Cascade Locks Fire Station Solar Plus Storage Microgrid DesignBuild Request for Proposals.pdf
PDF 8 MB Posted
- Solicitation number
- S-X33157-00017870
- Issued by
- Oregon
About this file
This is a Design/Build Request for Proposals (RFP) issued by the City of Cascade Locks, Oregon, for the design, procurement, and construction of a solar photovoltaic system with battery energy storage and microgrid controls at Cascade Locks Fire Station. The project requires installation of a minimum 64 kW DC (51 kW AC) solar PV system, a 125 kW / 110 kWh battery energy storage system, microgrid controls with automatic islanding capability, electrical infrastructure upgrades, and interconnection with Cascade Locks City Light. The RFP was issued on August 31, 2026, with an optional site visit scheduled for September 16, 2026, a questions deadline of September 21, 2026, and a proposal submission deadline of 5:00 p.m. on October 1, 2026. Contract negotiation is anticipated for October 19-21, 2026, with contract award on October 26, 2026, and a tentative kickoff meeting November 2-5, 2026. Construction must begin before April 3, 2027, and be completed by April 3, 2028, with substantial completion required by February 3, 2028.
The anticipated project budget ranges from $612,000 to $654,000, representing a firm fixed price for complete design-build services. Funding is authorized by the City and includes grant funding from the Oregon Department of Energy. Payment is structured in three milestones: up to 30% upon contract execution and project initiation; up to 30% upon procurement of major components and receipt of construction permits; and the remaining balance upon final completion, testing, commissioning, and closeout. The project is subject to Oregon's prevailing wage requirements as of July 5, 2026, and requires the contractor to file a $30,000 public works bond and maintain performance and payment bonds equal to 100% of the contract value. The contractor must be registered with the Oregon Construction Contractors Board, comply with all state and local codes including the 2025 Oregon Structural Specialty Code, and provide comprehensive warranties including a minimum five-year workmanship guarantee, 25-year power guarantee for solar panels, and 10-year inverter warranty. The selected contractor will also be responsible for developing an operations and maintenance manual and providing training to City and fire department staff.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN/BUILD
PUBLIC IMPROVEMENT CONTRACT
REQUEST FOR PROPOSAL (RFP)
Cascade Locks Fire Station Solar + Storage Energy System Construction
Issued By: City of Cascade Locks, 140 SW WaNaPa, Cascade Locks, OR 97014
Point of Contact (POC): Lindsay McClure, Mid-Columbia Economic Development District (MCEDD) Energy
& Project Manager, lindsay@mcedd.org
Issue Date: August 31, 2026
Optional Site Visit: September 16, 2026
Questions Deadline: September 21, 2026
Response Date: October 1, 2026
The City of Cascade Locks is issuing this Request for Proposals (RFP) pursuant to its authority under Oregon state law. The City is using the Request for Proposals method of procurement, pursuant to ORS 279C.365 and OAR 137-049-0100 et seq.
Proposers shall direct all communications related to any provision of the RFP, whether about the technical requirements of the RFP, contractual requirements, the RFP process, or any other provision only to the Point of Contact (POC) identified in this RFP.
No proposal will be considered unless fully completed in the manner provided in the packet. Proposals will not be accepted after the stated due date and time. Any proposal received after closing time will not be considered.
The City may reject any proposal not in compliance with this RFP or not in compliance with public proposal submission procedures at its sole discretion.
Proposers must register with the City of Cascade Locks by providing an email address to the POC above to receive answers to questions sent in the form of addendums. Acknowledgment of receipt of all addendums is a requirement of proposal submission.
PUBLISHED State of Oregon – OregonBuys Platform City of Cascade Locks’ website
Columbia Gorge News
TABLE OF CONTENTS
Introduction 3
Scope of Work 3
Submittal Instructions 7
Proposal Content and Format 10
Proposal Evaluation and Contract Award Procedures 14
Appendix A: Business Statement 16
Appendix B: Acknowledgement of Addenda 17
Appendix C: Design Build Public Improvement Contract 18
Appendix D: Cascade Locks Fire Station – Feasibility Report 80
Section 1 Introduction
Project summary The City of Cascade Locks (City) has issued this Request for Proposals (RFP) to obtain firm fixed price proposals for full-scope design-build services for a solar plus storage microgrid. The goal of this project is to construct a resilient on-site solar plus storage system to support facility operations during a power outage and offset operating costs.
The system must provide power to the larger grid system when operating under everyday circumstances. When required, due to an emergency event, the system must island itself from the grid system and continue to provide power to the location. Funding for the complete scope has been authorized by the City and includes grant funding from Oregon Department of Energy.
Ownership model The microgrid will be located at Cascade Locks Fire Station (CLFS). The City will own the system from its construction.
The City will select a solar energy developer and enter into a contract. The City will enter into a long-term project operations and maintenance (“O&M”) contract with either the Proposer or a third-party provider of solar O&M services. This long-term project O&M contract will be negotiated through a separate contracting process.
Background Hood River County is susceptible to an array of hazards including fires, ice storms, earthquakes, high temperatures, and high winds that are increasing in frequency and severity. These events commonly correspond with power outages, which amplify threats to health, safety, and other essential services by disrupting community lifelines. Cascade Locks Fire Station was identified by the City of Cascade Locks and Hood River County Emergency Management as a critical facility that supports key community lifelines.
