Cathodic Protection Scope.docx
DOCX document 68 KB Posted
- Attached to
- VR25047 Cathodic Protection Repair
- Solicitation number
- 2140502
- Issued by
- Chautauqua County, New York
About this file
This is a Scope of Work document for the New York State Office for People with Developmental Disabilities (OPWDD) Broome Developmental Disabilities Services Office (DDSO) soliciting quotes for repair or replacement of cathodic protection on the heating water system at Valley Ridge Community Integration and Treatment (CIT) facility located at 276 County Road 46, Norwich, New York. The project involves evaluation and restoration of the cathodic protection system to ensure proper functionality and longevity of the heating water infrastructure. A mandatory site visit is required on November 9, 2026 at 9:00 AM at the project location for all vendors seeking consideration. Quotes must be submitted using the Official Bid Form to brm.bids@opwdd.ny.gov no later than 5:00 PM on November 16, 2026. The contract term is 60 days from the date of award, with the project located in Chenango County, New York.
This Request for Quotes (RFQ) is a public works project requiring all vendors and subcontractors to be registered with the New York State Department of Labor and to pay prevailing wages as mandated. The OPWDD Broome DDSO intends to award the contract to the most responsible and responsive vendor offering the lowest cost that meets all scope of work requirements, with the right to reject all quotes. The awarded vendor must submit certificates of Liability Insurance and Worker's Compensation Insurance, completed Lobbying Law Forms, and a signed Appendix A prior to contract execution. Vendors must adhere to all timeframes outlined in the scope of work, and the OPWDD reserves the right to make no concessions for vendor misunderstandings or misrepresentations regarding project specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BRM RFQ Form 25-27.docx | DOCX document | |
| 26.09.01 Repair and Replace Cathodic Protection Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
Facility:
Valley Ridge CIT Facility Address:
276 County Rd. 46 Norwich NY
Point of Contact:
Kevin Collins Maintenance Supervisor 2 Contact Phone Number:
(646) 544-1344
Project Title:
Cathodic Protection Repair Summary of Work:
Repair and Replace the Cathodic Protection
DESCRIPTION:
Cathodic Protection Repair. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to this scope of work and architectural drawings if supplied. Upon completion of Cathodic Protection Repair, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the Maintenance Supervisor.
SCOPE OF WORK:
The Contractor will perform the following work(s) per the attached drawings and this scope.
Repair and replacement of sacrificial magnesium cathodic protection anodes that have exceeded their lifespan. The existing anodes protect pre-fabricated Perma-Pipe service pipes that extend from the main facility to each housing unit and return to the main facility. These anodes have been tested and determined to be inadequate for providing sufficient protection and require replacement.
Contractor shall warrantee work for a period of one year from date of payment for job. Warrantee shall be for parts and labor.
Work shall conform to all applicable codes, be done according to manufacturer’s instructions, and follow industry best practices.
Underground utility locations provided are approximate and must be verified in the field by the contractor. The contractor is responsible for locating utilities within the project corridor before starting construction. Any damage to underground utilities resulting from construction activities must be repaired at no extra cost to the owner.
1. ELECTRICAL ISOLATION
1.1. Cathodic protection system warning: An electrical short to another metallic piping system or structure is the main reason a cathodic protection system may fail to meet design specifications. It is essential to ensure complete electrical isolation of the new cathodically protected system from other piping systems and metallic structures to prevent electrical shorting.
1.2. Ensure that anodes do not come into contact with any underground structures.
2. INSTALLATION
2.1. The installer is responsible for the installation of the cathodic protection system in accordance with the requirements outlined in these drawings.
2.2. A technician certified at CP-2 or higher is required to supervise the installation of cathodic protection and conduct acceptance testing of the installation to ensure the system performs properly.
3. ANODE INSTALLATION
3.1. Anodes must be correctly positioned and connected to the conduit/containment system at the locations indicated in these drawings.
3.2. Cathodic Protection system warning- An electrical short to another metallic Piping system or structure is the primary cause of a Cathodic protection system not meeting design requirements.
3.3. Anodes may be shipped in either a cloth bag or a cardboard box configuration. Please follow the manufacturer's instructions during installation.
3.3.1. If using cloth bag anodes, the shipping bag must be removed before installation. The cloth bag containing the anode and backfill should remain intact.
3.3.2. If utilizing cardboard box anodes, the complete assembly, including the cardboard box, must remain intact.
3.4. Do not handle anodes by the lead wire. Do not drop the anode or attempt to lower the anode using the lead wire.
3.5. Anodes should be installed:
3.5.1. minimum of 3 feet below ground level.
3.5.2. With the top of the anode at or below the centerline of the conduit/containment.
3.5.3. A minimum of 3 feet to the side of the conduit/containment.
3.5.4. In either a vertical or horizontal position.
3.5.5. Free from any underground structure.
3.5.6. Anodes must be positioned at equal intervals along the length of the conduit or containment.
3.5.7. Anodes should be soaked in water before backfilling. Well-compacted native soil should be screened and utilized for backfilling around the anodes. Sand should not be used as backfill around the anodes.
4. WIRING INSTALLATION
4.1. Leave slack in all anode lead wires and anode header wires to facilitate movement and settling of the conduit, containment, and soil during backfill and over time.
