Carroll Building Boiler Replacement Addendum .pdf

PDF 41 KB Posted

Attached to
Carroll Building Boiler Replacement
Solicitation number
PE-53900-RFQ-2025-000000048
Issued by
Brooks County, Georgia

About this file

This is an Addendum (#1) issued for the Carroll Building Boiler Replacement project at Georgia Southern University in Statesboro, Georgia. Due to the impacts of Winter Storm Enzo, two significant schedule changes have been made: the Mandatory Pre-Bid Conference has been rescheduled from January 23rd at 10:00 am EST to January 30th at 10:00 am EST, and the Bid Opening has been moved from February 7th at 2:00 pm EST to February 14th at 2:00 pm EST. All other dates and locations for the project remain unchanged.

The related contract opportunity involves the installation of a new boiler system, including mechanical, electrical, controls, equipment, and accessories per design specifications. Bidders can obtain plans, specifications, and bid documents through Clayton Digital Reprographics at www.CDRepro.com, with technical support available at 912-681-3700. The notice specifically warns against obtaining documents through unauthorized sources.

View the file

Other files

File Type Posted
Invitation to Bid Carroll Building Boiler Rep.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #1

January 22, 2025

Project:0209-24027

Carroll Building Boiler Replacement

Georgia Southern University

Statesboro, Ga 30458

DUE TO THE IMPACTS OF WINTER STORM ENZO, THE FOLLOWING

SCHEDULE CHANGES HAVE BEEN MADE

Description:

-Mandatory Pre-Bid Conference Time Change

-Bid Opening Time Change

• The Mandatory Pre-Bid Conference has been changed from the current scheduled time of Thursday January 23rd at 10:00 am EST to January 30th at 10:00 am EST.

• The Bid Opening has been changed from the current scheduled time of Friday

February 7th at 2:00 pm EST to Friday February 14th at 2:00 pm EST

ALL OTHER DATES & LOCATIONS REMAIN THE SAME

-END OF ADDENDUM-

File details come from the government source that posted it. Updated .