benefits, Social Security Coverage or retirement membership or credit.

13. ASSIGNABILITY OF CONTRACT:

The Contractor is prohibited from assigning, transferring, conveying, sub-contracting or disposing of this contract, or of any part thereof, or any payment to become due thereunder, or of his right, title or interest therein or his power to execute such contract to any other person or corporation without the previous consent in writing of the OWNER awarding the contract. If the Contractor fails to comply with this clause, the owner may immediately declare breach of contract.

14. COMPLIANCE WITH LAWS:

The Contractor shall comply with all the provisions of laws in the State of New York and of the United States of America which affect municipalities and municipal contracts, and more particularly the Labor Law, the Immigration and Naturalization Laws and Regulation, the General Municipal Law, the Workers’ Compensation Law, the Lien Law, Personal Property Law, State Unemployment Insurance Law, Federal Social Security Law, State, Local and Municipal Health Laws, Rules and Regulation, and any and all regulations promulgated by the State of New York and of amendments and additions thereto, insofar as the same shall be applicable to any contract awarded hereunder with the same force and effect as if set forth at length herein. The bidder’s special attention is called to those laws which are set forth in detail below:

15. For Capital (“Public Work”) Projects Only:

This project is a “Public Work” project and is subject to all provisions contained in the New York State Labor Law. Any Contractor submitting a bid on this project shall acknowledge that said project is “Public Work,” shall agree to comply with all Federal, State and local laws, rules and regulations relating to the work to be performed including but not limited to Article 8 of said law, and shall pay prevailing wage rates for the locality established by the New York State Department of Labor, to all laborers, workers and mechanics, and shall require all subcontractors to do the same.

In order to ensure compliance with these provisions, the College shall be entitled to review and/or audit the Contractor’s payroll records from time to time, receive certified copies of payrolls, and may require the Contractor to make said records available to the College either at the Contractor’s place of business or, at the option of the College, to submit certified copies with requests for payment or at such other times as the College may require.

Each bidder must provide an affirmative statement that the bidder has not been found guilty of a willful violation of the New York State Labor Law for failure to pay prevailing wages and supplements, as those terms are defined by the New York State Labor Law, within the twelve

(12) months immediately preceding the submission of the bid.

In the event that the Contractor shall fail, in one or more instances, to pay the prevailing wages and supplements in accordance with Article 8 of the New York State Labor Law, Section 220 et seq. and as described herein, it shall be considered a material breach of the contract.

For the breach or violation of this provision, without limiting any other rights or remedies to which the College or any individual may be entitled or any civil or criminal penalty for which any violator may be liable, the College shall have the right, in its discretion, to terminate the contract immediately on notice. In such event, the Contractor shall be liable to the College for any additional costs incurred by the College in the completion of the project.

The conditions contained herein are designed to encourage compliance with the Labor Law and to provide a greater means to detect violations. In the event violations are detected, either by the College or otherwise, the remedies contained in said law shall be exclusive and shall not create any obligations by the College to enforce said law on behalf of anyone nor create any rights on behalf of anyone against the College.

A unique prevailing wage rate schedule has been assigned to this project, PRC# 2026029387 – CBI Air Handling Unit.

16. NEW YORK STATE OSHA 10-HOUR CONSTRUCTION SAFETY AND HEALTH

COURSE S1537-A:

This provision, effective July 18, 2008, is an addition to the existing prevailing wage rate law, Section §220, section 220-h. It requires that on all public works projects of at least $250,000.00 all laborers, workers, and mechanic working on the site, be certified as having successfully completed the OSHA 10 – hour construction safety and health course. Rules and regulations may be viewed on the NYSDOL website www.labor.state.ny.us .

17. Bidders must agree to conform to Section 103-a, b, c and d of the General Municipal Law of the

State of New York, a copy of which text is appended hereto.

18. Dutchess Community College is an equal opportunity employer and expects Vendor/Contractor to comply with Federal and State Anti-Discrimination Laws.

19. It is the policy of the State University of New York to take affirmative action to ensure that minority business enterprises are given the opportunity to demonstrate their ability to provide the University with goods and services at competitive prices.