CLFS is the emergency response hub for the City and the surrounding area. The building functions as the incident command post for large area-wide emergencies, such as the 2017 Eagle Creek Fire. Cascade Locks Fire and EMS staff are the only personnel in the City that are able to provide emergency medical care, as the closest hospital is 19 miles away, in Hood River, OR, along Interstate 84, which is often closed during inclement weather events.
Section 2 Scope of Work
Project Description The scope of the project engineering, procurement, and construction contract shall include all components and tasks that are necessary to design, build, and deploy a turn-key microgrid system that meets the City’s goals, objectives, and requirements. A conceptual design that was created by AES is included in Appendix D: ‘Cascade Locks Fire Station –Feasibility Report’. This report provides some background information about the site but doesn’t reflect the exact design or components that should be used.
Project Budget Range The anticipated budget for this contract is between $612,000 - $654,000.
Project Location The project will be located at the following location:
Cascade Locks Fire Station 25 Wa Na Pa St.
Cascade Locks, OR
45.67290707355843, -121.88419229998695
Project Schedule Construction must begin before April 3, 2027, and must be completed by April 3, 2028.
Project Objectives:
I. Install solar photovoltaic (PV) system II. Install battery energy storage system (BESS) III. Install and integrate microgrid controls, DER controls, and load controls IV. Complete electrical infrastructure reconfiguration and upgrades V. Interconnect, test, permit, and commission microgrid
Further detail on each objective is provided in the following sections.
I. Install solar photovoltaic (PV) system
The Proposer shall complete all tasks necessary to design, engineer, install, and deploy a new solar PV system that is a minimum of 64 kW DC (51 kW AC).
The Proposer shall be responsible for all aspects of design, engineering, permitting, interconnection, procurement, installation, commissioning, deployment, etc. for this PV system, incorporating preliminary design provided by the City.
II. Install battery energy storage system (BESS)
Battery energy storage capacity shall be the primary grid-forming resource. Assuming optimal BESS state of charge (SoC) at the outset of microgrid islanding, as well as application of appropriate load-control protocols, storage resources will be specified to provide power and energy capacity of approximately 125 kW / 110 kWh.
The Proposer shall be responsible for all aspects of design, engineering, permitting, interconnection, procurement, installation, commissioning, and deployment of this BESS.
III. Install and integrate microgrid controls, DER controls, and load controls
The Proposer shall complete all tasks necessary to design, engineer, install, and configure all communications, telemetry, controls, and human interfaces required to manage and execute all microgrid functions. The microgrid controls and resources shall be integrated to support automatic islanding of the microgrid during grid outages, including integration of onsite DERs (both electric supply and controllable loads).
Preferred control solutions will be capable of automatically managing a seamless transition between grid-connected and islanded states, assuming sufficient onsite power at the time of an outage, with no loss of electricity at any of the facilities served by the microgrid.
The Proposer scope shall include developing secure communication and control protocols and human operator interface systems for monitoring and managing all microgrid subsystems. The Proposer scope shall include producing a Microgrid System Integration and Control Manual (the “Microgrid Control Manual”), describing the microgrid control systems, subsystems (e.g., DER and load management controls), and human interface systems, how they are integrated for interoperation, and all onsite user control and data retrieval processes.
IV. Complete electrical infrastructure reconfiguration and upgrades
Currently, the system is served by Cascade Locks City Light. The proposed budget must include costs related to onsite distribution and interconnection.
The Proposer scope of responsibility shall include all interconnection, protection, and safety systems, including microgrid-integrated automatic transfer switch (ATS) and other switching systems as required to support stable transitions to and from island-mode operations. Preferred systems will support seamless transitions and automatic resynchronization and reconnection to the utility distribution system when utility power is restored.
The Proposer shall be responsible for all aspects of design, engineering, permitting, procurement, installation, and commissioning for microgrid infrastructure, including all required electrical and communications cables and other electrical infrastructure.
V. Interconnect, test, commission, and provide usage documentation for microgrid
The Proposer shall coordinate and perform all tasks required to obtain interconnection approval from Cascade Locks City Light, install and test interconnection protection and control systems, verify the safety and code compliance of installed systems, test and validate the system’s performance, and commission the system for ongoing operations.
Proposers shall provide a site-plan with their proposal, which shows the location of the solar PV array(s), inverter(s), point of interconnection (POI) and the electric service location on the property, along with the route of conductors for interconnection per utility application requirements.
Commissioning shall include providing a complete operations and maintenance (O&M) manual, and training to enable City and Cascade Locks Fire and EMS staff to perform required operational tasks and routine maintenance.
Warranties, Performance Standards, and Performance Guarantees The Proposal shall include the following:
• A minimum one-year production guarantee: Proposer shall guarantee a minimum annual energy output (e.g., 76,891 kWh), weather-adjusted using a standard Performance Ratio.
• BESS capacity & efficiency guarantee:
o Capacity: Guarantee the BESS delivers 440 kWh of usable energy at the time of substantial completion (verified by a full discharge test).
o Efficiency: Guarantee a Round-Trip Efficiency (RTE) of no less than 85%.
o System Availability (Uptime): Guarantee the system is online and available 98% of the year.
• Resilience verification: Final acceptance is contingent upon a successful full-load islanding test where the system carries the building's critical loads for a minimum of 2 hours without grid support.
