Cathodic_Protection_Survey_SOW.docx

DOCX document 812 KB Posted

Attached to
Cathodic Protection System Survey
Solicitation number
RFP-SM-0090
Issued by
Los Angeles County, California

About this file

This document is a Scope of Work (SOW) for a professional engineering services contract issued by West Basin Municipal Water District in California for a Cathodic Protection System Survey in 2025. The project involves conducting a comprehensive survey of the district's galvanic cathodic protection system, which protects metallic pipelines throughout its recycled water distribution system. The scope covers testing 366 cathodic protection test stations across approximately 110 miles of pipelines (with 45 miles being metallic), located in various cities. The consultant will measure anode output, determine remaining anode life, perform minor repairs, and develop a technical memorandum detailing test results, deficiencies, and recommended repairs.

The project includes a $10,000 allowance for minor repairs, with work to be performed in accordance with NACE Standards for Cathodic Protection in Underground Metallic Pipelines. The consultant will develop a field survey template, create a digital dashboard for tracking cathodic protection, and provide class IV cost estimates for recommended repairs. The project stems from previous evaluation and design work completed in February 2023, and will involve coordination with West Basin representatives, a project kick-off meeting, development of a critical path method schedule, and a final two-hour workshop to present findings. The consultant will be responsible for monthly invoicing, project administration, and comprehensive reporting on the system's current condition and future maintenance needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A Scope of Work Request for Proposals – Professional Engineering Services Cathodic Protection System 2025 Survey

Scope of Work The selected engineering firm (Consultant) shall provide professional services as needed to conduct a survey of West Basin’s galvanic cathodic protection system that protects metallic pipelines throughout the recycled water distribution system. The Cathodic Protection Survey (Project) will include testing of cathodic protection (CP) test stations (see Table A) to determine if the pipelines are adequately protected, and to determine the remaining life of the anodes. Additionally, the Consultant will perform minor repairs to existing CP systems. These repairs are discussed in further detail in Section 2.2 of this scope of work. The proposed system testing and improvements will be performed in various cities throughout West Basin’s recycled water distribution system (see Exhibit A). Therefore, all testing and improvements must be performed in accordance with West Basin’s and each respective City’s requirements. In addition, the consultant shall identify deficiencies in the current cathodic protection system and provide a cost estimate for repairs.

Table A lists the CP testing stations by pipeline included in the scope of work on the next page while Table B provides information for those pipelines:

Table A – CP Testing Stations Summary

Distribution System Pipeline
Test Station Type
Total
190th Street Corridor Extension
CP Test Station With Anodes
2
42 in. Middle Segment
Corrosion Monitoring Test Station
1
CP Test Station With Anodes
19
42 in. North Segment
Corrosion Monitoring Test Station
3
CP Test Station With Anodes
20
42 in. South Segment
Corrosion Monitoring Test Station
6
CP Test Station With Anodes
22
Contract R-1
Corrosion Monitoring Test Station
8
Contract R-11
CP Test Station With Anodes
13
Contract R-12
Corrosion Monitoring Test Station
1
Contract R-16
Corrosion Monitoring Test Station
1
CP Test Station With Anodes
10
Contract R-17
Corrosion Monitoring Test Station
1
CP Test Station With Anodes
31
Contract R-2
Corrosion Monitoring Test Station
2
Contract R-4
Corrosion Monitoring Test Station
29
Contract R-5
Corrosion Monitoring Test Station
1
CP Test Station With Anodes
50
Contract R-6
Corrosion Monitoring Test Station
4
CP Test Station With Anodes
21
Contract R-7
Corrosion Monitoring Test Station
26
Contract R-8
Corrosion Monitoring Test Station
2
CP Test Station With Anodes
20
Contract R-9
CP Test Station With Anodes
18
Corporate Campus El Segundo Douglas St
CP Test Station With Anodes
2
CRWRP-12 in., 24 in., 30 in. Service Lines
Corrosion Monitoring Test Station
5
HSEPS Improvements
Corrosion Monitoring Test Station
2
Imperial Ave Lateral
Corrosion Monitoring Test Station
2
Lateral 10 (LA Southwest College Lateral)
CP Test Station With Anodes
2
Lateral 6A (Madrona Lateral)
Corrosion Monitoring Test Station
8
CP Test Station With Anodes
13
Lateral II (Victoria Lateral)
Corrosion Monitoring Test Station
5
CP Test Station With Anodes
6
Lateral IIIA (CSUDH Mainline)
Corrosion Monitoring Test Station
3
CP Test Station With Anodes
5
Mariposa Lateral
Corrosion Monitoring Test Station
2