20. The successful Bidder is required to submit to the College with the monthly Requisition for

Payment Certified Payrolls. In addition, Contractors and subcontractors are required to submit payroll records for any project covered by Article 8 of NYS Labor Law to the Department of Labor for all work performed on the project. See Electronic Payroll Submission | Department of Labor for requirements. A copy of the Department of Labor Registration Certificate must be supplied to the College.

21. Dutchess Community College is established under authority of the State of New York and is entitled to exemption from New York State, Federal and Local taxes.

22. PLEASE NOTE: In order to keep our vendor files current, the College would appreciate a response to this bid even if you do not wish to bid at this time.

23. NON-COLLUSIVE BIDDING CERTIFICATION FORM MUST BE FILLED OUT AND

RETURNED WITH BID; FAILURE TO DO SO CAN DISQUALITY BIDDER.

24. Bids which have been corrected by white out or cross out, and have not been initialed and dated will be rejected as unresponsive.

25. Delivery: FOB Dutchess Community College.

Delivery of equipment and materials shall be made only between the hours of 7:00 AM and 3:00 PM, Monday thru Friday.

26. The contract, if awarded, will be to the lowest responsive/responsible bidder(s) in part or in whole who meet(s) all the terms of the specifications. Dutchess Community College guarantees no minimum or maximum purchases or contracts as a result of award of this bid. Dutchess Community College reserves the right to purchase any goods or services included as a part of this bid from any means legally available to it at any time.

http://www.labor.state.ny.us/ https://www.nysenate.gov/legislation/laws/LAB/A8 https://dol.ny.gov/Electronic-Payroll

SECTION 00 4100

FORM FOR BIDDING

Bid Form Section 00 4100

To be considered, bids must be submitted using this Bid Form.

DATE: __________________________

Contractor Information:

Company Name:

Address:

Contact Name:

Title:

Telephone:

E-mail

Pursuant to, and in compliance with the Invitation to Bid and the Instructions to Bidders relative thereto and all of the Contract Documents, including any Addenda issued by the Owner, whether received by the undersigned or not, we hereby propose to furnish all plant, labor, materials, supplies, equipment and other facilities necessary or proper for, or incidental to the construction of the entire work, all in strict accordance with the provisions of the Drawings and Specifications entitled RFB-DCC-08-2027, dated October 19, 2026 all to the satisfaction and approval of the Owner in accordance with the terms and conditions of the Contract Documents for the following sum(s):

Note: For all specifications and details included in the Project Documents where a brand name, trade name, catalog reference, or patented commodity is referenced, the term "or equal" is understood to apply. References to such specific commodities are intended as descriptive, and not restrictive. When in the specifications, two or more kinds, types, brands, or manufacturers of materials are named they are regarded as the required standard of quality and are presumed to be equal. The Contractor may select one of these items or, if the contractor desires to use any kind, type, brand, or manufacturer of material other than those named in the specification, he shall indicate in writing, per the Form for Bidding, what kind, type, brand, or manufacturer is included in the base bid for the specified item. Comparable products will be considered if proof of comparability is provided, including appropriate catalog excerpts, descriptive literature, specifications and list data, etc. This identification of substitutions/equivalent products is required of all Bidders as part of their Bid.

ADDENDA

Any addenda issued by the Owner to the undersigned prior to the Bid opening date shall become part of the Contract Documents. The Bidder shall enter on this list any addenda issued after this Form of Proposal has been received and shall record receipt of and date of each addenda.

Receipt of the following addenda is acknowledged:

No. 1 Date:

No. 2 Date:

No. 3 Date:

and the provision(s) thereof is (are) included in this Bid.

Contractor should only complete the section for the package on which they are proposing. The remaining may be left blank but all bid form pages must be attached to the bid.

BASE BIDS:

Provide all labor, materials, supplies, equipment, and other facilities as required for construction of the CBI Air Handling Unit Replacement, including all incidentals, as indicated in the Contract Specifications and in the Contract Drawings.

HVAC CONTRACT:

Lump Sum: _________________________________________________________ Dollars

Allowance on contract - $35,000

Note: Include in the Base Bid the allowance as indicated for unforeseen conditions as described in Section 01 2100.

ELECTRIC CONTRACT:

Lump Sum: _________________________________________________________ Dollars

Allowance on contract - $15,000

Note: Include in the Base Bid the allowance as indicated for unforeseen conditions as described in Section 01 2100.