• Warranty for the installed system:
o A minimum 5-year workmanship guarantee o A minimum 25-year power guarantee that ensures that panels produce at least
80% of their original rating for 25 years o A minimum 10-year inverter warranty o Manufacturer warranty of all supplied and installed equipment
Section 3 Technology and Equipment Standards
State Standards The Proposer shall follow all required standards provided by the State, including the statewide building codes under 2025 Oregon Structural Specialty Code. All work and products must conform to state standards.
PV Modules PV modules shall be commercial off-the-shelf products that conform to the UL 61730-1 / UL 61730-2 standards.
PV modules shall have a 25-year limited warranty that modules will generate no less than 80% of rated output under standard testing conditions (STC). PV modules that do not satisfy this warranty condition within the Performance Guarantee period shall be replaced.
Inverters Inverters shall be commercial off-the-shelf products that conform to the UL 1741 and IEEE 1547 standards.
Note: Different utilities have different requirements for the inverters and other technologies that can be used and connected to the grid. Proposer will communicate with Cascade Locks City Light to understand all pertinent information required to install compliant equipment.
The inverter shall have at a minimum the following features:
• UL/ETL listed
• Peak efficiency of 96% or higher
• Inverter shall have operational indicators of performance and have built-in data acquisition and remote monitoring
• The inverter shall be capable of parallel operation with the existing AC power. Each inverter shall automatically synchronize its output waveform with that of the Electric Distribution Company upon restoration of power.
Battery Energy Storage System The BESS must comply with all standards relevant to the operation and installation of energy storage equipment by UL 9540 and other applicable codes and standards.
Racking Racking systems shall be designed and implemented to conform to the UL 2703 standard.
Monitoring system The system shall include a web-based monitoring system showing system performance that can be accessed by the City. Data shall be available both in real time and historical data.
The Proposer shall provide networking equipment, engineering, programming, wiring, and software to allow remote connection to the City’s local area network.
Section 4 Submittal Instructions
Solicitation Timeline
August 31, 2026 Advertisement and Release of RFP September 16, 2026, at 10 a.m. Optional Site Visit September 21, 2026, at 5 p.m. Deadline for Questions September 25, 2026, by 5 p.m. Answers to Questions issued as RFP addendum October 1, 2026, by 5 p.m. Deadline for Submission of Proposals
October 19-21, 2026 Negotiation of Contract October 26, 2026 Award of Contract November 2-5, 2026 Tentative Kickoff Meeting
1. General By submitting a proposal, the Proposer certifies that the proposal has been arrived at independently and submitted without any collusion designed to limit competition. The City retains sole discretion in determining the award of an Agreement and reserves the right to reject all Proposals. The City also reserves the right to change, cancel, or reissue this RFP at any time.
Furthermore, the RFP does not obligate the City to accept or contract for any expressed or implied services. The successful Proposer must comply with local, state, and federal requirements regarding equal opportunity and employment practices.
The successful Proposer must complete this RFP in full to be considered and be qualified to conduct business in the State of Oregon.
2. Site Visit A voluntary site visit for prospective Proposers is scheduled for 10 a.m. on Wednesday, September 16, 2026. All interested Proposers will meet at Cascade Locks Fire Station for a walk through the system site. Statements made by City representatives or the project manager at the site visit do not change the Solicitation Document unless the City confirms such statements with a written Addendum to the Solicitation Document.
3. Proposal Submittal The proposal and all amendments must be signed and submitted no later than 5:00 p.m. local time, Thursday, October 1, 2026, to the email address below.
All proposals should be single-spaced in no less than 11-point font with no less than 1" margins in an electronic format that permits faithful reproduction and printing, such as in PDF format, and submitted to the following address: lindsay@mcedd.org. Proposals sent by mail or facsimile will not be accepted.
Proposals will be opened at the bid submission deadline. Proposals submitted after the designated time or to an incorrect e-mail address will not be considered in the selection process.
All submissions are considered public documents unless there is data or information that is confidential due to its proprietary nature. Contractors must identify specifically those portions of their proposal that are confidential, if any, or contain confidential information. Any data or information considered confidential must be clearly marked “Confidential” and provided to the extent possible in a separate file and clearly marked in the file name that the contents are confidential.
Proposals may be modified or withdrawn by writing to the same e-mail address provided as the submission addresses prior to the Proposal Due Date. After the Proposal Due Date, no modifications will be permitted. Contractors may withdraw a proposal after the Proposal Due
Date only upon submittal of a formal written notice to MCEDD Energy & Project Manager Lindsay McClure at the submission e-mail address provided. Withdrawal of any proposal is immediately final, and Contractor will be disqualified from the performance of any work related to the Project.
The proposal, to be considered a valid proposal, must be signed by a principal officer or owner of the business entity that is submitting the proposal. Such a signature constitutes the Proposer’s representation that it has read, understood and fully accepted every provision of this RFP unless an exception is described above.
4. Protests Potential Proposers who believe that the RFP is unnecessarily restrictive or limits competition may submit a protest in writing to Lindsay McClure, MCEDD Energy & Project Manager. A protest shall include the reasons for the protest, the basis under the appropriate referenced sections of the OAR/ORS and suggested modifications that are believed to be necessary to remove the unnecessary restrictions to allow open competition. To be considered, a protest must be submitted within ten (10) calendar days of issuance of the RFP. MCEDD’s Energy & Project Manager shall respond to any protest and, if necessary, shall issue any appropriate revisions to the RFP and will post these revisions as an Addendum to the RFP.