Grand Total

Table B – Distribution System Pipeline Summary

Distribution System Pipeline
Drawing Year
Pipeline Type
Nominal Diameter

(in) Approx. Length (ft)

Pipe Material
Exterior Coating
Contract R-1
1992
SEFM
60
1,900
PLRCPP
Cement mortar
Reclaimed
48
1,900
DIP
8mil polyethylene
Barrier
30
1,900
DIP
8mil polyethylene
Brine
16
1,900
HDPE
N/A
Contract R-2
1992
SEFM
60 & 48
110
WS&RCCP
Cement mortar
Contract R-4
1993
SEFM
60
12,600
PLRCPP
Cement mortar
Recycled
20
12,600
DIP
8mil polyethylene
Brine
18
12,600
HDPE
N/A
Contract R-5
1994
Reclaimed
36, 42
19,000
CML&C
Cement mortar
Barrier
30
2,500
CML&C
Cement mortar
Contract R-6
1994
Reclaimed
36
18,600
CML&C
Cement mortar
Contract R-7
1994
Reclaimed
12, 16
20,000
DIP
8mil polyethylene
Reclaimed
12
300
PVC
N/A
Contract R-8
1994
Reclaimed
42
15,600
CML&C
Cement mortar
Contract R-9A
1993
Reclaimed
24
2,750
DIP
8mil polyethylene
Contract R-9B
1993
Reclaimed
20
9,000
DIP
8mil polyethylene
Contract R-10
2001
Reclaimed
72
Unknown
HDPE
N/A
Reclaimed
72
Unknown
RCPP
Cement mortar
Contract R-11
1994
Reclaimed
6
29,500
PVC
N/A
Reclaimed
6
486
DIP
8mil polyethylene
Contract R-12
1994
Reclaimed
6
21,120
PVC
N/A
Reclaimed
6
234
DIP
8mil polyethylene
Contract R-16
1994
Reclaimed
42
7,000
WSP
Cement mortar
Contract R-17
1994
Reclaimed
30, 42
14,000
DIP
8mil polyethylene
Lateral IIIA (CSUDH Mainline)
2002
Reclaimed
24
6,500
WSP
Dielectric
Reclaimed
12
1,000
PVC
N/A
Lateral II (Victoria Lateral)
2002
Reclaimed
24, 30
6,000
WSP
Dielectric
Reclaimed
12
860
PVC
N/A
42 in. North Segment
1998
Reclaimed
42
19,143
WSP
Dielectric
Reclaimed
36
100
WSP
Dielectric
42 in. Middle Segment
1998
Reclaimed
42
12,247
WSP
Dielectric
42 in. South Segment
1998
Reclaimed
42
18,380
WSP
Dielectric
Mariposa Lateral
2010
Reclaimed
6
170
DIP
8mil polyethylene
Reclaimed
6
1,390
PVC
N/A
Lateral 6A (Madrona Lateral)
2004
Reclaimed
24
15,121
WS
Tape Wrapped
Lateral 10 (LA Southwest College Lateral)
2006
Reclaimed
6
520
DIP
8mil polyethylene
Reclaimed
6
971
PVC
N/A
Corporate Campus El Segundo Douglas St
2007
Reclaimed
6
4,562
DIP
8mil polyethylene
Imperial Ave Lateral
2009
Reclaimed
6
4,272
PVC
N/A
Reclaimed
6
140
DIP
8mil polyethylene
190th Street Corridor Extension
2003
Reclaimed
12
2,600
PVC
N/A
Reclaimed
8, 12
557
DIP
8mil polyethylene
CRWRP-12 in., 24 in., 30 in. Service Lines
1998
Reclaimed
12, 24, 30
11,540
DIP
8mil polyethylene
HSEPS Improvements
2017
SEFM
48, 60
152
WSP
Cement Mortar

Figure A shows map of CP testing stations and distribution system pipelines on the next page:

Figure A – CP Testing Stations and Distribution System Pipeline Map (Click this link to see web map with CP testing station locations and available details)

Request for Proposals – Professional Engineering Services Cathodic Protection System 2025 Survey

West Basin Municipal Water District

Project Background and Summary

From 2018 – 2023, West Basin developed an evaluation report and final design of its CP system. The construction of the final design was completed in February 2023. A sample cathodic protection system testing report has been provided as information only and the Consultant shall perform independent testing for anode output to calculate the remaining anode life as part of the Project scope of work. Test reports for all cathodic protection stations from 2022 and 2023 will be provided. The Consultant shall assume that the testing will be performed on all of “CP Test Stations With Anodes” called out in Table A.