SUBSTANTIAL COMPLETION DATE:

Bidder agrees to achieve substantial completion by October 15, 2027 with final completion within thirty

(30) days thereafter.

SELF-PERFORMANCE:

Bidder acknowledges that the Owner requires the Contractor to self-perform a minimum of fifty-one percent (51%) of the total contract with its own forces.

• The bidder anticipates self-performing approximately _____ % of the total contract value with its own employees and resources.

• The bidder intends to self-perform the following components of the work (attach additional page if necessary):

SUB-CONTRACTORS

List sub-contractors that will be utilized for this project:

(attach additional page if necessary):

Company Name and

Address

Contact Information

(name, phone, email)

Work to be Performed

AFFIRMS

1. The undersigned affirms and agrees that this Proposal is a firm one which remains in effect and will be irrevocable for a period of forty-five (45) days after opening of Bids. This Bid may be withdrawn at any time prior to the scheduled time for the opening of Bids or any authorized postponement thereof.

2. The undersigned agrees, if notified of selection for award of contract, to furnish to the Owner all submissions and bonds required by the Bidding Documents.

EXECUTION OF CONTRACT

1. If written notice of acceptance of this bid is mailed, e-mailed or delivered to the undersigned within forty-five (45) days after the date of the opening of the bids, or any time thereafter should the Proposal not be withdrawn, the undersigned will, within five (5) days of Board of Trustee approval, execute the Form of Agreement with the Owner as indicated in these Documents.

2. The undersigned further agrees, if awarded contract, to furnish to the Owner all submissions and Certificates of Insurance required by the Contract Documents.

3. The undersigned agrees to comply with the requirements as to the conditions of employment, wage rates, etc., set forth in these Documents.

AUTHORIZED SIGNATURE

This proposal is submitted by:

Name of Contractor

Name of Authorized Representative (Print)

Title

Signature of Authorized Representative

Non-Collusive Bidding Certification Section 004519

NON-COLLUSIVE BIDDING CERTIFICATION

By submission of this bid or proposal, the bidder certifies that:

(a) This bid or proposal has been independently arrived at without collusion with any other bidder or with any competitor or potential competitor;

(b) This bid or proposal has not been knowingly disclosed and will not be knowingly disclosed, prior to the opening of bids or proposals for this project, to any other bidder, competitor or potential competitor;

(c) No attempt has been or will be made to induce any other person, partnership or corporation to submit a bid or proposal;

(d) The person signing this bid or proposal certifies that he has fully informed himself regarding the accuracy of the statements contained in this certification, and under the penalties of perjury, affirms the truth thereof, such penalties being applicable to the bidder as well as to the person signing in its behalf.

(e) That attached hereto (if a corporate bidder) is a certified copy of resolution authorizing the execution of this certificate by the signature of this bid or proposal in behalf of the corporate bidder.

SIGNED___________________________________________________________________________ (Title)

RESOLUTION – FOR CORPORATE BIDDERS ONLY

RESOLVED that ___________________________be authorized to sign and submit the bid or proposal of this corporation for the following project:___________________________________________________________ and to include in such bid or proposal the certificate as to non-collusion required by Section one hundred three-d (103-d) of the General Municipal Law as the act and deed of such corporation, and for any inaccuracies or misstatements in such certificate this corporate bidder shall be liable under the penalties of perjury.

The foregoing is a true and correct copy of the resolution adopted by ________________________Corporation at a meeting of its

Board of Directors held on the __________day of ___________, 20____ and is still in full force and effect on this __________day of _______________, 20____.

(SEAL OF THE CORPORATION)

(Secretary)

Non-Collusive Bidding Certification Section 004519

Non-Collusive Bidding Certification (Cont’d.)

FOR CAPITAL (PUBLIC WORKS) PROJECTS ONLY

VENDORS MUST SIGN THE FOLLOWING STATEMENT.

I affirm that __________________________has not been found guilty of a willful violation of the New York State Labor Law for failure to pay prevailing wages and supplements, as those terms are defined by the New York State Labor Law, within the twelve (12) months immediately preceding the submission of this bid.