If a protest is received in accordance with the section above, the proposal opening date may be extended, if necessary, to allow consideration of the protest and issuance of any necessary addenda to the proposal documents.
5. Proposal Submission and Signing All requested forms and attachments (Business Statement, Acknowledgment Addenda) must be submitted with the proposal and in the required format.
6. Cost of Preparing a Proposal The RFP does not commit the City to pay any costs incurred by the Proposer in the submission or presentation of a proposal or in making the necessary proposal for the preparation thereof.
7. Interpretations and Clarifications All questions regarding this RFP shall be directed to Lindsay McClure at lindsay@mcedd.org. If necessary, interpretations or clarifications in response to such questions will be made by issuance of an "Addendum" to all prospective Proposers within a reasonable time prior to proposal closing, but in no case less than 72 hours before the proposed closing. If an addendum is necessary after that time, the City, at its discretion, can extend the closing date.
Potential Proposers should register with the City to receive any issued addenda. Proposers can register by sending an e-mail indicating their interest in the solicitation to lindsay@mcedd.org.
Proposers should provide an e-mail address where addenda may be sent.
Addenda issued must be acknowledged by the recipient by submitting the filled out "Acknowledgment of Addenda" as a part of the proposal. Only information provided in Addenda will be binding upon the City.
8. City's Project Manager The City's Project Manager for this work will be Lindsay McClure, MCEDD Energy & Project Manager.
9. Proposal Validity Period Submitted proposals shall be valid and cannot be voluntarily withdrawn for a period of thirty (30) calendar days from the Proposal Opening Date.
10. Public Record All bid material submitted by the Proposer shall become the property of the City and is public record unless otherwise specified. A bid that contains any information that is considered a trade secret under ORS 192.501(2) should be segregated and clearly identified as such. This information will be kept confidential and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS 192. Confidential information or trade secrets cannot include any price information which has been submitted as a part of the proposal and open to public disclosure.
Section 5 Proposal Content and Format
A. Format To provide consistency in the review of the written proposals, firms are requested to prepare their proposals in the standard format specified below. All proposals should be single-spaced in no less than 11-point font with no less than 1" margins in an electronic format that permits faithful reproduction and printing, such as in PDF format, and submitted to the following address:
lindsay@mcedd.org. Proposals sent by mail or facsimile will not be accepted.
B. Title Page The Proposer should identify the RFP title, name, and title of the Proposer's contact person, address, telephone number, e-mail address, and submission date.
C. Transmittal Letter The transmittal letter should be no more than two (2) pages long and should include as a minimum the following:
1. A brief statement of the Proposer's understanding of the services to be performed;
2. Names of persons authorized to represent the Proposer, their title, email address, and telephone number (if different from the individual who signs the transmittal letter).
D. Table of Contents The table of contents should include a clear and complete identification by section and page number of the materials submitted.
E. Firm and Project Team Qualifications
1. Identification of the individuals comprising the team assigned to this contract and what specific role each will take in completing the work, including a description of their qualifications and proof of licensing. The City reserves the right to approve final project team members.
2. Names and qualifications of any outside consultants and associates that will be employed to assist on this project.
3. Your current and past experience as it relates to the Scope of Work, as defined under Section 2. Where applicable, include a list of similar engagements completed on behalf of other local government agencies. Sample work products, including reports, are encouraged.
4. Preference will be given to Proposers whose Project Team includes members with commercial microgrid installation experience.
F. Technical Details
1. Proposed Solar Installation Information
• Solar Modules
• Solar Inverters
• Racking System
• Other Hardware
• Web Based Monitoring System
• If available, please include cut sheets for all the above as exhibits
2. Proposed Battery Installation Information
• Battery Modules
• Other Hardware
3. Proposed System Design
• Recommended system size
• Recommended system locations for both modules and inverters
• Dimensions of the system and estimated required area
• Route to interconnect with existing system
• Please include electrical and site-plan drawings showing system design and layout and interconnection route
4. Proposed System Performance
• System output (kWh)
• Annual output de-rate factor
• Performance guarantee
• Please include copies of PVWatts, Helioscope, or other modeling software generation report
5. Proposed Project Construction Budget
• Attach an excel file with a detailed breakdown of costs
• Pricing for a turnkey, installed system in both $/W and dollars
6. Proposed Construction Schedule
• Provide a proposed project schedule that includes the major project milestones listed below. For each milestone, show the projected milestone completion date (expressed as number of weeks following contract execution). The Proposed Project Schedule is to include the following milestones:
o Contract execution o Final project design / Applications for interconnection and permits filed o Equipment ordered o Notice to Proceed with Construction o Mechanical completion o System commissioning o Permission to operate/ Place in service
7. Proposed Workmanship Guarantee and Operations and Maintenance Service Contract
• Proposed Workmanship Guarantee
• Proposed Operation and Maintenance Service Contract with the City of Cascade
Locks, which will be agreed to via a separate process.