The Consultant shall provide the following services:

1. General Coordination and Project Administration – The Consultant shall coordinate all efforts of the Project Team including representatives from West Basin, and other Project stakeholders. The Consultant shall facilitate regular Project progress meetings and provide regular updates on the project status and budget in consultation with West Basin.

2. Field Testing – The Consultant shall perform testing to measure the anode output for all CP test stations equipped with anodes and determine the remaining life of the anodes currently in use. The Consultant shall also identify any necessary repairs needed within the test stations. The Consultant shall include an allowance (refer to Section 2.2) within the proposal for as-needed repairs.

3. Technical Memorandum – Upon completion of the testing and system repairs, the Consultant shall prepare a draft and final technical memorandum (TM) detailing the remaining anode life for all CP test stations within West Basin’s cathodic protection system.

The Scope of Services is described in further detail in the following sections.

Task 1: General Coordination, Project Administration, and Planning

The Consultant shall coordinate all efforts of the Project Team as well as provide administrative and planning efforts for the Project. Aspects of this task include, at a minimum, the following:

1.1 At the commencement of the Project, the Consultant shall facilitate a “kick- off” meeting with West Basin to discuss the scope and parameters of the Project. The Consultant shall prepare and distribute a draft agenda in advance of the meeting for review and comment by West Basin. The Consultant shall prepare and distribute meeting minutes within three (3) business days of the meeting. The Consultant shall assume two (2) hours for the kick-off meeting.

1.2 The Consultant shall develop a baseline Critical Path Method (CPM) schedule in Microsoft Project (MSP) format detailing all phases and milestones of the Project work. The Baseline Schedule shall include all logic ties and constraints required to accurately depict the sequence of Project activities. The Baseline Schedule shall be presented at the kick-off meeting and shall reflect the milestones set forth by West Basin in the RFP.

1.3 The Consultant shall coordinate the efforts of the Project Team and Subconsultants (if any), monitor the schedule and budget, and administer the contract with West Basin.

1.4 The Consultant shall obtain and review previous cathodic protection test reports and other relevant information needed to complete the survey and report.

1.5 The Consultant shall submit invoices on a monthly basis with all supporting documentation in a format acceptable to West Basin. The Consultant’s invoices shall be broken down by the tasks included in the RFP.

Task 2: Field Testing

The Consultant shall perform field testing on all pipelines specified in Table A Testing shall be performed in accordance with the NACE Standards for Cathodic Protection in Underground Metallic Pipelines. Any traffic control required will be implemented by the consultant.

2.1 The Consultant shall measure the ON/OFF potentials and pipe-to-to soil potentials to calculate the remaining life of the anodes at each CP test station. The Consultant shall specify the proposed measurement and testing procedure(s) to calculate the remaining anode life in its proposal.

2.2 The Consultant shall include a $10,000 allowance in its proposal for minor repairs (e.g. frayed wires, loose screws, cracked lids, etc.) within the existing CP testing stations. This allowance shall not be used without express written direction from the District.

2.3 The Consultant shall work with West Basin to develop a field survey template for future surveys. The data collected from testing conducted in 2022 and 2023 will be used to track the performance of the cathodic protection including the life of the anodes. The field survey report should include data as provided in this template document.

2.4 Task 3: Technical Memorandum

Upon completion of the testing and system repairs, the Consultant shall prepare a technical memorandum (TM) detailing the test data, interpretation of results and additional considerations for needed repairs of West Basin’s cathodic protection system.

3.1 The TM shall provide a summary of deficiencies discovered that refer to test procedures, test results, and analysis for all testing performed. The deficiencies shall also identify cathodic protection systems that are not functional, or not functioning properly, and a description of the issue with the recommended repair. The summary shall include class IV cost estimates (per the Association of Advancement of Cost Engineering) to implement the recommended repairs. The Consultant shall work with West Basin to develop a digital dashboard to analyze testing results that will aid West Basin in tracking cathodic protection of its recycled water distribution system into the future.

3.2 The Consultant shall participate in one (1) 2-hour workshop to (a) present the draft TM to West Basin and (b) discuss the review comments provided by West Basin prior to finalizing the TM. All comments provided by West Basin shall be tabulated and formally acknowledged and/or addressed in the final TM submittal. The Consultant shall include provisions in its proposal to prepare a draft and final TM.