Signature of Owner Officer

Certification of Compliance with the Iran Divestment Act Section 00 4520

CERTIFICATION OF COMPLIANCE WITH THE IRAN DIVESTMENT ACT

As a result of the Iran Divestment Act of 2012 (the “Act”), Chapter 1 of the 2012 Laws of New York, a new provision has been added to State Finance Law (SFL) § 165-a and New York General Municipal Law § 103-g, both effective April 12, 2012. Under the Act, the Commissioner of the Office of General Services (OGS) will be developing a list of “persons” who are engaged in “investment activities in Iran” (both are defined terms in the law) (the “Prohibited Entities List"). Pursuant to SFL § 165-a(3)(b), the initial list is expected to be issued no later than 120 days after the Act’s effective date at which time it will be posted on the OGS website.

By submitting a bid in response to this solicitation or by assuming the responsibility of a Contract awarded hereunder, each Bidder/Contractor, any person signing on behalf of any Bidder/Contractor and any assignee or subcontractor and, in the case of a joint bid, each party thereto, certifies, under penalty of perjury, that once the Prohibited Entities List is posted on the OGS website, that to the best of its knowledge and belief, that each Bidder/Contractor and any subcontractor or assignee is not identified on the Prohibited Entities List created pursuant to SFL § 165-a(3)(b).

Additionally, Bidder/Contractor is advised that once the Prohibited Entities List is posted on the OGS Website, any Bidder/Contractor seeking to renew or extend a Contract or assume the responsibility of a Contract awarded in response to this solicitation must certify at the time the Contract is renewed, extended or assigned that it is not included on the Prohibited Entities List.

During the term of the Contract, should Dutchess Community College receive information that a Bidder/Contractor is in violation of the above-referenced certification, Dutchess Community College will offer the person or entity an opportunity to respond. If the person or entity fails to demonstrate that he/she/it has ceased engagement in the investment which is in violation of the Act within 90 days after the determination of such violation, then Dutchess Community College shall take such action as may be appropriate including, but not limited to, imposing sanctions, seeking compliance, recovering damages or declaring the Bidder/Contractor in default.

Dutchess Community College reserves the right to reject any bid or request for assignment for a Bidder/Contractor that appears on the Prohibited Entities List prior to the award of a contract and to pursue a responsibility review with respect to any Bidder/Contractor that is awarded a contract and subsequently appears on the Prohibited Entities List.

I, ____________________________________, being duly sworn, deposes and says that he/she is the _________________________________ of the ____________________________________________ Corporation and that neither the Bidder/Contractor nor any proposed subcontractor is identified on the Prohibited Entities List.

SIGNED

SWORN to before me this

_______________ day of _______________

20___

Notary Public: _________________________

Sexual Harassment Prevention Certification Section 004521

Sexual Harassment Prevention Certification

By submitting a bid in response to this solicitation or by assuming the responsibility of a Contract awarded hereunder, each Bidder/Proposer/Contractor, any person signing on behalf of any Bidder/Proposer/Contractor and any assignee or subcontractor and, in the case of a joint bid, each party thereto, certifies, under penalty of perjury, that the bidder has implemented a written policy addressing sexual harassment prevention in the workplace and provides annual sexual harassment training to all of its employees in compliance with Department of Labor regulations.

Company/Firm:

Address:

Telephone:

Signature:

Print Name:

Title:

Date:

Public Work Contractor and Subcontractor Registry Section 004546

Public Work Contractor and Subcontractor Registry

As of December 30, 2024, all contractors and subcontractors submitting bids or performing construction work on public work projects or private projects covered by Article 8 of the Labor Law are required to register with the New York State Department of Labor (NYSDOL) under Labor Law Section 220-i and must submit the NYSDOL Contractor Registration Certificate with their bid package.

https://dol.ny.gov/contractor-and-subcontractor-landing

The law defines a “contractor” as any entity entering into a contract to perform construction, demolition, reconstruction, excavation, rehabilitation, repair, installation, renovation, alteration, or custom fabrication. The law defines “subcontractor” as any entity subcontracting with a contractor to perform construction, demolition, reconstruction, excavation, rehabilitation, repair, installation, renovation, alteration, or custom fabrication, which is subject to Article 8 of the Labor Law. Contractors are responsible for verifying that any subcontractors they work with are registered.

Contractors need to register before submitting any new bids or commencing new work on a covered project on or after December 30, 2024. Subcontractors need to register before commencing new work on a covered project on or after December 30, 2024. NYSDOL encourages all contractors and subcontractors to register as soon as possible to obtain a Certificate of Registration to avoid negatively impacting a bidding period or project schedule.