G. Prevailing Wage This project meets the definition of a public works project as defined by ORS 279C.800(6)(a) and OAR 839-025-0004(25)(a) and is therefore subject to Oregon’s Prevailing Wage Law. No proposal will be received unless the proposal contains a statement that the proposer will comply with the requirements of ORS 279C.800 to 279C.870. Contractors must pay the applicable prevailing wage rate and comply with all Oregon Bureau of Labor and Industries “BOLI” requirements pursuant to Prevailing Wage Law, including all contracts and subcontracts and in filing separate work bonds with the Construction Contractor’s Board, unless exempt under ORS 279C.836 and OAR 839-025- 0015. This project will be subject to the July 5, 2026, BOLI Prevailing Wage Rates, available here:
https://www.oregon.gov/boli/employers/pages/prevailing-wage-rates.aspx
H. Professional Qualifications No proposal will be considered unless the proposer is registered with the Construction Contractors Board, as specified in OAR 137-049-0230, and is an Oregon licensed design professional or discloses that it is not an Oregon licensed design professional and identifies an Oregon licensed design professional(s) who will provide design services, as specified in OAR 137- 049-0670(5).
https://www.oregon.gov/boli/employers/pages/prevailing-wage-rates.aspx
I. Public Works Bond No proposal will be received unless the proposal contains a statement that the proposer, in accordance with ORS 279C.830(3) and before starting work on the Project, shall file a $30,000 Public Works Bond with the Oregon Construction Contractors Board. Contract will include a requirement in every subcontract which requires the subcontractor to file a $30,000 Public Works Bond with the Oregon Construction Contractors Board in accordance with ORS 279C(3)(b) and before starting work on the project.
J. Drug Testing Certification According to ORS 279C.505(2), the Proposer must demonstrate that it has established a drug-testing program for its employees.
K. Resident Bidder Bid must identify whether the bidder is a resident bidder as defined in ORS 279A.120.
L. First-Tier Subcontractor Disclosure According to ORS 279C.370, the Proposer must disclose the following information about any subcontract either in its Proposal submission or within four hours after RFP closing:
(1) The subcontractor's name,
(2) The category of work that the subcontractor would be performing, and
(3) The dollar value of the subcontract.
If the Proposer will not be using any subcontractors that are subject to the above disclosure requirements, the Proposer is required to indicate that in the Proposal.
M. Disputes Should any doubt or difference of opinion arise between the City and a Proposer as to the items to be furnished hereunder or the interpretation of this RFP’s provisions, the decision of the City shall be final and binding upon all parties.
N. City Personnel No officer, agent, consultant, or employee of the City shall be permitted any interest in the contract.
O. Completion of Attached Forms Please complete the following:
Appendix A: Business Statement Appendix B: Acknowledgement of addenda (if any) First-Tier Subcontractor Disclosure Form Public Works Bond Form Employee Drug Testing Certification Form
P. Acceptance of Contract Terms
The Proposer is responsible for knowing and understanding the terms and conditions included in or applicable to this RFP. By signing and submitting a Proposal, Proposer acknowledges acceptance of and agrees to be bound by the terms and conditions of the contract, as shown in Appendix C, attached hereto and incorporated herein by reference.
Section 6 Proposal Evaluation and Contract Award Procedures
A. Scoring Process
A selection committee will review the written proposals. Proposals will be evaluated to determine which best meets the City’s needs. Evaluations will be conducted in accordance with the following:
Evaluation Criteria Weight
Proposal submitted on time and complete Pass/Fail
Understanding of the Scope of Work and general approach to the project
30 pts
Experience with projects of similar complexity and function 25 pts
Cost competitiveness 15 pts
Equipment proposed 15 pts
Qualifications of the Proposer’s staff assigned to the project 15 pts
Total 100 pts
The City reserves the right to invite top Proposers to interview with the selection team. This will provide an opportunity to clarify or elaborate on the proposal. The project manager will schedule the time and location and notify the selected firms.
B. Inquiries of References The City reserves the right to investigate references and the past performance of any Proposer with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, its completion or delivery of a project on schedule, and its lawful payment of employees and workers.
C. Clarification of Proposals The City reserves the right to obtain clarification of any point regarding a proposal to obtain additional information necessary for evaluation. Failure of a Proposer to respond to such a request for additional information or clarification could result in their disqualification for selection.
D. Negotiations with Top Ranked Firm Upon reviewing the proposals submitted, the City will enter negotiations with the top-ranked firms. If the City and the top-ranked firm are unable after good faith negotiations to agree to a price, general system sizing and configuration, approach to the project, warranty, and performance guarantee terms, the City will move to the second-ranked firm and enter negotiations. The process shall repeat until either the City and a firm come to an agreed-upon price, or the City determines the project infeasible and elects to re-scope and re-solicit the work.
E. Proposals Rejection The City reserves the right to take the following actions:
1. Reject any or all proposals not in compliance with public procedures and requirements;
2. Reject any proposal not meeting the requirements set forth herein;
3. Waive any irregularities in proposals submitted;
4. Reject all proposals;
5. Award any or all parts of a proposal; and
6. Request references and other data to determine responsiveness.
F. Opening of Proposals There will be no public opening of proposals. Proposals received will not be available for inspection until after the evaluation process has been completed and the Intent-to-Award Notification is issued. However, the City will record and make available the identity of all Proposers after the opening.
