About this file

This document is a Special Notice for an Industry Day event hosted by the National Park Service (NPS) Denver Service Center regarding the reconstruction of approximately 1,355 linear feet of seawall adjacent to the Castillo de San Marcos National Monument in St. Augustine, Florida.

The project consists of five different segments: North Wall, North Transition Wall, Center Wall, South Wall, and South Transition Wall. The existing walls will be removed and replaced with new designs that recreate the historic character while maintaining the current alignment. The solicitation for the construction project is scheduled to be posted in 2025. The Industry Day event on May 14, 2024 will allow prospective contractors to view the site and provide input on the development of the requirements. Contractor attendance is limited to 5 personnel per firm, and security requirements include providing names and email addresses by May 8, 2024 for attendance approval. No personal protective equipment is required for the site visit.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CASTILLO DE SAN MARCOS INDUSTRY DAY

May 14, 2024

The National Park Service (NPS) Denver Service Center (DSC), 12795 W. Alameda Parkway, Denver, Colorado seeks to gain knowledge from the industry regarding an exciting opportunity to reconstruct the historic seawalls around the Castillo de San Marcos, St. Augustine, FL. The project consists of 1,355 feet of seawall construction along the Matanzas River.

This announcement is to gage interest in the number of firms who would attend a Site Visit which would allow prospective Seawall Contractors to view the site as well as provide input for the development of these requirements.

Background:

This project will reconstruct roughly 1,355 lineal feet of seawall adjacent to the Castillo de San Marcos

National Monument in St. Augustine, FL. Reconstruction of the seawall consists of five different segments:

• North Wall is constructed out of poured concrete with coquina shells as the main aggregate measuring 280 feet long. This wall will be removed and replaced with a new design that will recreate the historic character of this section while maintaining the current alignment.

• North Transition Wall is constructed out of large coquina blocks measuring 40 feet. This wall will be removed and replaced with a new design that will recreate the historic character of this section while maintaining the current alignment.

• Center Wall is a massive counterguard outwork comprised of coquina masonry walls founded on granite blocks measuring 740 feet long. Repointing of the granite and coquina and removal and replacement of the top layer of capstone and tabby material is slated for this section.

• South Wall is constructed out of coquina block with a concrete cap measuring 225 feet. This wall will be removed and replaced with a new design that will recreate the historic character of this section while maintaining the current alignment.

• South Transition Wall is constructed out of concrete panels measuring 70 feet and will be replaced in kind in a new alignment to connect the current historic wall to the new seawall being constructed by the Florida DOT.

The solicitation for the project is scheduled to be posted in 2025.

Meeting Date and Times (All times shown below are Eastern Time (ET)

Tuesday, May 14, 2024, from 11:00 am – 6:00 pm

Contractor meetings will be an hour from 11:00 am to 6:00 pm and will be based on number of contractor respondents. Agenda with time and meeting locations will be sent out later to each firm attending. Attendance of contractor personnel will be limited to 5 people.

Security Requirements:

No later than May 8, 2024, all prime contractors, subcontractors, material suppliers and other vendors who plan to attend the construction contractor industry day will need to provide their full name, company name and email address which is required for attendance. Participants will not be admitted to the event without prior approval. Attendance of contractor personnel will be limited to 5 people.

Personal Protective Equipment (PPE):

PPE and life jackets are not required (or provided). Site visit is near open water. This visit will involve short walking on some rough surfaces but flat or nearly flat terrain.

Meeting Date Location:

Castillo de San Marcos National Park Service Headquarters, 1 S Castillo Dr, St. Augustine, FL 32084. Pay parking is available at the lot south of the Fort (shown below). We will meet at the designated time (to be determined) at the entrance of the National Park Service Headquarters located Northwest of the Fort.