The Bureau of Public Work & Prevailing Wage Enforcement at the New York State Department of Labor is responsible for enforcing prevailing wage laws in New York State.

The Bureau of Public Work & Prevailing Wage Enforcement publishes the annual prevailing wage schedule every year on July 1. To find information about the prevailing wage rate for your area, or to find contact information for your local Public Works and Prevailing Wage Enforcement District Office, please visit Bureau of Public Work and Prevailing Wage Enforcement website or send an email to labor.sm.pwask@labor.ny.gov.

https://www.nysenate.gov/legislation/laws/LAB/220-I https://dol.ny.gov/contractor-and-subcontractor-landing mailto:labor.sm.pwask@labor.ny.gov

Contract Requirements Section 00 5000

CONTRACT REQUIREMENTS

The successful Bidder will be issued a Notice of Award and will be required to enter into a contract per the sample form of agreement referenced in this Section 00 5000.

Within Five (5) days from the receipt of the signed Notice of Award, the successful Bidder shall deliver all required submittals including the Labor and Material Payment Bond, Performance Bond, Certificate of Insurance as specified in Section 00 6216, List of Subcontractors and Schedule of Values.

NOTICE OF AWARD

(DATE)

TO:

RE: Dutchess Community College (Project)

Dear ____________:

You are the successful bidder for ______________ on the _________________. It is our intention to issue a contract in the amount of _____________________- Dollars and __/100 ($000,000.00).

This is your authorization to proceed with all required submittals. Please be advised that time is of the essence on this project. The following items must be submitted to the Architect, ________________________ within the next Five – (5) days:

• Schedule of Values

• List of Subcontractors

The following items must be submitted to Dutchess Community College, attention Lisa Keto, 53 Pendell Road, Poughkeepsie, New York 12601 within the next Five – (5) days:

• Certificates of Insurance (listing Dutchess Community College and the County of Dutchess as Additional Insured, a separate certificate for each)

• Performance Bond

• Labor and Material Payment Bond

• Schedule of Values

• List of Subcontractors

Please use the bond forms as shown in the specifications. Your contract will be prepared and forwarded to you upon receipt of the executed Notice of Acceptance below. The contract date will be dated the same date as this Notice of Award (____________). Bonds should reference the contract date.

If you fail to execute said Agreement and furnish said Certificates of Insurance within Ten – (10) days from the date of this Notice, said Owners will be entitled to consider all your rights arising out of the Owner’s acceptance of your bid to be abandoned. The Owner will be entitled to such other rights as may be granted by law.

Dated this ____ day of ___, 20__.

By:_____________________________

Vice President for Finance and Administration

ACCEPTANCE OF NOTICE

Receipt of the foregoing Notice of Award is hereby acknowledged by:

________________________________, this _____ day of _________________, 20__.

By:_____________________________

Title:____________________________

Performance Bond Section 00 6113.13

Labor and Material Payment Bond Section 006113.16

Section 00 6216

INSURANCE REQUIREMENTS. At all times during the term of this Agreement, the Contractor and his sub-contractors, if any, shall maintain at his own cost the following insurance and shall provide proof thereof to the College, the County, the Architect and the Construction Manager in the form of a Certificate of Insurance (A separate certificate for each entity), prior to commencing work under this Agreement:

Worker’s Compensation Employer’s Liability (statutory limits). In compliance with the Workers’ Compensation Law of the State of New York, each contractor shall provide:

a. a certificate of insurance on an Acord form indicating proof of coverage for Worker’s Compensation, Employer’s Liability, OR

b. a New York State Workers Compensation Notice of Compliance (Form C-105, Form U-26.3, Form

SI-12 or Form SI-105.2P).

c. In the event that the Contractor is exempt from providing coverage, he must provide a properly executed copy of the Certificate of Attestation of Exemption from NYS Workers' Compensation and/or Disability Benefits Coverage: Form CE-200.

d. If the workers compensation Notice of Compliance is used instead of the Acord certificate of insurance, the Notice of Compliance must indicate that a waiver of subrogation in favor of the Owner is provided.

1. A certificate of participation in a self-insurance program. The department responsible for the implementation of the Agreement will obtain verification from the Director of Risk Management for those municipalities participating in the Dutchess County Self-Insured Plan.

