Casey Launder Covers _ ADDENDUM 3.pdf
PDF 756 KB Posted
- Solicitation number
- PE-63125-NONST-2024-000000018
- Issued by
- Clayton County, Henry County, Georgia
About this file
This document is an Addendum for a state and local contract opportunity issued by the Clayton County Water Authority (CCWA) in Georgia. The opportunity is for the W.B. Casey WRRF and Shoal Creek WRF Secondary Launder Covers project, with Bid Number 2024-WR-17 and a bid opening date of Tuesday, July 2, 2024 at 2:00 p.m. local time. The addendum addresses questions from potential bidders, including requirements around the scum baffle, cover materials, installation timelines, and other details. A mandatory site visit was held on June 19, 2024, and a plan holders list is provided.
The contract does not specify pricing terms or set-asides, but it does state that CCWA encourages Small Local, Minority, and Women-Owned businesses to participate. The contract is for the installation of secondary launder covers at the W.B. Casey WRRF and Shoal Creek WRF facilities, but no additional details on quantities, contract term, or funding sources are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Casey Launder Covers _ ADDENDUM 2.pdf | ||
| Casey Launder Covers _ ADDENDUM 1.pdf | ||
| Casey and Shoal Creek WRF Secondary Launder C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1600 Battle Creek Road, Morrow, GA 30260
W.B. Casey WRRF and Shoal Creek WRF Secondary Launder Covers
ADDENDUM # 3
DATE Wednesday, June 26, 2024
BID NUMBER 2024-WR-17
BID OPENING DATE Tuesday, July 2, 2024 at 2:00 p.m. local time
ADDENDUM MUST BE SIGNED AND INCLUDED IN YOUR RESPONSE TO THE RFB.
QUESTIONS:
1. I have received addendum 2 but never received addendum 1 and found out during the pre-bid meeting that the site visit date and time was changed. Can you schedule another site visit? I was not the only one who did not receive the first addendum.
Answer: Addendum 1 was posted on June 5, 2024 on the Georgia Procurement Registry, Vendor Registry, and our website, at www.ccwa.us. Regretfully, an additional site visit will not be arranged prior to the Bid Opening scheduled at 2:00 p.m. on Tuesday, July 2, 2024.
2. Does Clayton Co. absolutely REQUIRE the section from the scum baffle to the inner-most wall to be covered?
Answer: The entire area must be covered.
a. If yes, then please be aware that the scum baffle scraper will need to be removed to permit coverage of this section.
Answer: Scum baffle must not be removed.
b. If yes, then can anything “rest on”, or “be mounted to” the scum baffle, with the understanding that there is almost zero load on the scum baffle.
Answer: Nothing can be mounted.
c. If not, will a vertical “plate” in front of the weir be acceptable to block sun from the weir?
Answer: Possibly a drop plate.
d. Or do they even need anything at all?
Answer: Something is needed.
3. What is the minimum distance from the top of the outer wall to the sidewalk?
Answer: No modification will be accepted.
https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-63125-NONST-2024-000000018&sourceSystemType=gpr20 https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-63125-NONST-2024-000000018&sourceSystemType=gpr20 https://vrapp.vendorregistry.com/Bids/View/Bid/6350df4b-ea03-41e4-9997-16b1c73d0643 http://www.ccwa.us/
Secondary Launder Covers
ADDENDUM # 3
DATE Wednesday, June 26, 2024
BID NUMBER 2024-WR-17
4. Can the steps be raised / modified for additional clearance to accommodate our tensioning ratchets?
Answer: No modification will be accepted.
5. Can they relocate the spray nozzles if we need them to?
Answer: No relocation of spray nozzle.
6. Due to the complexity involved in the design of the Shoal Creek Covers they will take longer to install. We request that the installation time given be increased form 30-45 days. Please let us know if this is acceptable?
Answer: 30 days for Shoal Creek WRF.
7. Being the Addendum 2 specifies maintenance free, can you specify the material to fiberglass or stainless-steel construction since these materials meet that standard?
Answer: Any material is accepted.
8. For the Shoal Creek WRF, Can you specify the width of the covers?
Answer: Any width that fits will be accepted.
9. Would it be possible to get a copy of the sign-in sheet from yesterday’s site visit at the W.B. Casey WRRF?
Answer: A copy of the Mandatory Site Visit Sign-In-Sheet is provided on page 4 of this Addendum.
10. Do you have a list of plan holders/pre-bid meeting attendees for the project mentioned above? If so, can I have a copy sent to my email?