4.2. At test stations, a minimum slack of 6 inches is required for all wires.
4.3. All underground wire splices must be resistant to water and moisture.
4.4. Physical damage to wire insulation should be prevented. All wiring must be protected against water and moisture. If damage to wire insulation occurs, repair the affected area by wrapping it with two layers of rubber insulating tape followed by one layer of plastic electrical tape.
5. TESTING
5.1. A cathodic structure-to-electrolyte potential of at least -0.850 V or more negative must be tested and confirmed following the installation of all cathodic protection anodes.
5.2. A minimum negative (cathodic) polarization voltage shift of 100 mV must be measured between the structure surface and a stable reference electrode in contact with the electrolyte.
5.3. Please refer to Corrtech Report 17754-LTR-01-1 for test results related to the existing sacrificial anodes and isolation joints along the piping network.
6. PROJECT COMPLETION
6.1. Work areas should be filled in and verified to ensure that no large rocks or debris are left exposed.
6.2. The ground surface must be replaced to match its original form.
6.3. Upon completion, the affected areas should be restored using the original ground material.
7. VALLEY RIDGE REQUIREMENTS
7.1. No open trenches or holes can be left open and unattended. They must be covered at the end of each workday.
7.2. Finished grades should be compacted, covered with at least 4 inches of topsoil, and should not contain stones larger than 1 inch.
7.3. All tools and equipment must be secured and attended to at all times.
GENERAL REQUIREMENTS:
0. All Bidders must have DOL Article 8 Certification Prior to bidding, per NYS Labor Law 220-i. Effective December 30, 2024.
0. Virtual participation is acceptable; however, the party present must ensure that it is conducted in such a way as not to disturb attendees physically present. Absolutely no recording will be permitted, only a live-stream in which the party present is responsible for retaining all information presented during the site visit. Details will not be repeated nor will extra time on site be permitted due to any technical limitations imposed by virtual participation. Under no circumstance shall any OPWDD staff or individuals be filmed during these virtual site visits.
0. Bid price is to include all materials, labor, disposal of materials fees, third party inspections, and site clean-up. Vendor must demonstrate a track record of completing job or otherwise show that they are competent to do the job in order to be awarded the work.
0. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. Failure to complete the job satisfactorily will impact a vendor’s ability to bid on future OPWDD jobs.
0. Press style fittings are not allowed on any OPWDD gas piping.
0. Push to Connect plumbing fittings are not allowed to be used on OPWDD facilities or homes. Standard “Fernco” type couplings are not allowed, you must use one with a full metal sleeve such as “Pro-Flex” type.
0. OPWDD is a self-permitting agency per 19 NYCRR, Section 1201.2(d)(1). As such most required inspections are performed by state employees. But where the work being done requires third party inspection (such as electrical work) hiring and paying for the third-party inspector shall be the responsibility of the vendor. In the case of inspections to be performed by the State, Contractor shall notify the inspector at least two working days in advance of when the inspections are needed. If there are any questions about what inspections are required for this job, discussed with the point of contact listed above. Job shall not be considered complete until proof of all required inspections is provided by vendor.
0. This is a NYS Public Works project, and prevailing wages are to be paid.
0. Quote shall include a start time expressed in days post issuance of a PO.
Work is to be done between the hours of 7AM and 7PM, Monday through Friday unless otherwise arraigned with Maintenance Supervisor in advance.
Work must be completed within 60 days of receiving the purchase order. Jobs outstanding past the 60-day period will cause bids on other Broome DDSOO jobs to be rejected until the backlog is resolved. Exceptions will be made for those jobs whether vendor can demonstrate to OPWDD that the delay is due to supply chain issues or issues that are the responsibility of OPWDD.
All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday in a manner acceptable to Maintenance Supervisor/Safety Department.
Any unforeseen conditions that may alter the established price are to be reported to the Facility Contact listed above immediately upon discovery.
Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.
At least one week prior to the commencement of the work, there shall be a meeting with local OPWDD Office of Property Supports and Emergency Services staff to discuss specific safety requirements needed to be adhered to during the work period and to review and sign the work safety plan.
Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. No suspected/possible ACM materials shall be disturbed unless there is a written testing report showing that it is clean.
Lawn Damage/Property Damage: If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn. Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job. Please protect Curbs & Sidewalks.
Continuity of Work/Communication/Scheduling: Once the job has begun, it is to be worked on continuously until completed. If there are any delays, even if due to inclement weather, a Work Control Representative MUST be contacted.
Deliveries: No deliveries shall be received by OPWDD. If you plan to have deliveries made to the Campus, you must be here to receive them, or they will be turned away by OPWDD.
Facility Safety: The Facility will be occupied during the job. For this reason, the contractor must take all reasonable care to safeguard building occupants. At no time can any exhaust or appliance vent outlet or air inlet be blocked without shutting off that equipment. If you create a Carbon Monoxide event in an occupied house because you fail to properly plan for your work, you will be financially responsible for all responding agencies and staff invoices and costs. The contractor shall ensure all tools, materials and other items are picked up, removed, or stored and are safely secured at the end of each workday. Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the Maintenance Supervisor at the end of the day. Vehicles should remain locked when unattended. Exterior doors are not to be propped open and left unattended. The work as indicated above shall be scheduled as not to interfered with other functions of the facility unless arranged and approved at least one week in advance.
All work performed as part of this job is to be coordinated with the Facility Contact listed above.
SITE VISIT
The site visit is mandatory, if you do not attend this visit your bid will not be accepted.
A site visit is required on November 9th, 2026 at 9:00 am.
image1.emf
File details come from the government source that posted it. Updated .