Appendix A: Business Statement
1. Name of Business:
2. Business Address:
3. Phone: Email:
4. Business Classification (Check all that apply)
Individual Partnership Corporation Women or Minority Owned
5. Name of Owner:
6. Can firm meet insurance requirements specified in example professional services agreement (Appendix C)
Yes No
7. Are there claims that are pending against this insurance policy?
Yes: No:
If yes, attached explanation
8. During the past five years, has the firm, business, or any officer in the firm or business, been involved in any (1) bond forfeiture, (2) litigation personally involving the firm, business or any officer in the firm or business (other than dissolution of marriage), or (3) claims filed with any insurance carrier concerning the firm, business, or any officer in the firm or with any insurance carrier concerning the firm, business, or any officer in the firm or business?
9. Has company been in bankruptcy, reorganization or receivership in last five years?
10. Has company been disqualified or terminated by any public agency?
11. Proposal offers shall be good and valid for at least 60 days. Failure to concur with this condition may result in rejection of the offer. Does the firm accept this condition?
Having carefully examined all the documents of the solicitation, including the instruction, the undersigned proposes to perform all work in strict compliance with the above-named documents, as well as in compliance with all submitted proposal information accepts all the terms and conditions contained in the sample professional services agreement template (Appendix C)
Authorized Signature: Print Name:
Appendix B: Acknowledgement of addenda (if any)
Project Title: Cascade Locks Fire Station Solar + Storage Energy System Construction
Close:
I/We have received the following addenda (If none received, write “None Received”):
1. 2.
3. 4.
Date
Signature of Respondent
Design-Build Contract Cascade Locks Fire Station Solar Plus Storage Microgrid
DESIGN-BUILD CONTRACT (ORS 279C)
BY AND BETWEEN
CITY OF CASCADE LOCKS AND
This Agreement is made and entered into by and between the CITY OF CASCADE LOCKS, a political subdivision of the State of Oregon, hereinafter referred to as "Owner" or “City”, and , hereinafter referred to as "Contractor," for the Cascade Locks Fire Station Microgrid.
WITNESSETH:
IT IS HEREBY AGREED by and between the parties above-mentioned for and in consideration of the mutual promises hereinafter stated as follows:
1. Effective Date/Completion Date. This Agreement will be effective when it has been executed by both Owner and Contractor, however, Contractor shall not commence work on the Project until Contractor has received a notice to proceed from the City’s Representative. The Project shall be completed according to the schedule for completion set forth in the Contract Documents. The deadline for substantial completion shall be February 3, 2028. The deadline for final completion shall be April 3, 2028. All time limits stated in the contract documents are of the essence of this Agreement. Notwithstanding the provisions for contract time extensions in the General Conditions, the Contractor and City agree that timely completion of the work is essential to the success of the Project and approval for time extensions shall be only a last resort. Both parties agree to make every effort to recover “lost time”. The completion dates may be amended only by written agreement of the parties.
2. Exhibits. The following exhibits are attached hereto and are incorporated herein by this reference:
Exhibit A- Request for Proposals Exhibit B- Contractor’s Proposal Exhibit C- General Conditions Exhibit D- Bond Forms
Together with this construction contract, the foregoing documents constitute the Contract Documents.
3. Contractor's Services.
3.1. Contractor agrees to provide the services described in the Request for
Proposals which is attached hereto as Exhibit A and is incorporated herein by this reference.
3.2. Contractor agrees to provide the services listed in Contractor’s Proposal which is attached hereto as Exhibit B and is incorporated herein by this reference.
3.3. Contractor shall provide the services in the manner provided for in the General
Conditions which are attached hereto as Exhibit C and are incorporated herein by this reference.
3.4. Contractor shall comply with the July 5, 2026, Prevailing Wage Rates for Public
Works Contracts in Oregon, which may be accessed at:
http://www.oregon.gov/boli/WHD/PWR/Pages/index.aspx.
4. Contract Documents. The Contract Documents listed at Section 4.1 below are intended to reflect the Parties’ understanding of their respective rights and responsibilities concerning completion of the Work under the Agreement.
4.1. Interpretation. In the event of any inconsistency, conflict, or ambiguity between or among the Contract Documents, the Contract Documents shall take precedence in the following order:
4.1.1. All written modifications, amendments and change orders to this Agreement that have been executed by Owner following any required Owner approvals;
4.1.2. This Agreement, and all Exhibits, Schedules and Attachments to this
Contract, including Exhibit D, Special Conditions;
4.1.3. The General Conditions (Exhibit C hereto);
4.1.4. All design and construction drawings, Plans, Specifications and documents prepared and approved for the Project;
4.1.5. The RFP (Exhibit A hereto);
4.1.6. Contractors Proposal submitted in response to the RFP (Exhibit B hereto).
4.2. Ownership of Work Product. All drawings, Plans, Specifications, audits, reports, and other work product required to be delivered by Contractor under this Contract ("Work Product") shall be the exclusive property of Owner. Owner and Contractor intend that such Work Product be deemed “work made for hire.” If for any reason the Work Product is not deemed “work made for hire,” Contractor hereby irrevocably assigns to Owner all of its right, title and interest in and to any and all of the Work Product, whether arising from copyright, or any state or federal intellectual property law or doctrine. Contractor shall execute such further documents and instruments as Owner may reasonably request in order to fully vest such rights in Owner. Contractor forever waives http://www.oregon.gov/boli/WHD/PWR/Pages/index.aspx any and all rights relating to the Work Product, including without limitation, any and all rights arising under 17 USC §106A or any other rights of identification of authorship or rights of approval, restriction or limitation on use or subsequent modifications.