Commercial General Liability Insurance coverage including

a. Blanket contractual coverage for the operation of the program under this Agreement with limits not less than $1,000,000 per occurrence and $2,000,000 in the aggregate.

b. This insurance shall be written on an occurrence coverage form and include bodily injury and property damage liability.

c. The County and the College must be listed as additional insured.

1. The additional insured endorsement for the Commercial General Liability insurance required above shall not contain any exclusion for bodily injury or property damage arising from completed operations.

Automobile Liability Insurance coverage for all owned, scheduled, hired, and non-owned vehicles with a combined single limit of liability of not less than $1,000,000.

a. This insurance shall include coverage for bodily injury and property damage.

b. The County and the College must be listed as additional insured.

Excess/Umbrella Liability with limits not less than $5,000,000 per occurrence; $5,000,000 in the aggregate. The County, the College and the Architect must be listed as additional insured.

THE COUNTY OF DUTCHESS, DUTCHESS COMMUNITY COLLEGE, DLR GROUP AND

ACCENTURE INFRASTRUCTURE AND CAPITAL PROJECTS, LLC MUST BE NAMED AS

CERTIFICATE HOLDERS AND ADDITIONAL INSURED.

The Acord form certificate of insurance must contain the following provisions:

a. The Owner must be listed as a certificate holder and additional insured on the commercial general, excess/umbrella, and automobile liability policies.

Section 00 6216

b. In addition, the commercial general liability policy must include the additional insured endorsement forms cg 20137 July 2004 edition and the cg 2010 April 2013 edition or their equivalent.

c. The commercial general, excess/umbrella and automobile policies are primary and noncontributory.

d. The commercial general liability, auto liability and workers compensation policies must contain a waiver of subrogation in favor of the Owner.

All policies of insurance referred to above:

a. Shall be underwritten by companies authorized to do business in the State of New York with an

A.M. Best financial strength rating of A- or better.

b. In the alternative, the policies of insurance referred to above may be underwritten by Non-

Admitted companies with an A.M. Best financial strength rating of A+ or higher.

c. In addition, every policy required above shall be primary and noncontributory.

d. Any insurance carried by the College or the County, its officers, or its employees shall be excess and noncontributory insurance to that provided by the Contractor.

e. The Contractor and sub-contractor(s), if any, shall be solely responsible for any deductible losses under each of the policies required above.

f. Payment(s) to the Contractor may be suspended in the event the Contractor and sub-contractor(s), if any, fails to provide the required insurance documentation in a timely manner.

Prior to cancellation or material change in any policy, a thirty (30) day notice shall be given to the County Attorney and to the College at the addresses listed below:

Dutchess County Attorney Dutchess Community College County Office Building Office of the Vice President for Finance and Administration 22 Market Street 53 Pendell Road Poughkeepsie, New York 12601 Poughkeepsie, NY 12601

On receipt of such notice, the County and the College shall have the option to cancel this Agreement without further expense or liability to the County or the College, or to require the Contractor to replace the cancelled insurance policy, or rectify any material change in the policy, so that the insurance coverage required by this paragraph is maintained continuously throughout the term of this Agreement in form and substance acceptable to the County and the College.

Failure of the Contractor to take out or to maintain, or the taking out or the maintenance of any required insurance, shall not relieve the Contractor from any liability under this Agreement nor shall the insurance requirements be construed to conflict with or to limit the obligations of the Contractor concerning indemnification.

All losses of County or College property shall be adjusted with and made payable directly to the County or the College.

All Certificates of Insurance shall be approved by the County’s Director of Risk Management and Dutchess Community College or their designee’s prior to commencement of any work under this Agreement.

In the event that claims in excess of these amounts are filed in connection with this Agreement, the excess amount or any portion thereof may be withheld from payment due or to become due the Contractor until the Contractor furnishes such additional security as is determined necessary by the County and the College.

Payment Application and Closeout Section 00 6276

PAYMENT APPLICATION AND CLOSEOUT

Applications for payment shall be submitted to the Construction Manager, who will review and verify that the work completed to date is in accordance with the project specifications and contract requirements. Upon verification, the Construction Manager shall forward the application to the Architect for review and signature.

Once approved by the Architect, the application for payment shall be submitted to the Owner for processing and payment.