Answer: A plan holders list is provided on page 5 of this Addendum.
11. Is there a structural print showing launder width and weir wall thickness on the WB Casey tanks?
Answer: Refer to the drawings provided with the RFB documents.
http://www.ccwa.us/wp-content/uploads/2024/05/Casey-and-Shoal-Creek-WRF-Secondary-Launder-Covers-RFB-051024.pdf
Secondary Launder Covers
ADDENDUM # 3
DATE Wednesday, June 26, 2024
BID NUMBER 2024-WR-17
12. Please verify Div 4 Sec 2.2.B is a typo and it is ‘each cover’ rather than ‘each basin’.
Answer: There is no external odor control.
13. Please verify Div 4 Sec 2.2.E reference to odor control - whether this is part of an active scrubber system.
Answer: Odor will be contained within covering.
Acknowledgment of receipt of this addendum must be signed and included in your bid response.
COMPANY NAME
SIGNATURE
DATE
Secondary Launder Covers
ADDENDUM # 3
DATE Wednesday, June 26, 2024
BID NUMBER 2024-WR-17
Secondary Launder Covers
ADDENDUM # 3
DATE Wednesday, June 26, 2024
BID NUMBER 2024-WR-17
W.B. Casey WRRF and Shoal Creek WRF Secondary Launder Covers Vendor List
Company Representative Phone Email
Construct Connect June Calago 323.602.5079 X 51076 June.Calago@ConstructConnect.com
Cornerstone Mechanical Andy Bramlett (770) 742-3321 andy@cornerstone-mechanical.com
Eco-Tech, Inc. D. Scott Cockrell Tori West SCockrell@eco-tech.net; Twest@eco-tech.net
Environmental Instrumentation and Calibration Inc. Josh Godbee (478)-278-2659 joshgodbee@eicworks.com
Good Lord's Mobile Welding Service, LLC Carl Lomax 661-302-6128 carl_lomax@yahoo.com
Heyward Incorporated Atlanta (770) 286-1505 Ethan.Russo@heywardatlanta.com
IHC Construction Companies, LLC Pieter Nielsen Ben Frank Kulling 404-497-7619 pnielsen@ihcconstruction.com;
nkulling@ihcconstruction.com
Industrial and Environmental Concepts- Michael Lever 952-829-0731 mlever@ieccovers.com
NEFCO 561-775-9303 sales@nefco.us
NovaTech Sandy Jenkins 315-813-7887 sjenkins@novatechnologiesgrp.com
Principle Environmental Inc. Mary Watson 770.952.9444 marywatson@principleenvironmental.com
Protectolite Composites Inc Charles Tomlinson 903.570.3459 ctomlinson@protectolite.com
Razorback LLC Kayla Kivinski 727.938.9500 kayla@razorbackllc.com
Sol Construction Muzafar Thameem 949-985-7016 mthameem@solconstructionllc.com
Southern Water Technologies Ben Frank 256-686-2682 ben@southernwater.com
Templeton & Associates Engineering Sales Jordan Longoria 470-345-4012 Jordan@templeton-associates.com
The TDH Company Allison Kulp 770-509-1808 akulp@tdhco.com
Utility Service Co., Inc. Lisa Franklin 478.988.5266 bid@usgwater.com
Warminster Fiberglass- Bert Gardner 770-356-8722 bert@southernwater.com
Waste Water Industrial Solutions Virginia Murphy vmurphy@wwisllc.com
WesTech Clint Curl 770-509-1808 ccurl@tdhco.com mailto:June.Calago@ConstructConnect.com mailto:andy@cornerstone-mechanical.com mailto:SCockrell@eco-tech.net mailto:SCockrell@eco-tech.net mailto:joshgodbee@eicworks.com mailto:carl_lomax@yahoo.com mailto:Ethan.Russo@heywardatlanta.com mailto:jarevalo@ihcconstruction.com mailto:jarevalo@ihcconstruction.com mailto:sales@nefco.us mailto:sjenkins@novatechnologiesgrp.com mailto:marywatson@principleenvironmental.com mailto:ctomlinson@protectolite.com mailto:kayla@razorbackllc.com mailto:mthameem@solconstructionllc.com mailto:ben@southernwater.com mailto:Jordan@templeton-associates.com mailto:akulp@tdhco.com mailto:bid@usgwater.com mailto:bert@southernwater.com mailto:vmurphy@wwisllc.com mailto:ccurl@tdhco.com