4.3. Contractor, notwithstanding other conditions in this Section 4, shall have, with
Owner’s written permission, the right to utilize such Work Product on its brochures or other literature that it may utilize for marketing and sales, and in addition, Contractor may use standard line drawings, specifications and calculations on other unrelated projects.
4.4. If Owner reuses or modifies the Work Product without Contractor's involvement or prior written consent, Owner shall to the extent permitted by Article XI, Section 7, of the Oregon Constitution and by the Oregon Tort Claims Act, indemnify Contractor against liability for damage to person or property arising from Owner’s reuse or modification of the Work Product, provided Owner shall not be required to indemnify Contractor for any such liability arising out of or related to the wrongful or negligent acts of Contractor or Contractor's employees or agents.
5. Consideration. Owner shall pay Contractor a fee for service in the amount of
_________________________, said amount to be the complete compensation to Contractor for the services performed under this Agreement.
Unless otherwise stated herein or agreed to in writing by the parties, payment shall be made upon completion of the project. Contractor may submit invoices upon completion of the following payment milestones:
I. Initial Milestone Payment A: Up to thirty percent (30%) of the Contract Sum may be invoiced following execution of this Contract, filing of interconnection request, and submission of an invoice documenting project initiation, including design, permitting, engineering, project management, bonding, and/or procurement initiation.
II. Interim Milestone Payment B: Up to thirty percent (30%) of the Contract Sum may be invoiced upon completion of both of the following:
a. Contractor’s submission of documentation that major Project components have been ordered, procured, delivered to the Project site, or delivered to another storage location approved by Owner. Major Project components may include, without limitation, PV modules, inverters, MLPE, racking, electrical balance-of-system materials, battery energy storage equipment, and subcontractor materials. Documentation may include supplier invoices, purchase orders, proof of payment, delivery receipts, or other documentation reasonably acceptable to Owner.
b. Demonstrated approval from the local authority having jurisdiction (AHJ) for construction or installation of the renewable energy system to start at the project location or can start no later than 60 days of the submission of this request, and not later than the required construction start date.
Documentation may include, but is not limited to, permitting documents, bills of lading, contractor agreements, direct work invoices or other relevant and timely documentation. Required evidence shall include: (1)
Actual permit copy and/or statement showing the authority having jurisdiction (AHJ) of the system, permit number and date of permit approval for work directly related to the renewable energy system or resilience aspects, and (2) Additional evidence as described above that clearly shows construction or installation directly related to the renewable energy system has started or will start at the project site location no later than 60 days of the request submission. The list above is not exclusive.
Photographs of site work are welcome but do not suffice as documented evidence as requirement above.
III. Final Payment C: The remaining Contract balance may be invoiced upon final completion, testing and commissioning, resolution of punchlist items, acceptance of the Project by Owner, and submission of required closeout documentation including certified payroll records, lien waivers, warranties, operation and maintenance manuals, and other documentation required under the Agreement.
Owner may reject or request clarification regarding any invoice that is incomplete, inconsistent with the applicable milestone, or not supported by documentation required under the Agreement.
Unless otherwise stated herein or agreed to in writing by the parties, payment shall be made upon completion of the project. This Agreement is subject to the appropriation of funds by Owner, and/or the receipt of funds from state and federal sources. In the event sufficient funds shall not be appropriated, and/or received, by Owner for the payment of consideration required to be paid under this Agreement, Owner may terminate this Agreement in whole or in part without penalty in accordance with Section 26 of this Agreement.
6. Contract Representatives. Contract representatives for this Agreement shall be:
FOR CITY FOR CONTRACTOR
Gordon Zimmerman, Interim City Administrator [Name, Title] 140 WaNaPa St. [Business Address] Cascade Locks, OR 97014 [Business Address] 541-386-1301 [Phone Number] cityadministrator@cascade-locks.or.us [Email Address]
All correspondence shall be sent to the above addressees when written notification is necessary. The Contractor understands and agrees that only the Owner’s Contract Representative is authorized to give Contractor work authorizations, issue written approvals and notices to proceed. If any work is done by Contractor without mailto:cityadministrator@cascade-locks.or.us prior written authorization by the Owner’s Contract Representative, the Owner will not be obligated to pay for such work. Contract representatives can be changed by providing written notice to the other party at the address listed.
7. Permits; Licenses; Bonds; Qualifications. Unless otherwise specified, Contractor shall procure all permits, licenses and bonds, pay all charges and fees and give all notices necessary for performance of this Agreement prior to commencement of work. Contractor, by entering into this Agreement, represents that all personnel assigned to the work required under this Agreement are fully qualified to perform the work to which they will be assigned in a skilled and workmanlike manner and, if required to be registered, licensed or bonded by the state of Oregon, are so registered, licensed or bonded.
8. Compliance with Codes and Standards. Contractor shall at all times observe and comply with all federal and state laws, administrative rules and regulations issued thereunder, and with all applicable ordinances, and building, health and sanitation laws and codes. Contractor shall engage in no activity which creates an actual conflict of interest or violates the Code of Ethics as provided by ORS Chapter 244.
9. Reports.
9.1. Contractor shall provide Owner’s Contract Representative with periodic reports about the progress of the project as requested by Owner.
9.2. Within 90 days of the completion of the project, the Contractor will provide to the Owner one reproducible set of as-built drawings based on mark-ups by the Contractor, which are reviewed for general conformance by the Contractor and appropriate consultants. In addition, Contractor will provide to the Owner digital copies of AutoCAD formatted construction documents and MS Word formatted specifications in CD-ROM format.
10. Guarantee. Contractor guarantees all work under this Agreement against all defects in materials and workmanship. This guarantee shall extend from the date of completion by the Owner for the period of a minimum of five years, or longer, if so specified in the Contract Documents. Contractor shall promptly make all necessary repairs or replacements to correct any defects in workmanship or materials for which notice in writing has been sent to the Contractor from the Owner’s Contract Representative within the guarantee period. In the event Contractor fails to take any action to correct conditions covered by this guarantee promptly after notice of such condition, Owner may do so, and Contractor and its surety shall be liable for the cost thereof. Normal wear and tear and the results of accidents not chargeable to Contractor or its agents are excepted from the above requirements.
11. Qualified Work. By signing this Agreement, Contractor represents that all personnel assigned to the work required under this Agreement are fully qualified to perform the work to which they will be assigned in a skilled and workmanlike manner and, if required to be registered, licensed or bonded by the State of Oregon, are so registered, licensed or bonded.
12. Independent Contractor. Contractor is engaged hereby as an independent contractor and shall not be considered an employee, agent, partner, joint venturer or representative of Owner for any purpose whatsoever. Owner does not have the right of direction or control over the manner in which Contractor delivers services under this Agreement and does not exercise any control over the activities of the Contractor, except the services must be performed in a manner that is consistent with the terms of this Agreement. Owner shall have no obligation with respect to Contractor’s debts or any other liabilities of Contractor. Contractor shall be responsible for furnishing all equipment necessary for the performance of the services required herein. In addition:
12.1. Contractor will be solely responsible for payment of any Federal or State taxes required as a result of this Agreement.
12.2. This Agreement is not intended to entitle Contractor to any benefits generally granted to Owner’s employees. Without limitation, but by way of illustration, the benefits which are not intended to be extended by this Agreement to the Contractor are vacation, holiday and sick leave, other leaves with pay, tenure, medical and dental coverage, life and disability insurance, overtime, social security, workers' compensation, unemployment compensation, or retirement benefits (except insofar as benefits are otherwise required by law if the Contractor is presently a member of the Public Employees Retirement System).
12.3. The Contractor is an independent contractor for purposes of the Oregon workers' compensation law (ORS Chapter 656) and is solely liable for any workers' compensation coverage under this Agreement. If the Contractor has the assistance of other persons in the performance of the Agreement, the Contractor shall qualify and remain qualified for the term of this Agreement as a carrier-insured or self-insured employer under ORS
656.407. If the Contractor performs this Agreement without the assistance of any other person, unless otherwise agreed to by the parties, Contractor shall apply for and obtain workers' compensation insurance for itself as a sole proprietor under ORS 656.128.
13. Statutory Provisions. Pursuant to the requirements of ORS 279C.500 through
279C.530 and Article XI, Section 10 of the Oregon Constitution, the following terms and conditions are made a part of this Agreement:
13.1. Contractor shall:
13.1.1. Make payment promptly, as due, to all persons supplying to Contractor labor or material for the performance of the work provided for in this Agreement. [ORS 279C.505 (1)(a)]
13.1.2. Pay all contributions or amounts due the Industrial Accident Fund from the Contractor or any subcontractor incurred in the performance of this Agreement. [ORS 279C.505 (1)(b)]
13.1.3. Not permit any lien or claim to be filed or prosecuted against the City on account of any labor or material furnished. [ORS 279C.505 (1)(c)]
13.1.4. Pay to the Department of Revenue all sums withheld from employees under ORS 316.167. [ORS 279C.505 (1)(d)]
13.1.5. Demonstrate that an employee drug testing program is in place. [ORS 279C.505 (2)]
13.2. If Contractor fails, neglects or refuses to pay promptly a person’s claim for labor or services that the person provides to Contractor or a subcontractor in connection with this Agreement as the claim becomes due, the proper officer that represents the City may pay the amount of the claim to the person that provides the labor or services and charge the amount of the payment against funds due or to become due Contractor by reason of this Agreement.
The City reserves the right to make payments directly or by multiple- payee check payments. Upon City’s request, Contractor shall furnish to the City the information required to facilitate such payments with each application for payment, including (1) names, addresses, and telephone numbers of persons making any such claim for labor, equipment, services or material, and (2) a complete listing of outstanding amounts owed to all such persons.
[ORS 279C.515 (1)]
13.3. If Contractor or a first-tier subcontractor fails, neglects or refuses to pay a person that provides labor or materials in connection with the public improvement contract within 30 days after receiving payment from the contracting agency or a contractor, the contractor or first-tier subcontractor owes the person the amount due plus interest charges that begin at the end of the 10-day period within which payment is due under ORS 279C.580 (4) and that end upon final payment, unless payment is subject to a good faith dispute as defined in ORS 279C.580. The rate of interest on the amount due is nine percent per annum. The amount of interest may not be waived. [ORS 279C.515 (2)]
13.4. If the Contractor or a subcontractor fails, neglects or refuses to pay a person that provides labor or materials in connection with this Agreement, the person may file a complaint with the Construction Contractors Board, unless payment is…