Based upon Applications for Payment submitted to the Owner, the Owner shall make progress payments to the Contractor as provided below:

1. The Owner will act upon the Contractor's Application for Payment within 7 days after receipt.

2. Application for Payment Forms: Use AIA G732, Application and Certificate for Payment, and AIA G703, Continuation Sheet.

3. Preparation of Applications for Payment: Complete form entirely. All Applications shall be notarized by a duly authorized notary public so licensed in the State of New York.

4. Applications for Payment shall indicate the percentage of completion for each portion of the Work as of the end of the period covered by the Application for Payment.

5. Provide Certified Payrolls with each payment application. In addition, Contractors and subcontractors are required to submit payroll records for any project covered by Article 8 of NYS Labor Law to the Department of Labor for all work performed on the project. See Electronic Payroll Submission | Department of Labor for requirements. A copy of the Department of Labor Registration Certificate must be supplied to the College.

Final Payment on Contract and Closeout Documents

A. The final Application for Payment (Last payment of contract less retainage) will not be reviewed until the following submittals have been received and reviewed:

1. Application and Certificate for Payment, AIA DOC G732/G703

2. Contractors Affidavit of Payments of Debts and Claims, AIA form G-706.

3. Contractors Affidavit of Release of Liens, AIA form G-706A.

4. Consent of Surety to Final Payment, AIA form G-707

5. Wage Certification.

6. Certificate of Substantial Completion, AIA G734.

B. Retainage will be paid no later than 30 days from the date the Final Payment is paid on the contract.

GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION,

WITH CONSTRUCTION MANAGER AS ADVISER

for the following PROJECT:

CBI Rooftop Air Handling Unit Replacement

The CONSTRUCTION MANAGER:

Accenture Infrastructure and Capital Projects, LLC 395 9th Avenue New York, NY 10001

The OWNER:

Dutchess Community College 53 Pendell Road Poughkeepsie, NY 12601

And

County of Dutchess 22 Market Street Poughkeepsie, NY 12601

The ARCHITECT:

DLR Group Architecture 33 East 33rd Street 4th Floor New York, NY 10016

ARTICLE 1 GENERAL PROVISIONS

§ 1.1 Basic Definitions § 1.1.1 The Contract Documents. The Contract Documents are enumerated in the Agreement between the Owner and Contractor (hereinafter the Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, the Contractor’s bid or proposal, or portions of addenda relating to bidding or proposal requirements, other documents listed in the Agreement, and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive, or (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the Contract Documents do not include the advertisement or invitation to bid, Instructions to Bidders, sample forms, other information furnished by the Owner in anticipation of receiving bids or proposals.

Precedence of Contract Documents shall be in the following sequence:

1) Agreement (Between Owner and Contractor) and Modifications.

2) Addenda, those of later date having precedence over those of earlier date

3) Condition of the Contract (General and Supplemental Conditions).

4) Specifications and Drawings.

§ 1.1.2 The Contract. The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Contractor and the Architect or the Architect’s consultants, (2) between the Owner and the Construction Manager or the Construction Manager’s consultants, (3) between the Owner and the Architect or the Architect’s consultants, (4) between the Contractor and the Construction Manager or the Construction Manager’s consultants, (5) between the Owner and a Subcontractor or Sub-subcontractor (6) between the Construction Manager and the Architect, or (7) between any persons or entities other than the Owner and Contractor. The Construction Manager and Architect shall, however, be entitled to performance and enforcement of obligations under the Contract intended to facilitate performance of their duties.

§ 1.1.3 The Work. The term “Work” means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment, and services provided or to be provided by the Contractor to fulfill the Contractor’s obligations. The Work may constitute the whole or a part of the Project.

§ 1.1.4 The Project. The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by other Contractors, and by the Owner’s own forces and Separate Contractors.

§ 1.1.5 Contractors. Contractors are persons or entities, other than the Contractor or Separate Contractors, who perform Work under contracts with the Owner that are administered by the Architect and Construction Manager.

§ 1.1.6 Separate Contractors. Separate Contractors are persons or entities who perform construction under separate contracts with the Owner not administered by the Architect and Construction Manager.

§ 1.1.7 The Drawings. The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.

§ 1.1.8 The Specifications. The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

§ 1.1.9 Instruments of Service.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .